Post

TUNGSTEN. The hardest metal — and the hardest monopoly.

Nothing replaces tungsten: not in a cutting tip, not in a drill bit, not in an armour-piercing core. And 80% of output is one state’s monopoly. ❌ What’s wrong: tungsten is mined from ore, and there…

Nothing replaces tungsten: not in a cutting tip, not in a drill bit, not in an armour-piercing core. And 80% of output is one state’s monopoly.

❌ What’s wrong: tungsten is mined from ore, and there you change nothing. But part of it sits in mine water — already at the surface, still not called feedstock, because nobody knows how to pull it out. That water is pumped round the clock to keep the mine dry, then dumped into ponds or straight into rivers, killing them. And it is not the water that kills, but the copper, zinc, arsenic in it — and, take note, our tungsten!

❌ The numbers speak for themselves:

→ China — ~80% of output, export curbs since 2023

→ APT in China: $105,775/t; Rotterdam $3,100/mtu

→ Prices up ~200% since 2023

→ ~60% of tungsten and alloys: cutting tips, drill bits

→ Defence: armour-piercing cores, ammunition, missiles

→ Scrap covers only 30–35% of Western demand

Korea has such a mine, but just one — Sangdong.

❌ What flows out? Panasqueira, Portugal: pH 2.9–3.2, copper 42.7 mg/L, zinc 49.2 mg/L, arsenic 2,140 µg/L — into the Zêzere river. Dissolved tungsten in drainage reaches 140 µg/L, in Nevada 337 µg/L. The fishery limit is 0.8 µg/L — exceeded hundreds of times. A poison, and a metal everyone wants!

❌ The scale. Europe dumps ~4 M t of salts into its rivers every year — chlorides and sulphates leached from coal seams. Damage in the Vistula basin: up to $250 M a year. Reverse osmosis fails: 12–15 kWh/m³ and 60% of the volume leaves as an even more toxic brine with nowhere to put it. EU rules demand zero discharge by 2027. The clock runs, no solution.

🟢 How to break the monopoly? ARBOK found the answer.

→ ARBOK-ZWD — deep-vacuum stream separation, 6–40 °C, ~1 kPa.

🟢 How it works:

A module at the pond processes 100% of what it takes:

→ 100 m³ of mine water → 100 t clean water + 12 t dry salt

→ salts and metals, tungsten included, are separated. Then refining.

→ Energy: under 1 kWh/t — $0.08/t vs $2–2.5 for RO

→ No membranes, no filters, no chemicals

→ Module: 200 t/day, 24/7/365, 10–20 years

🟢 Economics per 1,000 m³/h stream, 8.8 M m³/year:

→ Salt: ~1,050,000 t × $60 = ~$63 M

→ Copper: ~376 t × $14,300 = ~$5.4 M

→ Zinc: ~433 t

→ Tungsten: ~3 t × $150,700 = ~$0.45 M

→ Energy: ~$0.7 M — whole OPEX

→ Plus 8.8 M m³ of water ($10 M), no discharge, no fines

Total ~$78 M/year from one pond.

🟢 ARBOK business model: 15–20 year off-take paid per operation; equipment sales, 7 year payback.

🟢 Where it changes everything

→ Europe: Russia, Poland, Czechia, Germany, Portugal, Spain

→ USA/Canada: Appalachia, Berkeley Pit, hundreds of mines

→ Asia (Korea, China, Vietnam), Africa, Australia, Latin America

🟢 Bottom line: tungsten is not scarce — it is poured away, killing rivers.

The water is already pumped up, the metal is in it — just take it. Instead they pay twice: the monopolist for tungsten, the state for discharge. ARBOK turns both into revenue.

@Arbok #Tungsten #CriticalMinerals #ZWD


Also published on: LinkedIn — Michael Vischmidt