☀️ Tellurium: the solar metal nobody actually mines. ❌ Nowhere in the world is it mined on purpose. Anywhere. World tellurium output runs **500–750 t/year** — less than gold. It has no mine of its own:…

☀️ Tellurium: the solar metal nobody actually mines.

❌ Nowhere in the world is it mined on purpose. Anywhere.

World tellurium output runs **500–750 t/year** — less than gold. It has no mine of its own: over **90%** is skimmed off copper anode slime, a by-product of electrolytic copper refining. However much copper the world smelts, that is how much tellurium there will be — and demand is now set not by copper but by solar.

  • CdTe thin-film modules take **~40%** of all tellurium consumption — beating silicon on yield per watt with less material.
  • CdTe capacity grew from **2.8 GW** in 2022 to **14 GW/year** by 2026–2027; the industry plans **100 GW by 2030**.
  • The second channel is Bi₂Te₃ thermoelectrics: cooling for optics, sensors, spacecraft.

The arithmetic does not close: output trails announced capacity several times over.

❌ Baseline figures:

  • Tellurium: **~$120–245/kg** depending on purity and market.
  • China: **~75%** of world output (2024), and the share is rising.
  • **>90%** of tellurium comes from copper anode slime.
  • Content in the slime — **1–4%** by mass, locally **8–9%**, **0.5–22%** across sites.
  • CdTe consumption: **15.2 t/GW** for modern modules against **~93 t/GW** for early ones.

🟢 ARBOK’s technology — the same platform that takes gold from anode slime and rhenium from mine waters:

  • deep vacuum (**~1 kPa**), ambient temperature
  • tellurium concentrates in the residual liquor → finished by a secondary pass
  • copper, selenium, gold and silver recovered alongside from the same slime
  • ballast salts leave by density and do not foul the sorbent
  • **100% water return** by volume
  • no furnaces, no roasting, no consumables: minus SO₂, minus CO₂, minus fines.

Refinery effluents run the same tract — tellurium that left the slime for solution is lost with them today.

🟢 Economics.

Per **1 t** of anode slime at **2% Te**:

  • **~20 kg of tellurium → ~$3,600**
  • + selenium, copper, gold and silver from the same tonne
  • + refinery-effluent neutralization removed

At **4%** the same tonne yields **~$7,200**. Slime is not waste — it is the richest concentrate on a copper refinery. Tellurium is simply taken from it partially, and from the effluent not at all.

🟢 At scale:

  • **100 GW** of CdTe by 2030 at **15.2 t/GW** requires **~1,520 t** of tellurium a year — two to three times everything the world produces today. No new mine closes that gap, because tellurium mines do not exist. Only completeness of recovery from copper closes it.
  • Every copper refinery outside China holds a quarter of the world’s tellurium and the independence of the solar industry. Full recovery at existing plants costs less than any new project.

🟢 Where it changes everything:

  • Chile, Peru, USA, Poland, Zambia — copper refineries
  • Solar power — CdTe without the Chinese quota
  • Space and optics — Bi₂Te₃ thermoelectrics

🟢 Bottom line: tellurium does not have to be found. It is already out of the ground with the copper, sitting in anode slime and refinery effluent that must be processed anyway. ARBOK turns processing into recovery.