❌ Gold isn’t only in the ground — it is dissolved in effluent and flushed away.
Gold is not just bullion: it is processor contacts, connectors, aerospace electronics, where nothing matches it for conductivity and corrosion resistance. Everywhere it is mined and processed, it keeps leaving in the water.
- Cyanide leaching: gold goes into solution as the dicyanoaurate ion [Au(CN)₂]⁻; part never loads onto the carbon and leaves in recycle and tailings solutions. Cyanide tailings still hold **1–8 g/t**.
- E-waste: the world produced **~72 million t** of electronic waste in 2026 and is heading for **82 million t by 2030**. Of the gold that ends up in e-waste, only **10–15%** is recovered; the other **85%** is lost. Recover **30%** of that and it comes to **~$8,800 million**.
- Copper anode slime: a precious-metal concentrate where gold sits with the copper, needing its own leach.
❌ Baseline figures:
- Gold: **~$129,000/kg** (July 2026). Forecast for end-2026 — **~$161,000/kg** ($5,000 an ounce).
- Only **~10%** of secondary gold comes from electronics — **100–150 t/year**.
- Cyanide tailings: **1–8 g/t** gold. Barren solutions give back **60–90%** of the cyanide and up to **99.98%** of the copper.
🟢 ARBOK’s technology:
vacuum separation:
- deep vacuum (**~1 kPa**), ambient temperature, **~0.7 kWh/m³**
- **100% water return** by volume
- dicyanoaurate concentrates in the residual liquor → finished by a secondary pass
- ballast salts leave by density, not fouling the sorbent
- no high temperature or pressure, no mercury, no chemicals, membranes or consumables, no CO₂, no fumes, no noise.
For ore, rock and seawater there is a separate track — Arbok-Gold: gold binding without mercury or cyanide, viable from **1 g per 2.2 t** of rock.
🟢 Economics.
One module (**200 m³/day ≈ 70,000 m³/year**) at **0.5 mg/L Au** (design basis; barren solutions run 0.01–0.05 mg/L, loaded ones 1–5 mg/L — set by site assay):
- **~35 kg gold/year → ~$4.5M/year**
- + cyanide recovery **60–90%** — **~$0.07M/year**
- + **70,000 m³** of water back into circulation — **$0.07M**
- + cyanide detoxification removed — **~$0.11M/yr**
TOTAL per unit: net profit **~$4.5M/year** + cost savings **~$0.25M/year**. Altogether **~$4.75M/year**
🟢 At scale:
- **85%** of the gold in e-waste is lost today — **~228 t of gold a year, ~$29 billion** at 2026 prices. This is the absence of an effective technology, and the water-phase recovery gap it creates.
- Gold mining cycles cyanide through a closed loop that must be detoxified anyway: of **3,300 t** of world output **~80%** goes through cyanidation, and sodium cyanide use passed **1.2 million t/year** — **25–50 g** per gram of gold.
🟢 Where it changes everything:
- Gold mines — recycle and tailings cyanide solutions
- E-waste processors — board leaching solutions
- Copper refineries — anode slime
- Electronics and aerospace — contact feedstock
🟢 Bottom line: gold does not have to be mined again. It is there in cyanide solutions, board-leaching effluent, anode slime — all of which must be cleaned anyway. ARBOK knows how, and turns treatment into recovery.
@Arbok #Gold #Ewaste #ZWD