The Copper Deficit Is Solvable: The Cure Is Lying in a Drainage Ditch

By 2035 the world will be short of 25% of its copper. Demand grows with EVs, grids, wind turbines and data centers; supply runs into geology. Copper content in ores has fallen by 40%: the same…

By 2035 the world will be short of 25% of its copper. Demand grows with EVs, grids, wind turbines and data centers; supply runs into geology. Copper content in ores has fallen by 40%: the same ton of metal now takes two-thirds more rock to crush, haul and process. Scrap does not help: it covers 18% of consumption. The remaining 82% still has to come out of the ground, and the ground gives less and less.

The industry answers as it always has: new deposits, new pits, new layers stripped. Every such ton costs more than the last in energy, water, emissions and conflicts with residents.

Meanwhile, at the same mines the opposite happens: companies pay millions to get rid of liquid effluent full of the very copper already mined, and simply dump it into lakes. How to recover it, nobody knows.

Arbok not only “knows” but “can”: with our technology we can return up to 30% of the copper deficit. And we clearly count not everything: smelter effluent is not included.

The liquid deposit

At 30–300 mg/L, an acidic lake of 100 000 m³ holds 3–30 t of dissolved copper. An operating mine with a flow of 1 000 m³/h passes about 9 million m³ of effluent a year: 270–2 700 t of copper annually.

One pass

ARBOK ZWD works differently. It is cold boiling: vacuum separation at ambient temperature, with no heating, chemicals, membranes, filters or coagulants. Water is separated from all dissolved salts and returned up to 99.98% pure. The salts are separated by density into dry commercial fractions:

  • copper concentrate;
  • iron;
  • zinc, aluminum and other metals as salts;
  • arsenic and lead as metals, that is, a product and not a poison for burial;
  • concentrated acid.

Only an inert residue remains: calcite, stones, sand. It is rubbish, not waste. No sludge, no brine, no landfill. Neutralization happens by itself: the acid went into a commercial fraction, so the water became neutral. Output: pH 6.9, industrial and irrigation quality.

SGS. Energy measured at 0.65 kWh per 1 m3, NETTO. GROSS: 1-2 kWh. The equipment is a vertically mounted 20 ft container for 200 m³ a day, does not corrode at pH below 3. Lasts 20 years. On solar panels CO₂ emissions are zero; from the grid about 28 t versus 200–400 t for conventional treatment.

Scrap gives 18% and is limited by the past: it is what has already been mined and used. Copper waters are replenished every day while the mine operates. This is the source of copper that grows with mining, not against it.

The world waits for copper to be found deeper, farther and at greater cost. All this time it flows through the red lakes and streams of the mines, dissolved and already paid for by mining. The estimated global effect of the technology is up to 30 billion dollars a year.

Copper does not run out. It is simply poured into ponds.