The world mines 2,500 t of tantalum a year. Congo supplies 1,300 t, Rwanda 400 t, Nigeria 390 t, Brazil 190 t. Two Central African countries hold two thirds of the supply. The ore is coltan,…

The world mines 2,500 t of tantalum a year. Congo supplies 1,300 t, Rwanda 400 t, Nigeria 390 t, Brazil 190 t. Two Central African countries hold two thirds of the supply. The ore is coltan, mined by hand, and the road from the pit to the plant runs through hands the buyer prefers not to think about.

Half of the metal goes into one part

About 50% of tantalum goes into the tantalum capacitor. It sits in phones, engine control units, pacemakers and satellites. There is nothing to replace it with.

From the landfill, almost nothing comes back

About 30% of consumption returns to circulation, but that is production scrap. From what the consumer throws away, less than 1% is recovered. Boards are collected mostly to get the gold out of them.

Every year more than 1,000 t of tantalum ends up in discarded equipment. That is more than half of what Congo and Rwanda produce together, and more than $200 mln a year as oxide at $180/kg. In 2026 the world will throw away 72 mln t of e-waste, and 82 mln t by 2030.

Recyclers lose tantalum to slag

Electronics are shredded, smelted and leached. Tantalum earns nothing and takes the most aggressive mixtures to dispose of, so little of it is recovered from this waste. It goes to slag and into road base. It is buried in pits in Congo, and in Europe and the US it is buried in neat dumps.

ARBOK changes the line, not the plant

ARBOK places a container module on the liquid waste at the recycler, the board-leaching solutions. Vacuum, ambient temperature, no heat supplied from outside. Water returns clean, up to 99.98% of the volume, at 0.72 kWh/m³ net. Everything dissolved stays in the concentrate: gold, palladium, copper and tantalum. No membranes, no reagents, no consumables. Acidity and dozens of metals in the solution do not bother the module: it filters nothing and precipitates nothing, it removes the water. It recovers the acid and returns it to the process.

This is a new kind of mine: the board has already been ground, the metals are already in solution, and the solution is replenished with a new batch.

Gold pays for the module, tantalum comes on top

A 200 m³/day module gives about 35 kg of gold a year, about $4.5 mln. Gold goes in the same line with tantalum, no separate unit is needed. Its price covers all costs and the price of tantalum equals zero. Payback 5 to 7 years.

The recycler no longer hauls acidic effluent, waits in line at the landfill, buys neutralization reagents or throws tantalum into slag. It accepts all electronics, and the more it takes in, the better. A stopped payment is income.

Two numbers

The US does not mine tantalum at all, although it discards almost the most electronics in the world. A market of about $100 mln a year is all imported. Worldwide the market is about $0.5 bln.

Tantalum sits in jet-engine blades, in defense electronics, in implants. A country without its own tantalum depends on two African suppliers where interruptions are unacceptable. Secondary tantalum has no pit, no checkpoint and no origin audit. The deposit sits where the metal is consumed, and nobody can embargo someone else’s landfill.

Tantalum does not need to be found. It needs to stop being buried.