Magnesium does not run out in the ground. It runs out in the retort. The world smelts about 1 mln t of primary magnesium a year, and about 950,000 t of it, i.e. 88%, comes from China. There a dolomite mountain is calcined, mixed with ferrosilicon and heated in vacuum retorts until the metal turns to vapor. It is not that magnesium is missing elsewhere. There is more of it everywhere than anyone needs. Nobody else ever wanted to mine and process it on their own — it was easier to buy from the one who invested in producing it at scale, at comparatively low prices.
China is named, so what does Texas have to do with it? Magnesium is not only in the Chinese mountain. It is dissolved in the water that Texas oilmen pay to pump back into the ground, and there is so much of it that the Permian Basin alone would cover 38% of world metal production. The whole logic of the project follows from simple arithmetic.
Who makes magnesium today
At about $2,400/t, the magnesium market is about $2.5 bln a year. China produces about 950,000 t of it, and everyone else — 12%. Russia, Israel, Turkey, Brazil and Kazakhstan share that.
The Chinese chain is heavy: the mountain is quarried, crushed, calcined, reduced. Coal, transport and a waste dump at every stage. The price of magnesium is the price of coal, ferrosilicon and logistics, and it moves along with them.
Another source
Of the 12% that is not China, the most interesting is getting magnesium from waste, or from salt springs and lakes. The best known in the world, for example, is the Dead Sea. Its brine is unique: about 350 kg of salts per cubic meter, of which about 13% is magnesium ions. That is about 45 kg of magnesium in every cubic meter. The classical route: evaporation ponds precipitate carnallite, magnesium chloride is made from it, and magnesium chloride is the feedstock from which electrolysis to metal begins. Israel supplies about 47% of American imports of magnesium metal — more than any other supplier.
The price of this scheme is paid not in a wallet but by the lake. The level of the Dead Sea has dropped by about 45 m and keeps falling by 1.0–1.2 m a year. The Jordan River used to bring about 1.3 bln m³ of water a year to the sea, but today, because of climate change and growing agricultural development, which is unthinkable without water, less than 100 mln m³ reaches the Dead Sea from Kinneret. Evaporating scarce water into the atmosphere is the payment for salt, and the lake pays it by drying out.
Where else the “invisible” magnesium is
The Permian Basin, Texas and New Mexico. Together with oil it lifts more than 20 mln barrels of produced water a day, about 3.2 mln m³. Salinity about 12%, 4 times saltier than the sea. Part of the water goes to fracking, the rest is pumped back into disposal formations at $0.75–1.25 per barrel.
The magnesium in that water is ± 730 mg/L. If we take even half for the calculation, it is 350 mg/L. Even at that level, the annual flow of the Permian Basin carries more than 400,000 t of magnesium. That is almost 40% of world metal production — from a single basin, and with a cautiously halved figure. Moreover, the magnesium sits in water that is already being pumped today and is essentially waste, and disposing of it — that is, pumping it back underground with powerful compressors — has to be paid for again: fines, injection licenses, and a great deal of electricity. They pay for it, but not for the sake of magnesium. At an average of 730 mg/L it comes to about 850,000 t of potential magnesium, that is almost 80% of all world output. Who will call us smart?
The Permian Basin is not the only such stream. Germany, the Werra potash district in Hesse. We have already written about it: https://www.linkedin.com/pulse/salt-mountain-unclaimed-deposit-what-monte-kali-us-michael-vischmidt-m9oaf/ Ore processing gives about 5 mln m³ of brine a year with a salinity of about 400 g/L, of which magnesium chloride is 270–310 g/L. Converted to a dry fraction, that is about 1.12 mln t of MgCl₂ a year, i.e. about 290,000 t of magnesium — 26% of world metal production. Magnesium chloride is hygroscopic and crystallizes poorly, so it stays in the water and goes to waste along with it. And now, in 2027, they want to close this mine for environmental reasons. Do you hear that?
Why nobody takes it
The classical route — ponds and carnallite — pays only on rich brine. The entire volume of water has to be evaporated, however little magnesium it holds. The Dead Sea has 45 kg of magnesium per cubic meter, Permian water 0.35–0.73 kg. At an average of 730 mg/L it is about 60 times poorer. Nobody will build a magnesium plant on such water. It is not profitable, it is easier to buy.
So the water goes underground. And that is a problem in itself: induced seismicity, tightening rules, farmers’ land salinized after leaks. The operator pays to hide the water, and with the same money buys risk.
The same pass, no second unit
ARBOK treats produced water in the state in which it arrives. Cold boiling under deep vacuum at ambient temperature: no heat is supplied from outside, no furnaces, no membranes, no expensive reagents. Separation happens in a single pass, inside the solution itself. Water leaves as vapor and condenses; water recovery is 99.98%. Salts come out as dry fractions: magnesium as a separate magnesium chloride fraction, bromine and iodine as separate products. No liquid concentrate remains to be pumped back.
For magnesium, one property decides everything: process cost is set by water throughput, not by the concentration of the element. A brine at 100 mg/L and a brine at 45,000 mg/L pass through the same unit on the same terms. The threshold at which the classics stop does not exist here. Brine of any strength, up to 35.5% — the level of the Dead Sea — is processed at the same energy consumption.
No second unit, no second feed line, no second crew: magnesium chloride comes out of the same pass as water, salt, bromine and iodine.
The equipment is containerized and modular. A standard unit handles 200 m³ a day. A site on 10,000 barrels a day is about 1,600 m³, that is 8 units. Specific energy is 0.72 kWh/m³ net. That is all.
What the site operator gets
We count through the eyes of the operator’s accountant, the one who pays today. A site on 10,000 barrels a day, 350 operating days — about 3.5 mln barrels, or 550,000 m³ of water a year.
Today the operator pays $0.75–1.25 per barrel for injection (about $4.7–7.9 per m³). That is $2.6–4.4 mln a year that the operator stops paying. A payment that stops is income, not “cost savings”.
Water: 99.98% of the stream leaves as distillate. At a reference $1.5 per barrel of water for fracking and technical needs — about $5.2 mln a year.
Salt: about 67,000 t of dry salt a year, mostly NaCl. At $60/t — about $4 mln.
Iodine and bromine: iodine at 10–50 mg/L — from $0.4 to $2 mln, bromine at 500 mg/L — 278 t and $0.8 mln.
Magnesium: at 350 mg/L — about 200 t of magnesium a year, that is about 780 t of magnesium chloride as a separate dry fraction. At a reference price of $600 per ton — about $0.47 mln.
Energy for the whole stream — about 400 MWh, roughly $40,000 a year at $0.10/kWh.
Bottom line: the producer gets $13.5–17 mln a year from a single site on 10,000 barrels a day. Payback — 5–7 years.
Magnesium is about 3% of this sum, and it will not become the core of the project. It rides on a stream whose treatment is already paid for.
What the operator no longer has: it does not haul water to disposal wells, does not pay for injection, keeps no ponds, does not wait for the next tightening over seismicity, is not liable for salinizing someone else’s land and carries no liquid tail on its balance sheet. And the secondary effect: each barrel of oil comes with 3–5 barrels of water, and that is $2.25–6.25 in the cost of the barrel. Remove that line — the barrel gets cheaper, the operator is more competitive at the same oil price, and the well works longer.
Why magnesium goes under contract
At 350 mg/L the Permian Basin alone gives 38% of world magnesium output. At 730 mg/L — 78%. Werra alone — 26%. The limit on magnesium is neither the water nor the formation.
1 mln t a year is not a ceiling on demand, but a snapshot of today’s cost structure: this is how much magnesium the world produces while it is made from a mountain with coal. Magnesium goes into aluminum alloys, automotive castings, steel desulfurization. But not a single ton sells by itself. It is taken by a specific plant under a specific contract.
That is why, in the ARBOK model, magnesium is a contracted co-product for a specific buyer, not a standalone project. The order is simple: first the buyer and the volume, then the line. Magnesium content changes from formation to formation, so yield and specification are calculated for the specific water. The contract is signed for all products of the stream at once: magnesium, bromine, iodine. The model is equipment purchase or BOOM with contracted sales.
United States
The only American primary magnesium plant stopped production in September 2022. Since then the US covers more than 75% of its magnesium metal consumption with imports: about 47% from Israel, about 31% from Turkey, about 8% from Russia. Meanwhile the Permian Basin pays $5.5–9.1 bln a year to inject produced water. Every site where a unit is installed stops paying its share of that sum, and the payment that stops becomes the operator’s income. Magnesium comes on top: in Permian water at 350 mg/L there is more than 400,000 t, about $1 bln in metal terms.
World
88% of primary magnesium rests on 1 country and 1 method. The only notable source from water is a lake that loses 1.0–1.2 m of level a year. Every ton of magnesium taken as a co-product on such a stream is a ton that does not have to be smelted out of a mountain and does not have to be evaporated out of the Dead Sea. And at the Dead Sea itself, the same unit returns water to the sea instead of giving it to the sky.
Today in China magnesium is smelted out of a mountain with coal, while in Texas water with the same magnesium is paid for to be pumped back into the ground. One solution: put the unit on a stream that is already paid for, and ship magnesium to whoever has already signed the contract.
Are we competing on the cost of stupid 19th–20th-century approaches, or do we need a lot of inexpensive magnesium all over the world? Or do you like the dependence and the monopoly? No? So what is the problem?