LONG BATTERY is an autonomous modular power plant capable of generating electricity powered solely by water. This is not a “fuel-free generator” — it is an autonomous electricity generation system that uses ordinary water as its fuel. The installation is modular and can have different capacities. One compact Long Battery cartridge, the size of a small suitcase, produces 1.5 kWh of electricity per hour, consuming only half a liter of water per hour. Mounted into a standard shipping container, 710 cartridges generate 1 MW of electricity per hour.
The technology is based on three principles: an innovative “cold” hydrolysis process that splits water into gases with multiple advantages over conventional hydrolysis (which is energy-intensive); then, original solutions in gas mechanics and electromagnetic induction. The result is simultaneous generation of electricity and heat. LONG BATTERY delivers stable grid power 24/7/365 at 50 Hz, with much lower capital and operating costs than comparable generating systems. It ensures zero emissions — no smoke, no high temperatures, no critical pressures or other hazardous processes typical of power generation; quiet operation; exceptional compactness; and universal application. It is an alternative energy source not only compared to hydrocarbon-based power plants but also to so-called “renewables” like wind turbines and solar farms. LONG BATTERY has an ultra-high power density — 5–7 times higher than any nuclear power plant and 30,000 times higher than solar and wind systems. LONG BATTERY is a direct competitor to nuclear power, surpassing it on every parameter.
As noted, LONG BATTERY uses only water as fuel. Freshwater can be used, but in case of scarcity, any other water source is possible — seawater, even sewage or wastewater. In such cases, LONG BATTERY can be equipped with desalination and purification systems — Arbok-Puri or Arbok-Desal. For cities, industrial sites, or rural areas, this is not a limitation but an added convenience.
Key facts for a 1 MW module: • Footprint: ~14.3 m² (≈2 parking spaces). Scales linearly up to hundreds of MW. • Annual generation: ~7.88 million kWh with CF ~90%. • CAPEX benchmark: ~€2.15M/MW (100 MW ≈ €190M). • OPEX: ~5–10% of CAPEX/year. • Power density: ~69.9 kW/m² and ~0.78 TWh/m²/year — 30,000× higher than wind/solar. • Turnkey delivery: 12–18 months. Installation similar to any 20” containerized unit — flat ground, crane, water supply (with or without purification), power cables, and footprint of 14 m² per MW. Can be located directly near the consumer. • Service life: 15–20+ years with replaceable components (simple mechanics, minimal moving parts). • Additional: high thermal output for hot water/district heating (cogeneration mode without loss of electricity output).
LONG BATTERY vs Nuclear (100 MW class)
*Nuclear figures based on financial-economic metrics; construction times are multi-year and highly project-dependent.
Why LONG BATTERY outperforms nuclear by the numbers:
CAPEX: 100 MW requires ≈€190M vs ≈€712M for nuclear — ~3.7× lower at comparable CF.
OPEX: LONG BATTERY ~€9.5–19M/year vs nuclear €20–40M/year, without fuel or waste management costs.
Payback: ~1.5–2 years vs 15–20 years — a fundamental shift in financial models and risk profiles.
Power density and land: 0.14 ha vs 1–2 ha; 69.9 kW/m² vs 50 kW/m² — compact enough to be sited directly at consumer locations.
Operation: 24/7/365 with 50 Hz grid stability, instant start/stop — ideal for both baseload and peak balancing.
Safety: zero emissions, no radiation risks, no fuel logistics.
Other industrial energy sources (100 MW, benchmarks):
LONG BATTERY: CAPEX ≈ €190M; CF ~90%; land ~0.14 ha; payback 3–5 years; service life 15–20 years + cogeneration heat.
Gas: CAPEX ≈ €95M; CF 80–90%; land ~0.5 ha; payback 5–10 years.
Coal: CAPEX ≈ €305M; CF 80–90%; land 1–2 ha; payback 10–15 years.
Wind: CAPEX ≈ €160M; CF 30–40%; land 50–100 ha; payback 6–8 years.
Solar: CAPEX ≈ €376M; CF 15–25%; land 200–250 ha; payback 4–5 years.
Hydro/PSH: CAPEX ≈ €350/200M; CF 30–60%; land 100–500/50–200 ha.
Where LONG BATTERY fits today Urban lighting, industrial enterprises, data centers, airports, transport hubs, industrial clusters, shopping malls, city networks — supplying either the general grid or directly to end consumers. Units can be installed right at the consumer site without the need for grid infrastructure. Power is scaled by the number of Long Battery blocks, installed in one facility under a common roof or in container complexes stacked multiple stories high to save space, without super-foundations.
Water supply is required at 0.5 m³/hour per 1 MW block. Cold start → full operation in ~1–1.5 hours. Staffing minimal: one crew of 2–3 people can service a generator (per EU norms) or 20–30 units simultaneously.
Conclusion By CAPEX/OPEX, deployment speed, power density, safety, and simplicity, LONG BATTERY defines a new category of electricity generation — outside the list of known systems — and takes first place among them all. It is not only far more efficient in terms of operating and capital costs, not only the lowest cost per kWh, but also closes the market “gap” left by renewables: grid frequency stability and independence from weather and nature.
The system works 24/7, unlike wind and solar. It does not depend on wind strength or sun hours, making wind and solar entirely noncompetitive. With scalable generation from 100–200 MW (typical for large industrial consumers) up to gigawatt-class installations rivaling nuclear plants — but without their drawbacks of huge sites, risks, and radioactive waste — LONG BATTERY delivers absolute energy independence, free of any fuel imports.
This is not a supplement to old-generation power systems — this is a replacement. With figures that add up decisively in favor of the new.
Arbok LONG BATTERY is a new generation of power generation systems that frees humanity from hydrocarbons, fickle winds, 7-hour sunshine, and radioactive decay that could at any moment give us another Chernobyl or Fukushima.