Energy has always been the primary constraint of any economy. For a long time it seemed that this problem had already been solved. Power plants were built, electrical grids expanded, oil was extracted and delivered almost anywhere in the world, industries consumed electricity, and the system functioned. But recently several new factors have appeared that did not exist before and are rapidly changing the situation. One factor is the shifting geopolitical landscape — pressure on major resource producers, conflicts around energy markets, and increasing instability in global supply chains. The second factor is entirely different: the explosive growth of data centers and artificial intelligence infrastructure.
Data centers are no longer server rooms. Today they are industrial facilities. A large data center typically consumes 100–200 MW of power. That is comparable to the electricity demand of a small city. And the number of these facilities is growing quickly.
Energy market studies show a very clear trend. In 2024, data centers consume roughly 460 TWh of electricity worldwide. By 2035, consumption is expected to reach approximately 1300 TWh. That is almost a threefold increase. To understand the scale, one comparison is enough: 1300 TWh is roughly equal to the annual electricity consumption of Japan. In other words, a new industry is emerging that in terms of electricity demand begins to rival some of the largest economies on Earth.
But there is a problem. Energy systems cannot scale quickly. Gas power plants require fuel and take years to build. Coal generation is being phased out in many countries. Solar and wind depend on weather and cannot provide stable baseload electricity. Electricity demand is rising rapidly, while a data center cannot simply stop operating because there is no wind or clouds block the sun.
This is why the discussion inevitably returns to nuclear power. Nuclear plants can indeed provide stable electricity for decades. A single reactor typically produces 1–1.6 GW and operates for 60–80 years. From a physics perspective, nuclear energy is one of the densest sources of power available.
However, nuclear power has fundamental limitations — dependence on nuclear fuel supply chains, extremely high costs, and most importantly time. Building a reactor typically takes 10–15 years, and sometimes much longer. Design, licensing, environmental approvals, safety requirements and infrastructure transform every project into a massive and slow construction process. Costs frequently exceed initial budgets, sometimes by 2–4 times. Even if a decision is made today, the electricity will arrive decades later.
Because of this, the industry began discussing Small Modular Reactors (SMR). The idea was that smaller reactors could accelerate nuclear deployment. But when the numbers are examined closely, the optimism quickly fades. For example, the Natrium reactor has a capacity of about 345 MW. Its cost is estimated at roughly $10,000–$11,000 per installed kW — already an order of magnitude above what modular water-based systems require.
If we scale that to a 200 MW data center requirement, capital costs alone are enormous before construction even starts. Operating costs come next. Typical nuclear OPEX is around $25–40 per MWh, or $0.025–0.04 per kWh. These costs include fuel, reactor maintenance, safety systems, licensing, personnel and nuclear waste management. Including capital expenses, the total electricity cost usually reaches $0.09–0.15 per kWh, and this does not yet include grid infrastructure or transmission lines.
Now consider the same problem from a different angle. Instead of building one enormous power plant, generation can be modular. Instead of relying on weather or fuel deliveries, power can be produced locally. Instead of depending on a central grid vulnerable to outages, generation can be located directly at the consumer. This is the concept behind ALB — Arbok LongBattery.
The core of the system is a 20-foot container that contains approximately 800 vertical cartridges. Inside each cartridge a vacuum hydrolysis process takes place. The resulting hydrogen and oxygen gases perform mechanical work inside the cartridge, driving a magnetic system. As the magnet moves through an induction coil, it creates a changing magnetic field that induces an electric current. Part of the generated energy sustains the process, while the remaining electricity is delivered to the external grid. The cartridge design and operating parameters are proprietary know-how implemented in pilot installations.
During operation the system consumes approximately 500 liters of water per hour. From this volume about 55 kg of hydrogen and roughly 444 kg of oxygen are produced every hour. The hydrogen contains around 1.8 MW of chemical energy. When directed into a fuel cell operating at 50–60 % efficiency, it can produce roughly 1 MW of additional electrical power. This means that while the base generator produces about 1 MW, the hydrogen fuel cell increases the total electrical output to approximately 2 MW per container.
A single container occupies about the space of two parking spots. With a capacity factor of 90 %, annual production at 2 MW reaches approximately 15.5–15.8 mln kWh.
This corresponds to about 1.1 mln kWh per m² per year.
For comparison:
☀️ Solar power: ~200–300 kWh per m² per year
⚛️ Nuclear power (including facility footprint): ~50 000–100 000 kWh per m² per year
This means that ALB energy density can exceed solar power by roughly 4000–5000 times and nuclear power by roughly 10–20 times.
But energy density is not the main advantage. The real difference is architecture. Electricity production is no longer one giant facility. It becomes a modular system.
10 MW → 5 containers
100 MW → 50 containers
200 MW → 100 containers
Operational costs are also fundamentally different. ALB does not require fuel. Water serves as the working medium. To avoid reliance on freshwater, the system can use seawater or treated municipal wastewater processed by containerized Arbok desalination systems.
A 2 MW installation requires roughly 1 m³ of water per hour. At a water price of about $1 per ton, the contribution of water to electricity cost is negligible.
Estimated OPEX is around $5–10 per MWh, or $0.005–0.01 per kWh. Including capital costs, total electricity cost is estimated at approximately $0.03–0.05 per kWh, roughly 3–4 times lower than small nuclear reactors.
But the economics do not stop there.
The system produces not only electricity but also oxygen and heat.
💨 Oxygen production: ~444 kg per hour
💰 At $0.5 per kg, potential revenue reaches about $1.7 mln per year
🔥 Thermal output: ~259 kW
This heat can be used for building heating or industrial processes.
When electricity, oxygen and heat sales are combined, the total annual revenue of one unit can exceed $3 mln.
The expected operational lifetime of the system is around 25 years, which leaves a long period of profitable operation after the initial investment is recovered. The container architecture also allows upgrades and modernization without building entirely new power plants.
Another major advantage is location. ALB systems can be installed directly next to the consumer. If a data center requires 200 MW, approximately 100 containers are needed. In a single level they occupy about 1400 m². However, container systems can be stacked three levels high, similar to parking structures. This reduces the required footprint to roughly 450–500 m².
A data center can therefore have its own power plant occupying little more than the area of a parking lot.
This changes the entire logic of energy supply.
⚡ No long transmission lines
⚡ No transmission losses
⚡ No dependence on remote substations
⚡ Continuous 24/7 generation directly at the consumer
Traditional energy systems rely on one massive facility, which becomes a critical vulnerability. Modular generation works differently. Even if several modules fail, the rest of the system continues operating.
ALB also eliminates the entire nuclear fuel chain.
⚛️ No uranium mining
⚛️ No fuel enrichment
⚛️ No radioactive waste management
💧 The working medium is simply water.
In the end the logic is simple. Data centers require ever-growing amounts of electricity. Traditional power plants take decades to build. Modular generation can be deployed much faster.
Of course, the figures presented here are based on prototype performance and engineering calculations, not full-scale industrial installations. Real-world parameters may differ. However, under mass production conditions — with water not costing an abstract $1 per ton but closer to $0.1, achievable through Arbok-DESAL desalination technology, combined with equipment standardization and system synergy across Arbok installations — the actual performance, according to internal projections, is likely to improve rather than decline. But even using the conservative assumptions above, with power capacity paying back in roughly 1 year, such adjustments are not critical for the overall economics of the system.
The real question today is simple.
If electricity demand continues to grow at this pace, the energy system must change — because computing power can scale rapidly, while traditional power plants cannot.
Also published on: LinkedIn — Michael Vischmidt · Facebook — ARBOK Institute