Post

Energy storage today has turned into a toothache and a separate trend in power engineering

⚡ Energy storage today has turned into a toothache and a separate trend in power engineering. It is an industry with its own rules, requirements, money, supply chains, politics and ideology. The reasons are simple: electric…

⚡ Energy storage today has turned into a toothache and a separate trend in power engineering.

It is an industry with its own rules, requirements, money, supply chains, politics and ideology. The reasons are simple: electric vehicles have eaten the battery market and pulled raw materials upward in price; the grid has become dependent on lithium, the Chinese, monarchies, wind and sun; night and day have started to cost differently. At night there is often more energy than needed, in the morning and evening there is not enough, and the entire generation system works at the limit. Previously this was covered by a large number of power plants on different types of fuel. Now many coal, fuel-oil and even gas units have been shut down or “constrained” by regulation, and the raw materials crisis has made fuel and equipment more expensive. New capacity is slow to build, expensive and conflict-heavy in permitting, while old stations cannot maneuver endlessly. Gas demand is unstable with an endless tendency to grow, “at the slightest trigger.” On top of this came the load of data centers and AI: demand grows faster, it is already larger in the U.S. than residential consumption and faster than infrastructure modernization, and every peak becomes a daily stress test for dispatchers instead of stable operation.

🔋 Today’s leader as storage — lithium-ion — has turned the task into hell.

It is not a “bad battery.” For phones and cars it still works. But at grid scale lithium-ion is a monster in terms of raw materials and risks. Where lithium appears, mines and salt flats appear, conflict over water, protests, and yet drilling and digging continue because the world is addicted to batteries. Lithium now competes with oil and gold. Then come nickel, cobalt, graphite, organic electrolytes, recycling plants, fires, insurance premiums. In the end you buy not so much electricity as a complex and fragile system that must be perfect every day. But the most unpleasant part is this: once you need not 4–8 hours but 40–100 hours, you simply multiply this construction by the number of hours. Want more duration — install more containers. This is not development of a solution, it is scaling of problems.

⚙️ The very ideology of batteries — “store at night, release in the evening” — is a technological dead end.

A modern and new energy system must be described by different principles — flexible generation that produces energy exactly when it is needed and exactly in the volume required. And it must be fully independent from imported fuel supplies. It must be safe and cheap. And it is ARBOK that developed LongBattery that 100% meets these criteria: generation on demand, without eternal idle operation, with fast start and stop. Cold start — about 20 minutes. Fuel — water. Power can be raised at peak and reduced to 0 when there is no demand. If the world’s infrastructure were built from scratch, storage would be secondary: the grid would receive controllable generation, not a permanent compromise. It does not use high pressure, high temperatures, radioactive materials, and there is no need to build plants — all equipment is containerized. But this article is not about LongBattery…

The world is not built from scratch. The grid already exists. Markets and dispatch regimes are already structured. Most generation is more profitable in continuous operation than cycling up and down. Therefore energy storage remains a real necessity: morning and evening peaks, night surplus, accidents, plus periods without wind and sun that may last not hours but days. Storage must be scalable, cheap in materials and calm in physics.

In industrial reality there are 2 different storage tasks.
1 — short: cover peaks for 2–8 hours, support frequency, absorb instant drops.
2 — long: survive a day or more when “luck fails” and generation does not arrive.

Lithium-ion is stronger in the first. In the second it becomes an expensive way to buy many hours, because you pay for energy packaging and pay again and again per hour. That is why a separate class of “day+” solutions appeared. And here a new type of long-duration storage appears — “IRON AIR.”

In IRON AIR no rare metals are used in the base. No organic electrolytes. No attempt to build a “smartphone battery,” only at grid scale. Its task is to give the grid or a large consumer many hours of energy through cheap materials and calm chemistry, not through scarce raw materials and expensive lithium packaging.

The IRON AIR working principle is simple.
Anode — iron and cathode — air. On discharge iron gives electrons, oxygen from air accepts them. On charge the process reverses and iron becomes “charged” again. The entire complexity lies in making iron work fast and stable: not forming a dead passivation film and not losing charge into hydrogen. Here lies the know-how: electrode engineering, conductivity architecture and parasitic reaction control so the system works in real energy and is ready for industrial scale.

Why iron makes sense.
Because it is cheap, mass and available in any country with metallurgy. This removes the main pain of the battery market: dependence on imports and fragile supply chains where any disruption turns into price spikes and panic.

📊 The numbers speak for themselves.

The theoretical capacity of iron in this chemistry is about 0.96 Ah/g. At working voltage around 1.2 V this gives about 1.15 kWh per 1 kg of active iron at ideal limit. In a real system it will be lower, but the order of magnitude matters: energy is stored in ordinary metal measured in tons, not in scarce components.

Take the most demanded grid case:
100 MW of power for 100 hours. That is 10,000 MWh, meaning 10 GWh, or 10,000,000 kWh. By theoretical limit this corresponds to approximately 8,700 t of active iron. Yes, this is mass. But it is industrial mass of cheap material, not rare raw materials. For “day+” mode this is normal: energy in days is physically always “heavy,” the only question is price and risk of that mass.

🔎 Compact Comparison

Here it is important not to confuse concepts.
There is price $/kWh — price of “hour volume.” And there is price $/kW at duration H — price to “hold power” for H hours. The relation is direct: $/kW at H hours = H × $/kWh. Therefore 1 hour is the base point, and 100 hours demonstrate where real “day+” cost begins.

For comparison take indicative cost benchmarks by energy: lithium-ion $192/kWh, flow $400/kWh, IRON AIR $50/kWh as a conservative benchmark for scale (in reality, even lower).

Take the most demanded grid case: 100 MW of power for 100 hours, meaning 10 GWh, or 10,000,000 kWh — the volume of “hours” that must be bought at each technology’s unit price.

At 100 hours, energy volume alone costs $19,200 per 1 kW of power for lithium-ion and $5,000 per 1 kW for IRON AIR — a wide gap per kW, and it scales directly with duration. This is the price of the chosen storage architecture in the “day+” zone.

But entry check is only half the meaning. Real benefit is measured not by “installed capacity,” but by how much useful work the system delivers over lifetime. IRON AIR in operation gives 10–20 times more useful work over lifetime than comparable installed-capacity options, and the economic effect is following:

price of useful work drops 10–20 times. It is felt in one line:

$50/kWh installed cost, divided by 10–20, effectively becomes $5–$2.5/kWh of useful work once recalculated over the system’s lifetime resource. Here lies the main gap: lithium sells expensive “hours,” IRON AIR sells cheap “work,” based on mass raw materials, without rare metals in the base, and with low system complexity.

Separately about safety, maintainability and simplicity, because in power engineering this is no less important than technology itself, since it affects permitting, insurance and operational rules. Lithium-ion at large scale always pulls complex management systems, thermal control, fire scenarios, siting and evacuation requirements, and insurance tail. IRON AIR — aqueous electrolyte and simple industrial chemistry. Essentially, excluding know-how, long-known materials, therefore different risk profile: not “thermal runaway with fire,” but normal industrial chemical discipline. For grid operators and industry this translates into clear things: simpler approvals, simpler sites, simpler maintenance, less insurance stress.

Conclusion.

For short distance lithium-ion is needed and will remain needed: its strengths are appropriate there. For 24–200+ hours lithium-ion fully loses competition, because you multiply scarce raw materials, complexity and fire profile by number of hours. IRON AIR in the “day+” zone gives a different logic today: mass standard materials, low system complexity, calm chemistry, supply accessibility, and most importantly — financial efficiency through 10–20 lifetime work factor, where what matters is not “capacity on a nameplate,” but cost of useful work over entire service life.


Also published on: LinkedIn — Michael Vischmidt · Facebook — ARBOK Institute