❌ It no longer has to be dug out of the Congo.
Cobalt is the cathode of lithium-ion batteries, the metal of turbine superalloys and catalysts. It has almost no ore of its own: it is a **by-product of copper and nickel mines**.
- One part of the cobalt is never captured and leaves as the **Co²⁺ ion** into acid mine drainage, leach solutions and tailings.
- The second stream is spent-battery effluent: cobalt already taken out of the ground, lost again in water. In **2025 the DRC imposed export quotas**, and the market flipped from surplus into structural deficit. No one plans to mine cobalt on its own: it comes “as a bonus” to copper and nickel, and its volume is set by copper mine plans, not battery demand.
❌ Baseline figures:
- Cobalt: **~$60/kg** (April 2026), trending upward.
- DR Congo: **~73% of world mine output**. China: **~70–78% of refining**.
- DRC quota for 2026: **96,600 t** — less than half of 2024 world output (**~220,000 t**).
- Uses: battery cathodes, superalloys, catalysts. **No substitute** in high-energy cathodes.
- One EV pack holds **~5–10 kg** of cobalt.
🟢 ARBOK’s technology solved the problem: Arbok vacuum separation of mine waters:
- **deep vacuum (~1 kPa)**, ambient temperature, **~0.7 kWh/m³**
- **100% water return by volume**, zero discharge
- copper and nickel recovered alongside, from the same stream
- concentration of Co²⁺ → via a **secondary pass**
- arsenic and uranium go into an immobilized fraction, acid drainage is neutralized
- **no furnaces, membranes, chemicals or consumables.**
For spent batteries there is a separate track — **Arbok-AVD** (amalgamation + vacuum distillation, **85–92% for Co/Ni/Cu**). It works where the water already exists and must be treated anyway: no new pit, no separate ore processing.
🟢 Economics.
One module (**200 m³/day ≈ 70,000 m³/year**) at **0.2 g/L Co** (conservative for Katanga mine waters: the range runs from 0.003 g/L in discharge to tens of g/L in mine water; DRC copper-cobalt raffinate is 1–3 g/L):
- **~14 t cobalt/year → ~$0.84M/year**
- + copper and nickel as co-products: **~$0.45M/year** (at 0.5 g/L Cu and $13,300/t)
- + **70,000 m³** of clean water back into circulation, **~$0.07M/year**
- + acid-drainage neutralization removed (minus fines and reagents)
- **~$0.10M/year**
TOTAL per unit: **~$1.45M/year**
Scale check: **14 t/year ≈ cathode cobalt for ~2,000 EV packs**, from one module, from water already being treated.
🟢 At scale:
- The DRC–Zambia belt moves **hundreds of millions of m³ of water per year**; spent-battery effluent adds to it — a **$10–15B** recycling market by 2030.
- Every ton outside the DRC quota and outside Chinese refining is independence of cathode feedstock.
🟢 Where it changes everything:
- DRC, Zambia — the copper-cobalt belt
- EU, USA — battery recycling as second ore
- Aerospace and defense — turbine superalloys
🟢 Bottom line: cobalt does not have to be mined again. It already flows in acid drainage and battery effluent that must be cleaned anyway. ARBOK turns treatment into recovery.
@Arbok #Arbok #Cobalt #Batteries #CriticalMinerals #ZWD