Bunkering Without a Queue: Pull the Fuel, Do Not Haul It

A container ship sits at anchor and waits for a bunker barge. An idle day costs $30,000–100,000. The fuel lies 2 km away, in a shore tank. The world fleet burns about 250 million t of…

A container ship sits at anchor and waits for a bunker barge. An idle day costs $30,000–100,000. The fuel lies 2 km away, in a shore tank.

The world fleet burns about 250 million t of fuel a year, and almost every tonne is carried to the ship. One bunkering moves 500–3,000 t and keeps the ship alongside for 3–8 hours. For the ship that time is worth $4,000–30,000. The fuel stands still. The money moves.

The trip is the culprit

A bunker barge is a taxi for a liquid. It has a crew, a schedule, a mooring operation, weather limits and a queue at the loading berth. Every trip contains 2 transfers, from shore to barge and from barge to ship, and each one brings vapour losses, a quantity dispute and a spill risk. Barge delivery adds $2–6 per tonne to the fuel price even in the largest hub.

The second culprit sits inside the hose. Fuel is pushed into the ship at up to 10 bar. Under pressure the hose is stiff and short, the connections are heavy, and the line cannot be stretched beyond a few tens of metres. A short line needs a vessel, and a vessel needs a trip.

More barges do not answer the queue

The industry answers a queue in the usual way: add barges. More barges mean more vessels at the same loading berths, so the queue moves from the anchorage to the terminal. Crews, insurance and the fuel burned by the trips grow with them.

Shipping small parcels between neighbouring terminals with the same bunker barges is a sound idea, since the barge is already in the port. But it is still a trip. The cargo travels when it could flow.

There is also the question of what arrives. The barge delivers what was loaded into it. The laboratory result comes when the fuel is already burning. Air entrained during pumping inflates the meter reading, and a shortfall is found at sea, after the barge has left for the next ship.

ARBOK-PORTLINE: pull, do not push

ARBOK-PORTLINE does not push the fuel. It pulls it with vacuum. The line carries no high pressure, so the pipe does not have to resist it.

The pipe is ordinary: polyethylene, a flexible hose or standard metal pipe. Heavy-wall steel and pumping stations are not needed, so the line costs 3–5 times less than a conventional pipeline. The energy demand is 100–150 W per tonne. At $0.20 per kWh that is 2–3 cents per tonne, about 100 times less than barge delivery.

The line lies on the harbour bottom and follows its relief. It handles a level difference of 12–15 m per stage by itself. Where the harbour is deeper, a suction unit the size of a barrel is added, and it can stand anywhere: on the quay, on the barge or under water. There are no moving parts and no consumables, so there is nothing to service on the bottom, and the polymer does not rot.

What the port gets

The main gain is throughput: the same berths and the same anchorage serve ships without queues, and the port can charge for this capacity.

A pipe between terminals. A small parcel moves from one terminal to its neighbour as a flow, without a vessel and without a berth slot. A flow has no minimum size.

A hose on a port barge. The barge stops being a tanker and becomes a floating dispenser. It stays alongside the ship while the fuel comes to it from shore. Its own tank works as a buffer: the line fills it continuously, and the barge discharges quickly into the ship. The barge never returns to load, so the queue has nothing to form from. More than one pipe can be laid when the flow must be larger.

A return line. Bilge water and sludge go from the ship to shore, to the ARBOK-MarineSludge port module, during the same call. The ship receives fuel and discharges waste in one stay.

A fresh-water line. One more line supplies the ship with fresh water from ARBOK.

What if the hose is damaged

A pressurised hose that breaks throws fuel into the sea at 10 bar. The ARBOK-PORTLINE line holds vacuum, not pressure, so when it is damaged the fuel does not jet into the water. Pressure sensors run along the whole length. A deviation gives a signal to the operator and a shutdown within seconds. The hose is wrapped in a metal braid against anchor chains and cables.

Weather, fog and night stop a barge. A line on the bottom does not notice them.

Cleaning the fuel on the way

Fuel passes through one point on the shore, and that is where it can be cleaned. As an option, a unit at the inlet of the line removes sulphur, water and paraffins without hydrogen and without catalysts.

For the shipowner the result is fuel that meets the sulphur limit without a scrubber. The global limit is 0.5% and the limit in emission control areas is 0.1%. Since May 2025 the whole Mediterranean has been such an area. For the port the result is a high margin: up to 96% of the mass becomes products with a commercial price, so the price of port services can be lowered.

One 20-foot module treats 200 t per day. The cost is $20–30 per tonne against $100–150 for hydrotreating, and the energy demand is 1–3 kWh per tonne against 15–25. The price gap between high-sulphur and low-sulphur fuel is about $100 per tonne, so on one bunkering of 1,000 t the cleaning leaves the port about $80,000.

Quality you can see

ARBOK-SONAR stands at the inlet and the outlet of the line and measures the flow more than once per second. It archives the data and sends it to the operator. The shipowner receives an instrument record instead of a supplier certificate, and the dispute about the bunker ends before it starts. Vapours at the shore tanks are captured by ARBOK VOC RECOVERY, which returns 85–98% of them as liquid fuel.

What it costs the port

The quay is not rebuilt, dredging is not required and no pumping station is needed. The hose, the suction units, the sensors and the cleaning container are placed on the infrastructure that already exists. The barge crew stays, but stops going in circles and serves ships one after another.

The port used to earn on the transfer. Now it has 3 sources of income: the flow between terminals, bunkering without waiting and fuel cleaning. Bunkering stops being an event around which a berth stay is planned. It becomes a service of the quay, like water and shore power: connect and receive.

The scheme is not tied to a large hub. A fishing port, a marina, a river terminal or an anchorage near an island gain the most, because their own bunker barge is the most expensive per tonne.

A port that hauls fuel sells trips. A port that pulls fuel sells fuel. ARBOK offers a complete solution.