Post

ARBOK-GEYSER vs. Mine Water and the Heat Pump

Britain is in an energy crisis and wants heat from anywhere it can. One idea: take water from flooded mines and reheat it with a heat pump. Gateshead: 350 homes, offices, a college, an arts centre,…

Britain is in an energy crisis and wants heat from anywhere it can. One idea: take water from flooded mines and reheat it with a heat pump. Gateshead: 350 homes, offices, a college, an arts centre, 1,800 t of CO₂ a year. Seaham: 750 homes, 2,600 t of CO₂ a year. The system is inefficient and expensive, but the water is already warmed to at least +18–20 °C. The salts are left alone — the water passes the heat exchanger and goes back into the mine, cooled to 8 °C.

Why are such wells not used? Salts: an average well (25 l/s, 3 g/l) passes 1,200 t a season. The pipes clog. Reverse osmosis needs the water cooled to 25 °C — throwing away the very heat the well was drilled for — and fails above 7% salt.

ARBOK-GEYSER delivers heat for up to 600 homes at 60–80 °C from the same well, without a heat pump, and earns ~$1 mln a year on replaced gas and salts. The salts become products; the water comes out fresh and clean.

Efficiency.

Reheating — water at 18–20 °C plus a heat pump gives 3–4 kWh of heat per 1 kWh of electricity.

Arbok. The module does not heat the water — the heat comes from the well — it only cleans it, spending 1 kWh/m³ net: about 60 kWh of heat per 1 kWh of electricity. 15–20 times higher. Salts add $50,000–200,000 a season.

PROCESSES.

REHEATING: A mine, two wells — intake and return, heat pumps, a lot of electricity.

ARBOK: A unit at the wellhead. Deep vacuum: the water evaporates at the temperature of the incoming stream — no heating, boiling or cooling. The vapour condenses into clean water, while the salts, silica and boron remain as a dry, separated cake — a commodity. No membranes, no filters, no reagents. Run by a crew of 2.

One well is 4 MW of heat and about $1 mln a year.

→ Britain: today 4 MW of deep geothermal. Cornwall plans about 100 MW — about $25 mln a year.

→ USA: 0.5 GW — about $120 mln a year.

→ World: about 48 GW — about $12 bln a year.

Comparison: mine water with a heat pump | ARBOK-GEYSER

→ Heat: water at 18–20 °C | hot water from the well

→ Heat pump: required | not required

→ Water at the outlet: 8 °C, back into the mine | clean, at the inlet temperature

→ Salts: stay in the water | commercial fractions

→ Homes: 350 | up to 600 from one well

Benefit.

REHEATING: Gateshead as a whole is the heat of one well. Heating takes electricity for heat pumps: about 5 GWh a season — about $1 mln. Gas would cost the same.

ARBOK: One well per season: $1 mln saved on gas — that means earned — salts $50,000–200,000, minus the module’s electricity, about $60,000. TOTAL: about $1 mln a season. Through reheating the benefit is about zero; through power generation — about $0.2 mln a year. ARBOK is 4–5 times better.

Salt was a curse while people tried to remove it from the water. It isn’t removed — it is collected. ARBOK-GEYSER is not a new well. It is clean water for the wells already drilled.

#Arbok #Geothermal #DistrictHeating