Abstract

Data center heat rejection is currently solved either by evaporating municipal or river water in open cooling towers, or by moving very large masses of air across finned surfaces in dry coolers. The first route sells water; the second sells structure, plot area and parasitic electricity, and that electricity is itself evaporated as water at the generating station. This paper describes ARBOK-DryTower, a closed two-phase heat rejection line in which a working fluid is evaporated and condensed under deep vacuum inside sealed horizontal vessels. Heat transfer proceeds by boiling and condensation rather than by single-phase convection, which removes the need to move air in bulk and removes the water consumption entirely. On the reference node used throughout ARBOK’s cooling work — a 10,000 m³/h loop, 8,000 operating hours per year, 186 MW of heat rejection at a delta of 16 °C — the design occupies 89 m² against 4,500–6,000 m² for tower schemes of the same duty, carries an auxiliary load of 0.107% of rejected heat against 0.7–2.6% for competing schools, and consumes zero water in operation. The paper sets out the physical basis, the key parameters, the application envelope including direct-to-chip liquid cooling at 45–60 °C, the operating economics, and the build-own-operate-maintain delivery model under which the cold line is sold as a service rather than as equipment.

Keywords: data center cooling, water footprint, deep vacuum, two-phase heat transfer, closed loop, heat rejection, direct-to-chip liquid cooling, Legionella, PUE, WUE

1. Introduction

A data center does not drink its water where it stands. In a small town in Oregon, an American technology corporation drew 12% of the municipal water supply in 2012; by 2025 the figure was around 40%, roughly 550 million gallons a year. Those numbers surfaced only after litigation forced the release of municipal records. That single case is representative rather than exceptional, and it explains why a growing number of jurisdictions now decline to host new capacity: the facilities are wealthy, and in any contest for a permitted abstraction they outbid the residents.

The metered abstraction is the smaller half of the problem. Up to 80% of the water attributable to a data center is lost at the power stations that generate its electricity, in the cooling towers of thermal and nuclear units, often hundreds of kilometres from the campus. That share never appears in the operator’s environmental reporting. United States data centers consumed 4.4% of national electricity in 2023 and are projected to reach 6.7–12% by 2028. Practically all of that energy becomes heat, and the heat has to leave the building. The only open question is who pays for its departure, and in what currency.

The vocabulary in use obscures this. “Water-neutral” describes consumption that has been financially restored in another basin or in another season — an accounting operation, not the absence of load on the local source. “Closed-loop” states only that the coolant circulates; it says nothing about how the heat crosses the boundary into the environment. The mechanism of that crossing determines everything else: the water bill, the plot area, the parasitic power, the sanitary liability and the geography of the site.

2. State of the Art

ARBOK evaluates every cooling proposition against one reference node: a circulation of 10,000 m³/h running 8,000 hours a year, rejecting 186 MW at a delta of 16 °C. The node is deliberately ordinary, and both incumbent schemes can be priced on it exactly.

The wet cooling tower evaporates 3.8% of the circulation on that node — 380 m³/h. Raise the delta to 35–37 °C and evaporation rises to 8.7%, or 870 m³/h. At $1.50/m³ that is $4.56 million and $10.44 million a year respectively, for water alone. To that is added blowdown, which concentrates salts and must be treated or legally disposed of; chemistry and biocide programmes; laboratory control; basin cleaning; and the continuing fight with scale and corrosion. And it is added an open basin held at 32–42 °C, with aerosol rising up to 300 m and droplet drift carrying 6–12 km. Legionnaires’ disease carries 15–20% mortality in the general population and 28% in hospital settings, which is why an evaporative basin inside city limits is a legal exposure with a permanent testing and sampling obligation attached to it.

The dry scheme removes the evaporation and immediately meets the physics of air. The best result the industry achieves is an approach of 11–20 K above dry-bulb temperature, which means a cold line of 51.4 °C when the air is at +40 °C. The price of that approach is structure: a concrete tower 120–220 m tall, hundreds of finned columns, and 4,500–6,000 m² of plot for the same 186 MW. The auxiliary load runs at 0.7–0.8% of rejected heat on the best complete systems and 2.6% on modular dry coolers. Those percentages are electricity, and that electricity is water — evaporated at somebody else’s power station, in somebody else’s river basin, and absent from the site’s own reporting.

Both schemes are mature, and neither is improvable in the direction that matters. The wet tower’s water consumption is not an inefficiency to be engineered away; it is the mechanism. The dry cooler’s plot and fan power are not overheads; they are what it costs to reject heat into air with a single-phase working fluid.

3. Concept

ARBOK-DryTower rejects heat by evaporating a working fluid under deep vacuum inside sealed horizontal vessels. It does not blow air across finned surfaces, and it does not open a water surface to the atmosphere. The name describes the result — dry operation — rather than the mechanism, which is two-phase.

The consequence is structural rather than incremental. Because the heat is carried by a phase change, the equipment does not have to move enormous masses of air, and because nothing is open to the atmosphere, the water balance is zero: no evaporative loss, no blowdown, no droplet drift. The working fluid is charged once and cycles between evaporation and condensation inside the machine. It is not a consumable; makeup covers leakage only.

The unit of delivery is a container. A module is manufactured, charged and tested in the factory, delivered assembled, and set on prepared ground. Capacity is added by module count rather than by extending a structure. This is what converts a cooling project from a construction programme — foundations, basin, pumping station, high-rise erection, approvals — into a logistics operation.

4. Operating Principle and Chemistry

The physics ARBOK starts from is the gap between specific heat capacity and latent heat of vaporisation. Water carries 4.18 kJ per kilogram-kelvin as sensible heat and 2,440–2,450 kJ per kilogram as latent heat. One tonne of evaporated working fluid therefore removes about 680 kWh. That quantity of heat is enough to cool 584 t of water by 1 °C, 58 t by 10 °C, or 5.8 t by 100 °C. The ratio between the two mechanisms is roughly three orders of magnitude, and every architectural advantage of the design follows from exploiting it.

The second element is the heat transfer coefficient. Boiling and condensation operate one to two orders of magnitude above single-phase liquid convection, and incomparably above the air side of a finned exchanger. Surface area that a dry cooler must buy in square metres of fin, a two-phase vessel obtains from the phase change itself. This is why the reference duty collapses from thousands of square metres of plot to tens.

The third element is the vacuum. Reducing the absolute pressure lowers the saturation temperature of the working fluid, which allows evaporation to proceed at the temperature level the site actually presents rather than at the fluid’s atmospheric boiling point. The process is driven by pressure, not by an external heat input; no heat is supplied to the machine from outside, and the temperature at which it operates is set by the incoming stream and the ambient.

The working fluid is water or alcohol of ARBOK’s own manufacture, selected for the site’s temperature level by vapour density. The choice is an engineering parameter of the configuration rather than a customer decision, and it is what allows a single architecture to serve cold lines from 30 °C to 60 °C without redesign.

Treatment of the circulating medium happens in the same pass as cooling. The circulating water is freed of salts, oils, radionuclides and dust without membranes, without catalysts and without consumable chemistry. Impurities leave as a dry solid residue, the material balance is closed, and there are no liquid tailings. A closed loop of the conventional kind degrades — salts concentrate, scale grows, corrosion begins — and the ARBOK line removes that failure mode at the level of the process rather than managing it with dosing.

5. Key Parameters

Module capacity follows from the phase-change heat transfer and from the cold line requested. A containerised module transfers 30 MW at a cold line of 30 °C, 62 MW at 45 °C and 109 MW at 60 °C. The reference 186 MW is therefore covered by six modules on 89 m² of plot, against 4,500–6,000 m² for a tower scheme of the same duty — a factor of 50–67 in land.

The auxiliary load is 0.107% of rejected heat, equivalent to 0.72 kWh per tonne of evaporated working fluid. This is a net figure for the complete installation, and it stands directly against the complete-system figures of the competing schools: 0.7–0.8% for the best dry systems and 2.6% for modular dry coolers. The ratio is a factor of 7 to 24. This is also where the indirect water footprint closes: electricity not spent on cooling generates no evaporation at the generating station. The indirect footprint is reduced by subtraction rather than by declaration.

Water consumption in operation is zero. There is no evaporative loss, no blowdown stream, no droplet drift and no makeup beyond leakage compensation.

Process temperature is not an imposed setpoint. No heat is supplied from outside; the machine operates at the temperature of the incoming stream and of the surrounding environment, and the cold line is produced by the vacuum condition rather than by a thermal input. Where a heat exchanger appears in an ARBOK flow diagram it performs cogeneration — the recovery and reuse of the process’s own heat.

Thermal response is fast. Conventional schemes hold several thousand cubic metres of circulating water and present that inertia as a virtue. For an AI cluster it is a defect: thousands of accelerators enter and leave the count in seconds and the heat output steps with them. A two-phase loop answers a step immediately, because what responds is vapour pressure rather than a mass of water.

The medium is monitored continuously with reporting to the control room. On deviation the system alerts the operator or moves the installation into a protective mode up to shutdown. Medium quality ceases to depend on the human factor.

6. Application Scenarios

New-build hyperscale and AI campuses are the primary case. Here the design competes on plot, on schedule and on the absence of a water permit. The site is not tied to river flow, river temperature or a permitted return temperature, and the negotiation with the municipality over abstraction does not take place, because there is nothing to abstract.

Direct-to-chip liquid cooling is the strongest case technically. A facility on direct-to-chip runs a cold line of 45–60 °C. At that line a containerised module transfers two to three and a half times more heat than at 30 °C, the plot shrinks further, and water consumption remains zero at any outdoor temperature. Warm water here is not a compromise imposed by the cooling system; it is the most profitable regime available.

Retrofit of an operating site runs in two stages. First, the incoming stream is held at a set cold line without touching the condenser, the circulating pumps or the discharge structure: the site simply receives water colder than the source provides. This step is installed within a single construction season and is reversible. Second, the loop itself is converted to closed operation — water is charged once and abstraction from the source disappears entirely. The first step buys performance immediately; the second closes the water question permanently.

Urban and near-urban facilities gain the sanitary case. There is no open basin, no droplet drift, no salt aerosol and no visible plume. The Legionella habitat is removed architecturally rather than suppressed chemically, and an entire class of liability retires with its testing programme and sampling schedule.

Hot and arid climates invert the usual penalty. In the wet scheme a larger temperature difference means more evaporation and a larger water bill. In the closed cycle a larger difference means more energy carried as vapour and higher absolute internal recovery. A hot day improves the unit’s relative efficiency instead of degrading it, and a heatwave ceases to be an event for the site.

7. Economics

The comparison is made on the reference node, over a full operating year.

Wet cooling tower: electricity for pumps and fans, $576,000–672,000; water, $4.56 million at a delta of 16 °C and $10.44 million at 35–37 °C; chemistry, biocides, laboratory, cleaning and repair, $160,000–480,000. Annual total: $5.296–5.712 million at the low delta and $11.176–11.592 million at the high one.

Closed vacuum cycle: the water line is zero; electricity, $230,000–384,000; planned service, $200,000–300,000. Annual total: $430,000–684,000 — and the figure does not inflate with delta, because there is no evaporative term to inflate.

The operating difference is $4.6–10.9 million a year on a single node. Purchased outright, the installation returns its investment in 5–7 years, the standard horizon for industrial cooling assets.

The stability of the second column matters independently of its size. The wet-tower total is a function of water price, permitted abstraction, delta and air temperature, all set outside the operator’s control and all moving unfavourably. The closed-cycle total is a function of electricity price and a service contract.

8. Deployment Paths

ARBOK delivers one thing: the cold line the site specifies, at zero water consumption. New build or an already charged loop, 50 MW or 2,000 MW, a few dozen square metres or a campus phased over years — the configuration is ARBOK’s engineering problem, not the customer’s. The operator states the required temperature, the thermal duty and the site constraints, and ARBOK guarantees the temperature. That is the commercial difference from the rest of the segment, where the vendor sells a fixed physical limit and leaves the consequences to the buyer.

The preferred entry point is BOOM: ARBOK builds, owns, operates and maintains the installation. The data center operator commits no capital, places no equipment on the balance sheet, hires no staff for a new system and carries no technical risk. Payment is for the result — per megawatt of heat rejected, against a guaranteed cold line.

This changes the character of the expense. Cooling stops being a capital project with a multi-year approval cycle and becomes an operating line: predictable, contracted, and independent of air temperature, water prices and municipal decisions on abstraction. The water line is zero from the first day of operation, which means the environmental reporting position is established at commissioning rather than accumulated over a compliance programme.

Modularity governs the schedule. A classical node is a building: tower, foundations, basin, pumping station, high-rise erection, approvals. A containerised module is a delivery. The site receives its cooling at the pace of logistics.

9. Market Context

Three pressures are converging on the same point. Electricity demand from data centers is rising at a rate that makes the sector visible in national energy statistics rather than buried in commercial load. Water stress is turning abstraction permits into a political instrument, and several jurisdictions have already used it. And reporting obligations are tightening: under the recast EU Energy Efficiency Directive, data centres above a defined threshold report energy and water performance into a European database, which converts water usage from an internal metric into a published one.

The industry’s current answer to the water problem is reporting — offsets, restoration credits, neutrality claims and basin accounting. That answer holds precisely until a facility appears in the same market with no consumption at all. At that moment the comparison is no longer between a good water figure and a poor one; it is between a water figure and its absence.

The addressable position is therefore broader than new hyperscale build. Every operator holding an evaporative loop in a water-stressed basin, every site facing a re-permitting cycle, and every campus whose PUE improvements have run out of room while its water figure has not, is looking at the same line on the same page.

10. Technology Readiness

The design is assembled from processes that are individually well characterised — vacuum evaporation, condensation heat transfer, sealed two-phase circulation — and its novelty lies in their integration into a containerised heat rejection unit with an in-pass treatment stage. Manufacture, charging and testing occur in the factory, which moves the qualification burden off the construction site and onto a repeatable production process. Field deployment proceeds by module, so capacity is validated incrementally rather than committed in a single structure.

The staged retrofit path described in section 6 is itself a readiness instrument. The first stage conditions the incoming stream without entering the existing loop and is reversible within a season, which allows an operating facility to establish performance under its own load and its own climate before the loop is closed. Development across the ARBOK cooling line is conducted as an ongoing research and engineering programme, with the module configuration matched to each site’s temperature level and thermal duty.

11. Risk Factors

Site specification governs performance. The cold line, the thermal duty and the ambient envelope determine the module count and the working fluid selection, and the configuration is calculated for the specific stream rather than taken from a catalogue. Delivery is therefore preceded by a site specification stage, and the guarantee attaches to that specification.

Vacuum integrity is the central engineering discipline. The design depends on sealed vessels holding a deep vacuum over years of thermal cycling, which places the load on vessel manufacture, weld quality, valve selection and leak monitoring. These are addressed in the factory rather than in the field, which is one of the reasons the unit is containerised.

Working fluid handling is a controlled item where alcohol is selected for the temperature level, with the corresponding storage, charging and fire-safety provisions built into the module and its site plan.

Grid and permitting interfaces remain. The installation removes the water permit from the critical path but not the electrical connection, and its schedule advantage is realised only where the surrounding approvals move at a comparable pace.

Commercial structure carries counterparty exposure. Under BOOM the technical risk sits with ARBOK across a contract measured in years, which makes contract length, indexation and the electricity price basis the terms that determine the outcome for both parties.

12. Conclusion

Two questions decide a data center’s water footprint, and only one of them is usually asked. The first is how much water crosses the meter at the fence. The second is how much water is evaporated elsewhere to produce the electricity the cooling system consumes. A scheme that answers the first question with an offset and never asks the second has counted half the problem.

ARBOK-DryTower answers both by removing the mechanism. Heat leaves the site as vapour inside a sealed circuit rather than as vapour rising from an open basin, and the auxiliary power that would otherwise be evaporated at the generating station is reduced by a factor of 7 to 24. On the reference node this is worth $4.6–10.9 million a year and a plot reduction of 50 to 67 times, with a cold line guaranteed rather than approached.

An operator can continue to buy water at $1.50 per m³ with offsets on top, treat the blowdown, run the biocide programme and carry the aerosol liability. Or the containers can be set down and the water line closed. The difference on one 10,000 m³/h node is $4.6–10.9 million a year. The difference for the town downstream is all of its water.

References

1. Shehabi, A. et al. 2024 United States Data Center Energy Usage Report. Lawrence Berkeley National Laboratory, LBNL-2001637, December 2024.

2. Mekonnen, M. M., Gerbens-Leenes, P. W., Hoekstra, A. Y. The consumptive water footprint of electricity and heat: a global assessment. Environmental Science: Water Research & Technology, vol. 1, 2015, pp. 285–297.

3. ASHRAE Technical Committee 9.9. Thermal Guidelines for Data Processing Environments, 5th edition. ASHRAE, 2021.

4. Directive (EU) 2023/1791 of the European Parliament and of the Council of 13 September 2023 on energy efficiency, Article 12 and Annex VII — reporting obligations for data centres, including water usage.

5. European Centre for Disease Prevention and Control. Legionnaires’ Disease — Annual Epidemiological Report. ECDC, Stockholm.

6. Centers for Disease Control and Prevention. Legionella (Legionnaires’ Disease and Pontiac Fever): Causes, How It Spreads, and People at Increased Risk. U.S. Department of Health and Human Services.

7. Cooling Technology Institute. CTI Standard 201 — Certification Standard for Commercial Water-Cooling Towers.