ARBOK-GEYSER vs. Mine Water and the Heat Pump

Britain is in an energy crisis and wants heat from anywhere it can One idea is to take water from flooded coal mines and reheat it with a heat pump. In Gateshead this heats 350 homes,…

Britain is in an energy crisis and wants heat from anywhere it can

One idea is to take water from flooded coal mines and reheat it with a heat pump. In Gateshead this heats 350 homes, offices, a college and an arts centre and saves 1,800 t of CO₂ a year. Seaham will heat 750 homes and save 2,600 t of CO₂ a year. The system is inefficient and expensive, but the water is already warmed to at least 18–20 °C. The salts are left alone: the water passes the heat exchanger and goes back into the mine, cooled to 8 °C.

Why hot geothermal wells stand idle

An average well (25 l/s, 3 g/l) passes 1,200 t of salts a season. The pipes clog. Reverse osmosis needs the water cooled to 25 °C, which throws away the very heat the well was drilled for, and it fails above 7% salt. So the hottest water stays underground.

ARBOK-GEYSER delivers heat for up to 600 homes from the same well

At 60–80 °C, without a heat pump, it earns about $1 mln a year on replaced gas and salts. The salts become products, and the water comes out fresh and clean.

Efficiency: 60 kWh of heat per 1 kWh of electricity

Reheating mine water at 18–20 °C with a heat pump gives 3–4 kWh of heat per 1 kWh of electricity. ARBOK-GEYSER does not heat the water at all. The heat comes from the well, and the module only cleans the water, spending 1 kWh/m³ net: about 60 kWh of heat per 1 kWh of electricity, 15–20 times higher. Salts add $50,000–200,000 a season.

Processes: one unit at the wellhead instead of a mine, two wells and heat pumps

Reheating needs a mine, two wells for intake and return, heat pumps and a lot of electricity. ARBOK-GEYSER is a single unit at the wellhead. Under deep vacuum the water evaporates at the temperature of the incoming stream, with no heating, boiling or cooling. The vapour condenses into clean water, while the salts, silica and boron remain as a dry, separated cake, a commodity. No membranes, no filters, no reagents. A crew of 2 runs it. The water leaves clean and at the inlet temperature, while with reheating it returns to the mine at 8 °C with its salts.

Benefit: about $1 mln per well per season

Gateshead as a whole is the heat of one well. Heating takes electricity for heat pumps: about 5 GWh a season, about $1 mln, as much as the gas would cost. With ARBOK-GEYSER one well saves $1 mln on gas, which means earns it, adds $50,000–200,000 from salts and spends about $60,000 on the module’s electricity. The total is about $1 mln a season. Through reheating the benefit is about zero; through power generation on the same water it is about $0.2 mln a year. ARBOK is 4–5 times better.

Scale

One well is 4 MW of heat and about $1 mln a year. Britain has 4 MW of deep geothermal today, and Cornwall plans about 100 MW, worth about $25 mln a year. The USA has 0.5 GW, about $120 mln a year. The world has about 48 GW, about $12 bln a year.

Salt stops being a curse

Salt was a curse as long as people tried to remove it from the water. It isn’t removed, it is collected. ARBOK-GEYSER is not a new well. It is clean water for the wells already drilled.