Trump demands that new data centers generate their own power, give surplus to the community or grid, and pay residents “dividends”. Prices, he says, won’t rise and may fall. Make deals and build.
Populist, if fair. “Surplus”? Everyone is short of power, 24/7…. And how would a data center “generate its own”?
Sun and wind give power only when the sun shines and the wind blows, a cluster needs 24/7. Smoothing takes batteries the size of the data center, and the community gets nothing to “receive”. Gas turbines are booked for years and tied to the gas price. Nuclear: 10–15 years to the first kilowatt, while AI needs power in 2027. Fighter-jet turbines? Coal? Fuel oil? Not serious.
One data center draws 100–200 MW, like a whole city, and we need more and more of them: about 270 GW across 3,400 sites. Goldman Sachs sees demand up 165% by 2030, and Maine’s law LD 307 already bans sites above 20 MW until November 2027. Bills rose 40% in five years, one family in three barely pays. A dead end for AI.
Enter ALB. A 1.5 MW container runs on any water: sea, industrial, even sewage. No fuel, sun, wind or uranium. Cold start in 30 minutes. The plant stands next to the data center, not hundreds of kilometers away, and fits a parking lot for a few dozen cars even at 200 MW. Units can be stacked in levels and rows. Demand grew? Add a unit, it is a 20-foot container. One fails, the rest carry the load. No storage needed: full power faster than a coffee cools.
Now the “surplus”. Capacity grows linearly with the number of units, so surplus cannot exist, but Trump is right: to avoid community anger, data centers must take on investment obligations. Not only draw from the grid, but guarantee residents additional independent generation, especially at peak load or blackout, and pass power to neighbors over its own cable. ALB also yields what others throw away: heat for the town and greenhouses, oxygen, hydrogen. These are the real “dividends”: not a paper with a percentage, but power and heat for people with a data center under their windows.
Power prices stop depending on gas, weather, tariff wars and bans. That is what Trump calls lower prices. The data center turns from the district’s enemy into its power plant: Trump saw the most unpopular sites become the most loved after a deal with the community.
Who pays for the plant? The data center, not the community. With a signed PPA, ARBOK builds and launches the system under off-take and PPA: the customer guarantees to buy energy at a fixed price. ALB always pays for itself: electricity, oxygen, hydrogen, heat on top.
The decree points the right way, but the winner is whoever puts kilowatts at the fence by 2027, not whoever speaks loudest. Make deals and build, yes, but with what waits for neither weather nor gas.