American scientists figured out how to teach a nuclear plant to “maneuver” around the grid. The calculation is for molten-salt reactors, but the principle is general. A dedicated heat storage unit sits between the reactor and the turbine. The reactor heats as it always has, and the surplus heat goes into a tank. In the evening the turbine takes the reactor’s heat plus the reserve from the tank, and the plant delivers more than the reactor itself can.
It looks like a breakthrough. In reality it is another abstract press release – no CAPEX, no payback periods, no economic rationale and no price spread at which the whole venture makes any sense. There is the phrase “may increase the value of the electricity”. Judge for yourself:
Storage… a tank of molten salt, insulation, pipes, pumps, a control system. And note: the turbine has to be bigger than the reactor’s, otherwise there is nothing to deliver more than the reactor gives in the evening. This is not an add-on to the plant. It is a second plant around the first, and the power buyer pays for it. Picture this structure, these costs and, in effect – a whole factory. It seems somebody took a grant, sulked over it for 3 years and produced some nonsense.
Add what we know about the new-generation reactors themselves. According to another American study, without subsidies small modular reactors deliver about 4 GW — roughly 4% of the country’s current nuclear capacity. A reactor costs from $10,000 to $20,000 per kW. A new plant without subsidies sells energy at $0.14–0.22 per kWh, while an industrial consumer in the US pays $0.09 on average. At the market price the plant sells power 1.5–2.5 times cheaper than it costs to make. Somebody has to cover the difference.
And onto this plant, which already lives on subsidies, they propose hanging a tank, insulation and a bigger turbine. The money comes from where it always comes from — the consumer’s bill.
Here a different story begins. ARBOK LONGBATTERY (ALB) delivers as much energy as the market asks for. The system is flexible by itself. It needs no storage because there is nothing to level out: the source follows demand, not demand adjusting to the source.
An ALB unit is a 20-foot container, 1.5 MW, 14 m² footprint, like a parking space for 2 cars. Need more capacity – order more units. Lower consumption – lower generation, need a shutdown – no problem, cold start – 30 minutes. For comparison: nuclear projects take 11–17 years to build, and budgets double or quadruple in that time. Units come from an ordinary machine-building plant, 5–10 units a day.
There is no point dancing with a tambourine, spending more money on a heat storage system with an unpredictable price and payback prospects.
They are squeezing water from a stone: one more tank, one more layer, one more paper. And the source can simply be replaced with a new one.