The chromatograph, without which making medicines is unthinkable, does not care what is happening in the world. It needs acetonitrile, which cannot be replaced and without which big pharma is simply "a goner". So it gets it, whatever the price. But the question is not only price. Nobody makes acetonitrile on purpose: it appears as a by-product of acrylonitrile production, the raw material for plastics and fibre. So here is the picture: demand grows at pharma, while the volume is set by someone else's petrochemicals. The scheme works, but there are nuances. We all risk being left not only without diesel, but without medicines.
The scale of the problem is easiest to grasp from three figures. The world makes 120–150 thousand t of acetonitrile a year. About 35% of it goes to pharma, which is more than 55 thousand t. And more than 70% of the pharmaceutical share goes to liquid chromatography and the synthesis of active ingredients. More than half of the by-product output is controlled by a few petrochemical groups in two Chinese provinces. In other words, all the chromatography in the world depends on how much acrylonitrile they decide to produce in Shandong and Jiangsu.
In 2026 the scheme broke. Acrylonitrile plants were closing, the Strait of Hormuz added chaos, and in parts of Asia and Europe the price of acetonitrile rose by 40–60% in a single quarter. In June in the US a tonne cost about $3,000, which is 3–4 times more than isopropyl alcohol. Pharma buyers received the invoices, and the price jump was passed on to the price of medicines. Hence the question: is there an additional source of acetonitrile? For example, where does it go after it has done its job in the instrument?
Who is to blame?
It is common to look for the guilty. And this time it is not big pharma. A pharma plant is not obliged to be an expert in petrochemicals, and a petrochemist is not obliged to think about chromatography. Neither is obliged to understand geopolitics. The blame lies with hidebound thinking and a faulty practice that has been built on it for decades.
First.
What is acetonitrile and why do we depend on it? Liquid chromatography needs a solvent that mixes with water, has low viscosity, is transparent in ultraviolet and does not interfere with the detector. Acetonitrile suits best, and replacing it is not easy: another solvent gives a different selectivity and a different column pressure, and the methods approved by regulators take years to rewrite. In other words, pharma is attached to acetonitrile the way a biker is attached to beer. A hooked buyer need not be pitied, he will pay. But that does not mean he has to pay twice.
Second: what waste are we talking about?
Having done its job in the process, acetonitrile mixed with water and became waste, and everyone has accepted it. Such is its fate. It used to cost pennies, and cleaning it or counting the savings was silly: we will buy more! Today everything has changed: every tonne carries a price so large that the buyer mistakes it for a part number, so many digits are in it, and the purchaser's jaw clenches. Now nobody wants to haul it off after the process. It is the same acetonitrile, only wet and a little dirty. Maybe dry it and clean it?
What exactly makes it waste? A typical liquid-chromatography effluent is about 75% water and 25% acetonitrile, plus traces of buffers, salts and drug residues. In essence, it is an expensive solvent diluted with water 3 times. Pour it into the drain and you go to prison. And there is nobody to hand it to: acetonitrile is flammable and toxic, it gives hydrogen cyanide on burning, and that has to be taken into account. For decades nobody cared, because it was not needed. It is easier to pay for removal, for neutralization, for paperwork, than to fiddle with it. It is easier to pay a new invoice for buying new.
Now let us imagine a reference plant. It buys 2,400 t of acetonitrile a year. In mid-2026 a tonne cost about $3,000, which is $7.2 million a year. All of it will once pass through the equipment and turn into 9,600 t of toxic effluent a year, about 26 t a day: 25% acetonitrile and water. It cannot be used again. It cannot be poured into the drain either. What can be done with it? Haul it away and burn it at high temperature. That, like everything else, costs money, and not a little. And buying new to replace the burned is even more expensive.
Let us see how this looks in the books. Purchase of solvent, removal of the effluent, neutralization, hazardous-waste paperwork, insurance of flammable cargo. Five lines, and none of them is called "losses": they all pass as "operating expenses", with the stress on the last word. While a tonne cost pennies, nobody cared. When the price rose by 40–60%, the lines stayed the same, but the sums in them grew even bigger. And nobody asked: "Can this somehow be cleaned and returned to the process? We only need to separate it from water and purify it." I think they asked, and there are even options for how to do it. But it is not that simple.
OK, Siri, how is such waste disposed of? Guess in three tries:
No. 1: azeotropic and extractive distillation. Acetonitrile and water form a mixture called an azeotrope: about 82–84% acetonitrile boils at 76.5 °C as a single substance, and an ordinary column goes no further. To break the azeotrope, a third substance is added: glycols, eutectic solvents, salts. Everything works. Only now a third one has appeared in the scheme, and as we know, three is a crowd. It is expensive, it suffers from the same supply-reliability problems, it has to be stored, cleaned and in the end disposed of again. One problem solved, a second one bought.
No. 2: salting-out and extraction. A salt or a polyol pushes acetonitrile out of water into a separate phase. They decided to apply it. A new kind of waste appeared again, a salt solution that again has to be put somewhere, and an apparatus that has to be taken apart every few cycles. There was one problem, now there are three.
No. 3: bench-top regenerators for laboratories. A spinning-band column delivers the azeotrope and cuts the volume to be hauled away by about 70%. That is not bad for a laboratory with litres of effluent. But for a plant with a tonne of waste a day, fussing with beakers is a children's toy.
And two of the three ways run into the same thing: to separate acetonitrile from water, the water has to be heated. The third, salting-out, moves the heating to the next step: the salt solution is evaporated afterwards. The latent heat of evaporation of water is about 630 kWh per tonne. Our effluent contains 7,200 t of water a year, so the "classic" offers a road to ruin: 4.5 million kWh of electricity, which all of us have suddenly started to lack. At an average electricity price of $0.20 per kWh this is about $1.1 million with overheads. You do not argue with a calculator.
That is the whole arithmetic. The plant is forced to burn and buy new, which costs more. It cannot distil: that needs a new workshop, and such a technology does not exist. In the end it is easier to hand it over and pay. Not because people are dim, but because in the hot scheme there is no economically honest route.
Third: there is one.
The ARBOK-ACN technology works on the Arbok ZERO WASTE DISCHARGE platform, which is named so because it processes all kinds of waste, leaving no secondary waste and without any need to buy extra reagents. The medium is deep vacuum. In it water boils at 7–10 °C, and acetonitrile even lower. For acetonitrile this is a physical advantage: at 10 °C its vapour pressure is about 5 times that of water, and in a dilute mixture the gap is even larger. This is exactly the principle Arbok uses. The equipment evaporates acetonitrile and water in turn. Their heats of evaporation differ: 0.22 kWh/kg against 0.63 for water. The condensation heat does not fly off into the atmosphere but returns to the cycle through recuperators: up to 98% of the energy goes round in a circle. What remains for electricity is about 1 kWh per tonne of stream.
Fourth: what is inside ARBOK-ACN.
Dilute effluent. Water with acetonitrile goes to the vacuum module. Acetonitrile goes into vapour first, the water after it. The liquids separate: the water is taken off as a separate stream and takes part in the process again. What the classic scheme treats as an uneconomical stream becomes raw material here.
The heavy part. Salts, buffers and drug residues stay in the still and are removed by auger as a dry residue. There is no liquid sludge, whereas in a hot column these same impurities smear over the distillate and are later picked out by adjusting temperature, pressure and reflux ratio. In cold vacuum there is nothing to pick out: they simply never went anywhere.
Above the azeotrope. Here Arbok uses a second cycle with the TEGA activator, a graphene-like material of its own production. No extra reagents, no membranes, no cavitation, no third substance that has to be disposed of afterwards. It is the 21st century.
Safety. Acetonitrile is flammable and toxic, so the unit for it is a dedicated version: explosion-proof electrics, vapour and leak monitoring, an inert blanket, emergency ventilation. Safety here is not an option but a condition of supply.
All of this is built on 8-foot containers, up to 30 t a day. Installation in 1 week on asphalt or in a workshop, with no capital construction, under a roof or without. Scale grows linearly by adding modules. A shift of 2 people serves dozens of modules.
Fifth and most interesting: where is the money?
Take that same plant with 2,400 t of acetonitrile a year. At about $3,000 per tonne the purchase is $7.2 million a year, which the return line removes entirely. Plus the bill for removal, neutralization and paperwork disappears.
Now the costs. Processing 26 t of effluent a day, or 9,600 t a year. At 0.7–1.2 kWh/t and an average European and US electricity price of $0.20 per kWh, the annual electricity bill is $1,300 to $2,300, against $1.1 million for the hot scheme. Arbok spends 490–840 times less. Personnel is one shift of 2 operators. Payback is 5–7 years, the standard horizon for industry.
On the world scale. Pharmaceutical acetonitrile is more than 55 thousand t a year. At $3,000 per tonne that is about $165 million of purchases every year, and at 25% in the effluent about 220 thousand t of liquid that nobody counts as a resource. That is the volume of about 23 of our reference plants. In the US, at the same June price of about $3,000 per tonne, our reference plant would pay the same $7.2 million.
And separately about volatility. A 40–60% price rise in a quarter is a catastrophe for the buyer and an acceleration of payback for the owner of the return line. Prices will keep rising, no doubt. Regenerated solvent costs the plant the same under any market conditions. A closed loop of its own is not an ecological tick-box, it is insurance against decisions made at someone else's plant.
Personal
The word "by-product" has always struck me as strange. Acetonitrile is a by-product at the plant that makes it, and at the same time the main product at the plant that buys it. It is the accountant, not the technologist, who makes it a by-product. The same with waste: spent acetonitrile is not waste, it is the same solvent, only diluted with water and dirt. Calling it waste is a management approach, not an owner's approach. The accountant does not care: debit, credit. The shareholders do care: every year this decision sends to disposal thousands of tonnes of a product on which one could not only stop spending but earn. Credit!
An industry that measures micrograms of active ingredient does not count tonnes of solvent. That is the real paradox of pharma.
The plant's choice is simple. Pay $7.2 million a year for new acetonitrile and also pay for removing the old. Or put an ARBOK-ACN unit on site, the size of half an ordinary shipping container.