Lithium is extracted from rocks, but more often from underground waters. Along with lithium salts, many other substances are present in them as well. Obtaining lithium salts from underground water is not about a rare metal…

Lithium is extracted from rocks, but more often from underground waters. Along with lithium salts, many other substances are present in them as well. Obtaining lithium salts from underground water is not about a rare metal – it is about volume.

Per 1 m3 of underground water, lithium salts may amount to only 0.6 mg/l – a few grams per ton of water. Besides these grams of lithium per cubic meter, tens of kilograms of everything else are also dissolved. Money is spent not so much on the lithium itself as on fighting the water – pumping, boiling it off, and the resulting energy, equipment, chemicals, and disposal costs.

LCE (Lithium Carbonate Equivalent) is the accounting unit for the most common type of lithium salt. Lithium itself may also take the form of hydroxide or other compounds, but to calculate economics, everything is converted to lithium carbonate equivalent.

Direct Lithium Extraction (DLE) is considered the classical method. It works by traditional means inside the water itself.

But another lithium-production system has appeared on the market – Arbok-Li – which works in a completely different way, treating water as the carrier.

This is the point of divergence.

DLE is a long chain of processes: injecting water into the system, water preparation, impurity removal, sorption or extraction, regeneration, precipitation, purification, and discharge of brine back underground. In reality, DLE runs 6-10 stages. Each stage means reagents, energy, separate equipment, and sensitivity to composition – if the composition changes, the system must be adjusted at increasing cost.

In essence, it resembles reverse osmosis with all the same drawbacks – high energy consumption, and reliance on filters, membranes, and chemicals. A portion of the water remains as brine, which is not discharged into the sea, as in desalination, but injected back underground. As a result, system efficiency is low, and the process is only justified by demand for lithium carbonate, whose market price reaches $15,000-20,000 per ton and, at peaks, up to $30,000 per ton.

Arbok-Li discards no water and creates no brine: 100% of the water it draws from underground is converted into clean water, suitable for technical or irrigation use and, where needed, for drinking.

The concentrate separated from the water contains lithium salts, rock salt, boron, silica, and other components. What follows is a single separation process, with no chemical chain. The output is clean water and separated solids with 10-15% moisture. Some of this is waste; some is LCE and salt, for which demand grows every year. Arbok-Li is part of the Arbok Zero Waste Discharge (ZWD) technology.

The difference between the two technological approaches is clearly visible in the comparative table of technical parameters.

Parameter DLE ARBOK
Process type Chemical Physical (vacuum)
Number of stages 6-10 1
Principle Selective Li+ extraction Water removal and full separation
Dependency on chemistry High None
Salinity range Limited Any (up to 35.5%)
Water temperature Requires control Any (incl. geothermal)
Sensitivity to composition High None
Li recovery 70-80% ~100%
Li losses 20-30% ≈0
Lithium product Multi-stage processing Lithium carbonate, dry
Other minerals In concentrate Wide range of commercial products
Water loss ~2 m3/t LCE ≈0
Water quality (output) Low / contaminated Clean (technical/agriculture)
Energy consumption 10-15 kWh/m3 0.72 kWh/m3 net
Chemicals Required None
Membranes Yes No
Consumables Yes None
Pumping required Yes No
System pressure High Vacuum
Liquid waste Yes None
Solids (sand, dirt) In concentrate Dry
Salt output No (in concentrate) Yes (10-15% moisture)
Lithium carbonate output After multiple stages Direct, dry
OPEX High Low
Capacity Limited 4,000-5,000 m3/day
Payback 15-20 years 5-7 years

Now the numbers.

Flow rate: 200 m3/h, or 1,584,000 m3/year. Lithium concentration: 80 mg/l. The flow contains approximately 127 t of lithium, for a maximum theoretical output of approximately 660 t LCE.

DLE yields approximately 500 t LCE. Arbok yields approximately 650 t LCE.

DLE sells LCE. Arbok sells LCE, clean water, and table salt.

Economics linked to technical advantages:

Parameter DLE ARBOK
LCE output, t/year ~500 ~650
LCE price $15,000/t $15,000/t
Lithium revenue ~$7.5 mln ~$9.75 mln
Water revenue $0 ~$3.17 mln
Salt revenue $0 ~$2.22 mln
Total revenue ~$7.5 mln ~$15.14 mln
Energy consumption ~15.8-23.8 mln kWh ~1.1 mln kWh
Energy cost ($0.12/kWh) ~$1.9-2.85 mln ~$0.13 mln
Chemicals ~$1.5-3.0 mln $0
Consumables ~$0.8-1.2 mln $0
Maintenance ~$1.0-1.5 mln ~$0.2-0.4 mln
Brine disposal ~$0.95 mln $0
Pumping & hydraulics ~$0.3-0.5 mln $0
Total OPEX ~$6.45-10.0 mln ~$0.33-0.53 mln
Gross profit ~-$2.5 to $1.05 mln ~$14.6-14.8 mln

Difference: +$15.76 mln per year.

Arbok has none of these disadvantages. DLE is a single revenue source carrying a full set of energy and other costs, and its output is a lower LCE volume plus brine that must be injected underground at additional expense.

Arbok is three revenue sources with almost zero costs. In addition, the simplicity of Arbok equipment makes it reliable, corrosion-free, and capable of operating 15-20 years with routine annual service.

Revenue difference: approximately $7.6 mln. Cost difference: approximately $8 mln. Total difference between the two systems: approximately $15-16 mln per year.

Conclusion

DLE solves a narrow task – extracting lithium (LCE). Everything else remains in the system: water, salts, residues, and the cost of handling them. Its economics rest solely on the lithium price and depend strongly on water composition.

Arbok-Li changes the foundation. Water stops being a cost and becomes a product. All dissolved substances become commodities, and lithium becomes part of the revenue rather than the only source of it.

Arbok creates no emissions, either into the air or underground. Low energy consumption – only 0.72 kWh/m3 net – allows the use of renewable energy, making Arbok LCE production green.

The difference between the two approaches is not one of process efficiency – it is a different level of working with the system. DLE works with an ion. Arbok works with the entire flow.

And that is why, given identical feedstock, one model balances on the edge of payback while the other delivers double-digit profit.


Also published on: LinkedIn — Michael Vischmidt · Facebook — ARBOK Institute