When Donald Trump signed his executive order in spring 2025 to launch large-scale lithium production in the United States, it was not just a slogan but an ultimatum. America can no longer rely on imports of critical raw materials. Lithium is not just a metal — it is the “blood” of the modern economy. Without it, no electric vehicle runs, no smartphone turns on, no energy storage works, and thus no new energy or defense industry survives.
Control lithium — and you control the future. Lose control — and you become hostage to foreign supply chains. Import lithium — and you wait for a stab in the back.
Old School: Lithium Golgotha
Today, about 30% of lithium is mined from hard rock, and 70% from brines using a method that looks more like the 19th century than the 21st.
Here is the cycle:
Brine with tiny lithium content (0.05–0.2%) is pumped from underground.
It is poured into giant evaporation ponds, covering tens to hundreds of football fields (hundreds of hectares / thousands of acres).
The sun evaporates water into the air. The brine is topped up again and again for 12–18 months until salts can be scraped with bulldozers and tractors.
The sediment contains sodium, potassium, magnesium, calcium — and tiny traces of lithium, often only ~0.6% of the mass.
At this stage, partial purification removes magnesium and calcium. Then semi-finished lithium chloride (LiCl) or concentrated brines are shipped thousands of kilometers (thousands of miles), most often to China. There, chemicals, filtration, washing, drying, crystallization, and standardization are performed, converting lithium into lithium carbonate (Li₂CO₃) or lithium hydroxide (LiOH).
China has become the world’s refining hub, processing over 70% of all global lithium — even if the mining is done in South America or Australia. The result is a white powder sold at up to $30,000 per metric ton (≈ $27,200 per short ton). This is not the price of rarity but of inefficiency. Even producing lithium carbonate inside the U.S. does not free it from dependency on China.
Operating Costs
Even after ponds are built, they burn money daily:
electricity for pumps,
chemicals and reagents,
hundreds of staff,
overseas shipping of semi-finished product.
Real-world projects:
Smackover (Arkansas) — 22,500 t/year. CAPEX: $1.45 billion; OPEX: $4,500–6,000 per metric ton (≈ $4,080–5,440 per short ton).
Thacker Pass (Nevada) — 40,000 t/year. CAPEX: $2.93 billion; OPEX: $6,200–8,000 per metric ton (≈ $5,620–7,250 per short ton).
Meanwhile, the market pays $30,000/ton only because otherwise the business collapses.
Land and Ponds: How Much Is Needed
In Chile, SQM’s evaporation ponds cover 3,200 hectares (≈ 7,900 acres); Albemarle’s exceed 1,000 hectares (≈ 2,470 acres). Under ideal Atacama desert climate, they produce 90,000–100,000 t/year.
In the U.S., where evaporation rates are lower and rainfall higher, producing 20,000 t/year would require 1,000–1,800 hectares (≈ 2,470–4,450 acres) of desert land.
Land in Nevada costs about $40,000–50,000 per hectare ($16,000–20,000 per acre). Just buying the land: $40–80 million. Building ponds, dams, lining, and pumps: $100–300 million. Infrastructure (roads, substations, pipelines): tens of millions more.
Total: $200–400 million just for “land + ponds” — not including chemical plants or logistics. In reality, half a billion dollars would buy the U.S. only raw material that must still be shipped to China for refinement. Mission failed.
New Path: ARBOK-Lithium
ARBOK-Lithium is not an evolution of the old way — it is a full replacement.
Instead of thousands of hectares of ponds — a few compact modules, 9 m² (≈ 97 ft²) footprint, 6.5 m (≈ 21 ft) tall.
Instead of waiting 12–18 months — processing in hours.
Instead of evaporating water into thin air — 200 t/day (≈ 220 short tons/day) of clean freshwater.
Instead of chemicals and membranes — natural low-temperature vacuum evaporation.
Instead of dependence on China — complete local production.
From brine, the module produces fresh water, lithium carbonate, sodium chloride, and other separated salts. Sale of table salt alone covers operating costs. No thousands of workers. No massive ports. Just a rail connection to ship finished product.
How ARBOK-Lithium Works
Brine is pumped directly into the module.
Under vacuum, water evaporates at ambient temperature and instantly condenses.
Salts precipitate and are discharged dry or as concentrates, depending on demand.
The output streams are: pure water, dry salts or concentrates, and selectively separated lithium.
One Module Produces
200–300 kg lithium compounds/day (≈ 440–660 lb/day, ~90 metric tons/year ≈ 99 short tons/year),
10–25 metric tons of table salt/day (≈ 11–27.5 short tons/day, ~5,500 t/year ≈ 6,050 short tons/year),
5–8 metric tons of other salts/metals/day (≈ 5.5–8.8 short tons/day, ~2,400 t/year ≈ 2,650 short tons/year),
200 metric tons of freshwater/day (≈ 220 short tons/day, ~73,000 m³/year ≈ 19.3 million gallons/year).
Energy use: 1–2 kWh per metric ton of water (≈ 0.9–1.8 kWh per short ton). A module consumes only ≈ 300 kWh/day.
Example: A Medium-Sized U.S. Brine Site
Assume a flow of 500 m³/hour (≈ 132,000 gallons/hour) or 12,000 m³/day (≈ 3.17 million gallons/day).
Modules required: 12,000 ÷ 200 = 60 modules.
Facility footprint: 60 × 9 m² = 540 m² (≈ 5,800 ft²); with service corridors ~3,000–3,500 m² (≈ 0.75–0.9 acres).
Power demand: 60 × 300 kWh/day = 18,000 kWh/day ⇒ average 0.75 MW.
Storage needs: • Lithium carbonate: ~15 t/day (≈ 16.5 short tons). Buffer 30 days ⇒ 450 t (≈ 500 short tons). Storage: ~200 m² (≈ 2,150 ft²). • Table salt: ~900 t/day (≈ 990 short tons). Buffer 7 days ⇒ 6,300 t (≈ 6,930 short tons). Storage: ~1,500 m² (≈ 16,150 ft²). • Other salts: ~390 t/day (≈ 430 short tons). Buffer 7 days ⇒ 2,730 t (≈ 3,010 short tons). Storage: ~700 m² (≈ 7,500 ft²). • Freshwater buffer: 12,000 m³/day = 12,000,000 liters (≈ 3.17 million gallons). Needs industrial tank farm.
Total warehouse/operational space: ~2,400–2,700 m² (≈ 0.6 acres).
Economics of One Module
Lifetime: 10+ years. Lithium carbonate production cost: < $2,000/metric ton (≈ $1,815 per short ton).
Byproducts:
Salt @ $40/t: 5,475 t/year ⇒ ≈ $219,000/year.
Other salts @ $100/t: 2,373 t/year ⇒ ≈ $237,000/year.
Water @ $1.5–2/m³: 73,000 m³ ⇒ ≈ $110,000–146,000/year.
Total byproduct revenue: ≈ $566,000–602,000/year. These revenues cover all operating costs, making lithium practically a zero-cost product. Payback: 4–7 years.
Scaling Up
To process the entire U.S. brine stream of ~4.38 million metric tons/year (≈ 4.83 million short tons/year) in this example:
Modules: ~60, occupying less than 1 hectare (≈ 2.5 acres).
Energy: ~18 MWh/day total load, average 0.75 MW.
Staff: 2 operators per 30 modules ⇒ 4 operators per shift.
Compared to the old scheme: tens of thousands of hectares (tens of thousands of acres), billions in CAPEX, hundreds of millions in OPEX, massive logistics, and severe CO₂ emissions.
Ecology
Traditional evaporation wastes water into the atmosphere, leaving behind salt deserts. ARBOK returns vapor as freshwater, suitable for drinking and irrigation.
For Nevada, Utah, and Arizona, this is not a bonus but a lifeline: every cubic meter (264 gallons) counts. ARBOK solves two problems at once — lithium + water supply.
Conclusion: America Starts the Lithium Race — and Wins
Old technology is a lithium Golgotha: billions in CAPEX, hundreds of millions in OPEX, thousands of workers, years of waiting, chemical dependence on China, and project paybacks stretching into decades.
ARBOK-Lithium is a technological leap:
compact modules,
production cost 10–25× lower,
byproduct revenues (salt + water),
no ecological damage,
all processes local,
higher product purity (no harsh chemicals),
renewable-ready,
minimal staff,
no land purchases for ponds,
total independence.
Political Message
Trump’s vision — is achievable. And it can be done faster, cleaner, and more efficiently than anyone expected.
Making America great again is possible. You just need to use new technologies like ARBOK-Lithium.
🇺🇸 Lithium Independence: America’s New Gold Rush ⚡️
Trump’s 2025 executive order to mine lithium in the U.S. wasn’t politics — it was an ultimatum. Either America secures its own lithium or stays hostage to China, which now controls 70% of global refining.
Old-school evaporation ponds eat up billions in CAPEX, thousands of acres of land, years of waiting, and endless chemicals — only to send semi-finished product back to Beijing.
ARBOK-Lithium changes the game: ✔️ Compact modules instead of salt deserts ✔️ Lithium at 10–25× lower cost ✔️ Freshwater + salt as bonus revenue ✔️ Zero dependence on China
This is not just mining — it’s national security. And it’s how America can win the lithium race.
👉 Full article below.