Post

ARBOK-PV: Silver and Beyond — What Is Left After Solar Panel Recycling

Silver does not run out in the ground. It runs out in circulation. For the sixth year running the world lives with a deficit accumulated to 215 million ounces — about a quarter of annual mine…

Silver does not run out in the ground. It runs out in circulation. For the sixth year running the world lives with a deficit accumulated to 215 million ounces — about a quarter of annual mine output. Exchange stocks are down to 136 million ounces.

And silver is the only precious metal that dissolves in water by itself. Gold and the PGMs have to be forced into solution with aggressive chemistry; silver dissolves in the very media the industry already works in: nitrate baths, fixers, mine drainage, etching. So the share of silver lost with water is structurally higher than for any other precious metal.

Dedicated silver mines yield only 27.8% of output; 29.4% comes off lead and zinc. Three quarters of supply is set by the plan for other metals, not by demand for silver: the industry structurally cannot raise output in answer to the deficit.

To the four streams ARBOK closes today, a fifth is added — and it is growing faster than the rest.

A stream that did not exist 10 years ago

Panels from the late 2000s are already coming off the roofs. Module life is 15–20 years and the first retirement wave has begun. The global forecast for 2050 is 60–78 million t of end-of-life modules. In Australia alone more than 1 million t of panels are expected, holding 300–500 t of silver.

It matters which silver we mean. A silicon module holds 300–500 ppm, 0.03–0.05% by mass — the front metallisation, a contact grid screen-printed in silver paste, films microns thick. This silver does not come back through scrap collection: coin and jewellery return, industrial silver does not. It has to be taken out of microns. That is where this article begins.

Every recovery route ends in water

The industry is building two routes.

The first, dominant one is acid leaching after the module is delaminated: nitric acid, methanesulphonic acid, deep eutectic solvents, then electrowinning. Silver passes through solution in full.

The second, new one is flotation pre-concentration: on published estimates it recovers 97.6% of the silver from milled cells and cuts the mass going to leaching to 1.4–2.8% of feed. An excellent beneficiation result, and I will not belittle it. But note the wording the trade headlines dropped: the mass going to leaching. Flotation does not remove the solution — it makes it 35–70 times smaller in volume and just as many times richer.

For Arbok this is not competition. This is better feedstock.

Both routes end the same way: the metal ends up in the water phase, and someone has to close that phase. Beneficiation changes the mass of the stream, not the state of the metal at the outlet.

How rich that solution is depends on the plant’s flowsheet, not on the panel. Nitric-acid leaching at 5 g per 50 mL gives about 60 mg/L of silver on whole modules and around 750 mg/L on delaminated cells. Deep eutectic solvents at a 1:500 ratio give 1.2 to 15 mg/L. A six-hundred-fold spread on the same metal.

What actually runs through the plant’s pipe

The composition is awkward in exactly the way every real industrial effluent is awkward: it is mixed.

Silver in nitrate form is the target metal. Copper travels with it: 81.4% reports to the concentrate at 0.25 wt%, and leaching tests record up to 145.32 mg/L of copper from multicrystalline silicon. Lead comes off the solder — 20.9% recovery, 0.89% in the concentrate; in the leachate it runs to 9.3 mg/L on TCLP against a 5 mg/L limit, so the stream fails by nearly a factor of two.

Then the organics: flotation runs on sulphydryl collectors dosed at 150 g per tonne of feed, and all of it stays in the process water. Dropping the acid does not mean dropping chemistry in the water — it means replacing it. And finally the alumino-silicate slimes from grinding.

A separate line is dust. Cutting, milling and handling produce fines carrying glass, lead and silver. The industry fights it with extraction and respirators — fighting a consequence. Dust should be taken into water where it arises: then it stops being an aerosol and arrives as a stream you can work with.

A nitrate background, three metals, thiophosphorus organics and fine slimes in one stream — precisely the combination on which standard schemes break.

Why they break

Reverse osmosis fails twice over: slimes blind the membrane mechanically, thiophosphinates foul it organically. The membrane becomes a consumable and the concentrate still has to go somewhere. Reagent precipitation moves the metals into sludge: with lead in it that is hazardous waste with a disposal charge, the silver sits mixed with copper and needs a second decomposition, and the water is lost. Ion exchange is poisoned by the organics — the collectors load onto the resin ahead of the target ion.

What all three share is that they fight the effluent. The task is framed as “bring it down to the limit”, and everything of value leaves in the sludge or the permeate together with the money.

ARBOK-PV is the missing part

We do not bring the effluent down to a limit — we take it apart. And we work with liquids only: that is not a restriction but the definition of the technology.

The physics is simple, and that is where its robustness comes from. Deep vacuum, ambient temperature, the whole stream treated with no prior splitting into fractions. Separation runs through a phase transition, not through a barrier, so there is nothing to blind.

Key parameters:

→ 100% of the water returns to circulation by volume

→ 0.72 kWh per m³ of effluent — and that is a net figure

→ no membranes, no reagents, no consumables

→ metals concentrate separately, one concentrate per metal, in a single pass

→ form factor — a 20-ft container, mounted on asphalt or concrete in the open air

Let me underline the separation, because for a PV stream it decides everything. The problem is not that the stream holds silver, but that the silver is mixed with two other metals, one of them toxic. A scheme that pulls everything out together leaves a concentrate that needs one more stage — and that stage eats the margin. Separation in a single pass removes it, and the concentrates go to the operator’s existing chemistry.

We do not take sludge — not because we cannot, but because after ARBOK-PV there is none. The metals leave as concentrates, the water returns to circulation, the residual leaves dry and inert. Lead and cadmium bring no money, but they decide the fate of the site.

Classical water-treatment schemes on a comparable stream give 200–400 t of CO₂ a year; ARBOK on grid power about 28, on solar zero. Water quality is confirmed by SGS testing.

Economics of one unit

The calculation runs on a 200 m³/day module — 73,000 m³ of effluent a year, silver at about $2,040/kg.

At 15 mg/L the unit gives 1.1 t a year, some $2.2 million. At 60 mg/L — 4.4 t, $8.9 million. The upper case, 750 mg/L, gives 54.8 t — figures quoted only against a site assay. The lower one, 1.2 mg/L, gives 88 kg: here the displaced treatment pays, not the metal.

To this add two items present on any site:

→ water — $0.1–1.1 million a year at $1–15 per m³

→ discharge and disposal charges no longer incurred — $0.05–0.5 million

Today recycling a module costs $10–15 against a few dollars for landfill, and the whole argument is about closing that gap. In that arithmetic the liquid loop has always sat in the cost column. We move it into the revenue column. Payback 5–7 years.

What else lies in the same water

Silver is the most valuable outlet, not the only one.

Copper travels in the same stream: at 145 mg/L the unit takes 10.6 t a year, which at about $14,550/t is some $0.15 million. Modest against silver, but it is an increment on the same cubic metre — copper needs no separate stage.

Tin arrives with the solder and trades at about $43.5/kg — an order of magnitude dearer per kilogram than copper, though the mass in a module is smaller.

Thin-film modules change the picture more. A gigawatt of retired modern CdTe modules carries 15.2 t of tellurium; at $120–245/kg that is $1.8–3.7 million, and all of it passes through solution. Early generations ran up to 93 t/GW — the oldest panels, the ones coming off the roofs right now, are the richest. CIGS adds indium, gallium and selenium; indium trades around $595/kg.

The point is not to add these lines into one figure — every site’s stream is different. The point is that all of them are already in the water the plant pays to dispose of. One cubic metre, one unit, and the cost per cubic metre does not depend on concentration. Every additional metal is revenue with no additional processing stage.

Who this is addressed to

Solar-module recycling plants are the new and fastest-growing addressee. Plus the four streams where the technology works today: mine drainage, fixers, plating and etching rinses, copper-refinery effluent. All five have one thing in common: the water there will have to be cleaned in any case. The only question is whether that treatment stays a cost line. For new sites we offer delivery with no capital outlay by the client: BOOM, or payment per cubic metre treated.

Conclusions

First. Panels are already being recycled, and increasingly well. The problem is not dismantling the module — it is that every line leaves behind a liquid with nowhere to go. That is where the industry’s economics break.

Second. Everything of value in a panel passes through solution. Silver, copper, tin, tellurium, indium — none of them leaves the line as a solid saleable product; all end up in water. Whoever closes the water takes the metal.

Third. The toxic and the valuable travel together. As long as they are separated in two stages, the second stage eats the margin. Separation in a single pass is the difference that moves the water stage from cost to revenue.

Fourth. The window is not open forever. Panels retiring in 2045–2050 will be poorer in silver: silver per watt is falling and copper metallisation is advancing. The rich generation is coming off the roofs now.

Industrial silver demand rose from 588.7 million ounces in 2015 to a record 680.5 million in 2024. Scrap will not close it: what comes back is jewellery and coin, not metallisation. What is left is solution.

A question for those building panel-recycling plants right now: are you putting the liquid loop down as a cost, or as a second processing stage?

👉 Building or designing a solar-module recycling line? Write to me directly.


Also published on: LinkedIn — Michael Vischmidt · Facebook — ARBOK Institute