π€ AI’s hunger for energy and restrictive measures by US states are putting the future of AI in America in question. πͺπΊ In Europe it is even worse: there is no energy as it is β and now AI on top. Europe doesn’t need it, but it has to thumb its nose at America, pour in billions and still lose. Those are political judgements, though. β‘ Where will the energy come from? Compressed gas β from the same USA? Seriously?
β In fact, there is an excellent solution. With just one energy development from ARBOK, America can be caught up with β and with our computing and data-compression technologies, overtaken.
π More on the energy in the article below. Critics, please relax: we are comparing two ideologies β small modular reactors and our ALB, at the same stage of readiness. But if you are curious and looking for a way out of the energy crisis, I promise β this will be a superb read.
βββ
A Small Nuclear Reactor Behind the Factory Fence
βοΈ A University of Michigan team has stated with authority that small modular reactors (SMR) cannot compete in the power sector. Without state or private subsidies, their model finds only 4 GW of SMR capacity in the US that could run without support β about 4% of the country’s current nuclear fleet. Only a $3/kg clean-hydrogen tax credit lifts that to 91 GW β and only for reactors making hydrogen for ammonia, refining and steel. The Michigan conclusion: SMR is not a universal solution but a niche one. Everything else is losses β and the media hype turned out, once again, to be paid-for rather than true.
π What SMRs offer
An SMR is generation next to the consumer β no power lines, no connection queue, no grid harmonisation, your own generator, like a home backup set. Remember Texas in February 2021, when wind power froze and the state sank into cold, dark chaos. Whoever had an SMR under their nose saw no outage.
The approach has a right to exist β but only where it runs at a profit. Subsidies can vanish overnight, as with electric cars and solar panels.
The ARBOK Institute offers exactly the same philosophy with ARBOK LONGBATTERY (ALB). The difference lies in what stands behind the fence. Both are still in development, so the comparison is fair.
π The baseline: 300 MW, 24/7
A large refinery or ammonia plant needs exactly that β 300 MW around the clock. Holtec plans two SMR-300 units at Palisades, Michigan, so one SMR-300 is an honest benchmark. The alternative: 150 ALB units, 20-ft containers of 2 MW each, 14 mΒ² footprint apiece β two parking spaces.
At a capacity factor of 90% β roughly 330 days of full output a year β both deliver about 2.4 TWh a year. That is the only thing they have in common.
π° Who pays for the reactor
NuScale’s flagship in Idaho, 462 MW, was cancelled in November 2023 when its estimate hit $9.3 bln β about $20,000 per kW. Four BWRX-300 units at Darlington, Ontario: C$20.9 bln (about $15 bln) for 1,200 MW β about $12,500 per kW. At $10,000β20,000 per kW, a 300 MW reactor costs $3β6 bln.
SMRs have to be bought. A plant buying its own reactor freezes $3β6 bln for years. Payback for a large nuclear plant: 20β30 years; for a four-SMR project, 18β37 years.
Unsubsidised, a new nuclear plant produces power at $0.14β0.22 per kWh (Lazard, 2025). US industrial customers paid an average of $0.09 per kWh in 2025. A new nuclear plant sells at market price 1.5β2.5 times below its own cost. Someone has to subsidise the gap: even long-paid-off plants receive federal and state top-ups.
β‘ ALB works on a different model
ARBOK delivers ALB under BOOM: it finances, installs, operates and maintains the units at its own cost and sells energy to the customer under a PPA β an off-take agreement for a set volume at a fixed price for 15β20 years. The customer borrows no billions and pays no interest that ends up in the tariff. Customer capital: zero. Customer technology risk: zero.
On 2.4 TWh a year, a plant with an SMR pays $330β520 mln a year for electricity β at a tariff that must recover the reactor’s billions. The ALB tariff is fixed at signing for the whole contract.
The Michigan study rests entirely on the 45V hydrogen credit β and the July 2025 budget law kept it only for projects starting construction before 2028. No hydrogen SMR can meet that deadline.
β³ Time β the decisive number
NuScale offered its design from 2017 to 2025. Result: not one fool could be found to order it.
Russia’s floating Akademik Lomonosov, 70 MW: 13 years from construction start to commercial operation. China’s HTR-PM, 200 MW: 11 years. EDF built Flamanville 3 at home for 17 years, with the budget up 4 times, from 3.3 bln β¬ to 13.2 bln β¬. Its Hinkley Point C in Britain: from Β£18 bln to Β£35 bln, first unit no earlier than 2030.
Holtec promises 2030 for Palisades, though it has never built a reactor. A reactor ordered today powers the plant in the mid-2030s.
ALB modules are planned for manufacture in the USA: an ordinary machine-building plant will turn out 5β10 units a day. First modules in 6 months; the same 200 MW in 1β2 years. Need more β order more units.
π§Ύ Behind the meter is not beyond the rules
The point of on-site generation is escaping approvals. An SMR escapes the grid queue β and nothing else. It still needs land, community consent, permits, a licence, grid harmonisation, security, an environmental assessment, hearings and an emergency plan. Its standard emergency zone is 16 km β about 800 kmΒ² of evacuation planning.
ALB is a different story: no nuclear licence, no exclusion zone, no evacuation plan, no nuclear waste, no air defence against drones. A unit is an ordinary TARK-type shipping container on concrete or asphalt next to the consumer. Stacked 10 in a row, 5 rows, 3 tiers high, 150 units occupy about 700 mΒ² β a supermarket car park. The guarded zone of a small nuclear plant alone is about 27,000 mΒ² β almost 40 times more, to buy, fence and guard for 60 years.
Per square metre, ALB produces 7 times more energy than a nuclear plant β a world lead β and 13 times more than an SMR-300 on one tier, almost 40 times on three.
One unit generates about 1.4 MW; the process also yields hydrogen and oxygen. Oxygen sells on the open market; hydrogen is sold β no $3/kg subsidy needed β or fed back into the unit. Hence 2 MW. Output is adjustable; units switch on and off. Cold start: 30 minutes.
π· People
A US nuclear plant employs 500β800 people β armed guards, licensed operators, radiation protection: a second, nuclear-grade organisation inside the refinery’s fence. ALB: full automation, remote monitoring, a couple of engineers, operators and security β 10β20 people. That’s not 800.
β’οΈ Waste and end of life
A 300 MW light-water reactor discharges about 6 t of spent fuel a year β about 360 t over a 60-year licence. The US already stores over 90,000 t with no permanent repository. SMRs are expected to produce 2β30 times more radioactive waste per unit of energy than large reactors. Decommissioning takes up to 60 years β the reactor’s liabilities outlive the factory.
ALB at end of life is a steel container: COβ below 0.1 kg/t, zero SOβ, no liquid tailings, no radiation. Its 20-year life is just the bank’s planning horizon: a worn unit is lifted out by crane and replaced, so the plant can run 40 or 60 years.
π§ Fuel
Many advanced SMRs need HALEU β uranium enriched to 5β20%. Until 2024 the only commercial supplier was Russia; the US ban on Russian uranium carries waivers only to the end of 2027.
ALB’s fuel is water β 10 times less than the cooling towers of an equal reactor evaporate. Its cost is invisible in the price of a kilowatt-hour. The unit pays for itself β with electricity, oxygen and hydrogen β and heat comes on top: about 185 kW per MW, for heating, hot water or the plant’s own processes. Feed water can be brackish, the customer’s own effluent or even sewage β and nobody has ever run short of sewage. ARBOK treats and desalinates water with no secondary waste.
π― Security
In the age of drones, a couple of hits can stop any nuclear plant or SMR. Zaporizhzhia, Europe’s largest nuclear plant, has been occupied since March 2022. In 2025 a drone pierced the Chornobyl shelter. A reactor beside an ammonia plant makes two top targets behind one fence.
Drones can hit ALB too, but: units can be placed underground or inside a building, and a hit stops 2 MW β 0.7% of the plant, not all of it. It is replaced in days. No release, nothing to capture.
π Geography
πΊπΈ USA: Michigan’s first wave is 91 GW β at $10,000β20,000 per kW, $900β1,800 bln of capital and first power in the 2030s. The same 91 GW of ALB: about 45,500 containers, with zero customer capital and no spent fuel.
π World: industry roadmaps talk of hundreds of GW of SMRs by 2050. Every 100 GW costs $1,000β2,000 bln plus spent fuel with nowhere to go. The same 100 GW of ALB: 50,000 containers that customers never buy β they only pay per kilowatt-hour.
π¬ What remains to prove
ALB stands at TRL 7: next come industrial modules, independent measurement, certification and production in customer countries. For SMRs, the question of on-time, on-budget construction has stayed open for decades.
π΄ Bottom line
The future of energy is still unknown. Certainly not wind or sun. Nuclear is good, but expensive and slow, and its cost runs 1.5β2.5 times above the selling price β every plant needs local or federal subsidy. There isn’t enough money for all the SMRs.
The most logical, convenient and safe option is generation next to the consumer. Where the Michigan study goes wrong is in what to put there. A reactor behind the fence brings the whole nuclear site with it: billions frozen for decades, a 16 km planning zone, armed guards, a 60-year waste bill and first power in the 2030s.
A container takes any water and returns electricity. The customer pays only per kilowatt-hour.
Uranium behind the fence in a decade β or water in a container in 6 months?
Also published on: LinkedIn β Michael Vischmidt Β· Facebook β ARBOK Institute
