Post

PALLADIUM. A monopoly and a deposit at once — and the deposit is in waste streams everywhere.

❌ The fact: palladium is not mined for palladium. It is a by-product of nickel in Russia and of platinum in South Africa. Not one mine exists in the USA, the EU, Japan or China, and…

❌ The fact: palladium is not mined for palladium. It is a by-product of nickel in Russia and of platinum in South Africa. Not one mine exists in the USA, the EU, Japan or China, and none can be built — there is no ore. So the only palladium the West controls is what it already imported: in the converters of scrapped cars, in boards, in connectors and in plating baths. The rest is bought from two countries.

❌ The numbers:

→ Palladium: $1,802/oz on 3 February 2026 — about $58,000/kg

→ +79.75% in a year, and in January it took a three-year high of $2,200

→ Heraeus forecast a $950–1,500 corridor for 2026. The market blew through it in January

→ Russia — about 40% of primary output, South Africa most of the rest

→ Autocatalysts take about 85% of demand

❌ Where PALLADIUM is used:

→ Autocatalysts: it oxidises CO and hydrocarbons; without it a petrol engine fails the standard

→ Electronics: MLCC capacitor electrodes, connector plating

→ Boards: palladium activation before through-hole metallisation

→ Chemistry: hydrogenation catalysts, hydrogen membranes

→ Dentistry and jewellery

🟢 ARBOK-ZWD pulls palladium out of three liquid streams.

1 — Leachate of end-of-life autocatalysts: the recycler already dissolves the washcoat in acid. The problem begins in the solution: taking the acid off, and splitting palladium from platinum and rhodium.

2 — E-waste leachates: boards, connectors, capacitors. Dissolution was solved long ago, separation was not.

3 — Plating and activation baths and their rinse waters: palladium leaves continuously, every day, and it is counted as effluent.

🟢 HOW IT WORKS.

→ deep-vacuum separation at ambient temperature. A 20-ft module, 200 m³/day, takes any stream whole. Output:

→ 100% of volume as clean water, zero discharge

→ salts and metals as dry separated fractions

→ No membranes, no reagents, no consumables. Under 1 kWh/m³.

Then: the concentrate goes to compact refining, with platinum and rhodium alongside.

🟢 Economics, prices minus 20%:

→ A tonne of scrap autocatalyst at 1 kg palladium per tonne: ~$46,000

→ A module, 73,000 m³/year, on rinse waters at 1 mg/L: ~73 kg/year = ~$3.4 M

→ At 5 mg/L: ~365 kg/year = ~$17 M

→ Platinum and rhodium from the same solution — on top

→ Discharge removed and water back into circulation — a line of its own

🟢 Who needs Palladium:

→ EU and Japan: car scrap collected by law, separation does not exist

→ USA: catalyst plants exist, ore does not

→ China, Korea, Taiwan: boards and MLCCs, and the baths are right there

→ Any country that dislikes its emissions standards depending on two suppliers

🟢 Bottom line: the West has no palladium and will not have any.

It is not in the ground. It is in old cars and in boards already sitting on recycling yards. Separating it there is cheaper than buying it. While the separation happens elsewhere, they keep buying from those who have it.

@Arbok #Palladium #CriticalMinerals #ZWD


Also published on: LinkedIn — Michael Vischmidt · Facebook — ARBOK Institute