Post

ARBOK has developed the concept of an effective system for cleaning port-side bottom sludge

📢 MUST READ! Cleaning Port-Side Sludge Arbok technology with full resource recovery: fresh water, salt, sand and clay, fuel, oil and metals ⚠️ The Problem Every port in the world is slowly silting up: rivers carry…

📢 MUST READ!

Cleaning Port-Side Sludge

Arbok technology with full resource recovery: fresh water, salt, sand and clay, fuel, oil and metals

⚠️ The Problem

Every port in the world is slowly silting up: rivers carry sediment, currents drag suspended matter, ships’ propellers re-deposit the mud. If a port is not cleaned, its draft drops and it stops receiving vessels. That is why dredging is not a one-time construction job, but a perpetual expense, recurring at 68 % of major ports every 2–3 years.

The scale is global. Worldwide, more than 1 billion m³ of sediment is lifted from the bottom every year, and with channel deepening — up to 2.4 billion m³. The USA — about 300 million m³ a year, China — about 100 million m³, France — about 50 million m³, Morocco — more than 3.4 million m³ just to fight the silting of its ports. Maintenance cleaning serves about 870 harbors and removes on the order of 560 million m³ of sludge a year. Typically the sludge level in port-side zones is 0.5–2 meters, accumulated over 2–3 years (siltation rate 10–100 cm/year, on average about 0.3–0.6 m/year; at harbor entrances up to 1 m/year).

Drawback one — ecology. Half of the sludge is contaminated: cadmium, lead, mercury, copper, zinc, tin and TBT from antifouling paints, PCBs, petroleum products. During dredging this suspended matter rises into the water, poisoning bottom communities and entering the food chain. Re-dumping such extracted material at sea is banned by the London Convention and regional regimes (OSPAR, EPA) — precisely because of the heavy metals.

Drawback two — vessel limitations. Because of shoaling, the port stops receiving ships that were calling there just a year ago. It got shallow — it must be cleaned.

Drawback three and the main one — costs. We count all expenses in broad blocks, direct and indirect. Direct: dredger lifting, dewatering, transportation, disposal. Indirect: rent of landfills and storage facilities, environmental fines and compensations, berth downtime, contamination monitoring, legal liability for toxic ground for decades ahead.

💸 What It Costs Today

The price depends sharply on the cleanliness of the sludge:

By area: cleaning 1 km² of bottom with a 1-meter sludge layer is about 1 million m³ of sludge. Clean sludge — $2–20 million per km²; contaminated — from $50 to 400 million per one km². As an example: Indiana Harbor (USA) — $80 million for 54,000 m³ of contaminated sludge.

What is done with heavy metals today: they are almost never recovered, but isolated — confined facilities (CDF), special landfills for hazardous waste, cementing (solidification into a solid block), capping on the bottom. The metals remain in the ground forever as a liability. It is for the toxicity, not the dirt itself, that the port pays $50–400/m³.

Sludge cleaning in ports falls on the budgets of states and ports. In the USA the Army Corps of Engineers funds about 95 % of the work; the budget for fiscal year 2026 is $10.44 billion, replenished by the Harbor Maintenance Trust Fund levy of 0.125 % on cargo value. The global dredging market — $17–20 billion in 2025, the port segment — about $3.7 billion, growing to $6.3 billion by 2035. This is the aggregate global expense that today goes into the ground together with the sludge.

⚙️ The Arbok Technology

Arbok solves several tasks at once in one move: it cleans, and does not spend on it, but brings earnings. For the first time a cleaning project turns from a headache and billions in costs into a system that earns those same billions — now with a plus sign.

Technology-1. Lifting — Arbok Water Upwelling (AQWU). From the shore or a barge, hoses are lowered to the bottom; the system itself lifts the bottom mass of sludge upward and draws it into the unit. The lifting is based on the airlift principle — raising the water-sludge mixture inside the pipe to the surface through hydrostatic imbalance, without mechanical pumps. Energy is needed only for the air compressor and is covered by solar panels — the sludge rises from the bottom almost for free.

Technology-2. Processing — Arbok ZWD (Zero Waste Discharge). The sludge is fed into a vacuum phase-separation unit. Under deep vacuum only water evaporates, at ambient temperature, without reagents, membranes or filters; the components separate by volatility and density into clean streams. Heavy metals come out as separate salts — recovery instead of burial. Water recovery up to 99.98 %, zero liquid discharge.

Arbok-Jumbo configuration — 4,800 tons of sludge per day: six twenty-foot containers vertically plus a dry-sludge extractor, then a pelletizer and packing into big bags; fresh water is collected in a 3,000–4,000 m³ tank in the ship’s holds or onshore. No boilers, furnaces or reagent facilities. One module occupies only 70–100 m²; the working area with the water tank — about 400–500 m².

Cost price: on the barge the energy is own, there are no consumables — the variable processing cost is near zero, only wages and depreciation remain.

♻️ What the Sludge Yields (not a gram of waste)

Calculation for dense sludge: density about 1,300 kg/m³, dry-matter share 50 %, pore water is seawater (3.5 % salt). Dry residue: mineral part (sand and clay) ~88 %, organics ~10 %, oil cake ~1 %, heavy metals ~0.2 %.

One Jumbo module cleans 1 km² of a 1-meter layer in about 9 months. The number of modules depends on the site or barge: for example, 10 Jumbo units is 48,000 tons of sludge per day, cleaning the same 1 km² in about 27 days. No landfill is needed — there is nothing to bury. The water is taken by port services at $1 per m³. The salt is stored for sale ($60–100 per ton at the port). Clean sand and clay are transferred to other vessels as building material and fill. The organics go into DOC (Dry Organic Chips) as pellets (14 MJ/kg, ~$230 per ton). The oil cake and metal salts — as separate products.

💰 How to Make Money on This?

Earnings = eliminated costs (savings) + new revenue. The main source is not the sale of products, but the eliminated cost of disposing of toxic sludge ($50–400/m³): it is for the toxicity of the metals that the port pays the most. To this saving is added the revenue from six products.

Prices for calculation: DOC as wood pellets ~$230 per ton (in 2026 industrial pellets are $180–240, US average ~$242), salt $60–100 per ton, clean sand and clay ~$10 per ton, water $1 per m³, oil cake ~$400 per ton, metal salts ~$1,000 per ton (the last two are tentative assumptions).

Revenue structure per 1 km²: DOC ≈ $15.0 million; sand and clay ≈ $5.8 million; oil cake ≈ $2.6 million; salt ≈ $1.8 million; metal salts ≈ $1.3 million; water ≈ $0.6 million. Total ≈ $27 million.

One Jumbo module per year (about 340 working days, about 82,000 tons of DOC) yields about $34 million in product revenue at near-zero variable cost — not counting the fee for the cleaning itself.

A caveat for the world: about 65 million tons of organic DOC is produced per year — this is already comparable to the current global wood-pellet market (production about 50 million tons a year). The source is different: bottom sludge, with which ports already wage a perpetual war. Such a volume is of interest not only to the private consumer, but above all to power plants as a replacement for coal and biofuel.

The point is simple: what the world today spends — about $17–20 billion a year — Arbok turns into a source of income. The eliminated loss plus the new revenue give a total positive turnover of about $44 billion a year. The expense changes its sign to a plus. Savings are earnings too. If you are located within such ports, together with Arbok you can organize this business and bring benefit to yourself, Arbok, the port, the industry, the ecology and the planet.

🎯 Where to Start

Enter first the ports with the most dangerous, contaminated sludge. There cleaning reaches $400 per m³, the ban on sea dumping is the strictest, and the value of the removed problem is maximal — that is, both savings and revenue are at their limit. Offer the service, agree on the total volume, the term and the price. The offer is more advantageous than ordinary dredging thanks to the by-products — the port administration will accept it without doubt.

With the obtained data, together with Arbok a business plan is calculated, the investment amount and the terms of cooperation are determined: a JV, equipment purchase, leasing, or a BOO (build-own-operate) scheme on a pay-as-you-go basis under an off-take agreement with the port. Arbok does not conduct operational activity — that is always on the partner.

📋 What You Need to Know for a Specific-Port Calculation

The sludge composition (density, dry-matter share, shares of organics, oil and metals by samples); the cost of cleaning 1 m³ and the term; the port’s interest in buying fresh water and its price per m³; interest in pellets for power plants and in salt for the needs of the port or its clients.

✅ Conclusion

For the first time a project resembling a trip to the dentist — “don’t want to, but must” — stops hanging like a weight on the port’s budget. The partner and Arbok do many good things at once: they clean the port, spare nature, produce clean water, salt, fuel, extract heavy metals and oil residues, hand over clean sand and clay — and all of this is now in marketable form and is sold separately. And tell me you have already heard of this. No — here Arbok is a pioneer.

Notes: the sludge composition and product prices are estimates; the shares of oil (~1 %) and metals (~0.2 %), as well as their prices, are taken tentatively and refined by samples. The calorific value of 14 MJ/kg is attributed to the organic share of DOC. Arbok parameters (AQWU, ZWD, Jumbo) are from the internal database; market data are from open sources of 2025–2026.


Also published on: LinkedIn — Michael Vischmidt · Facebook — ARBOK Institute