Who among us doesn’t know the Vassiliko Cement Works? It has been operating since 1963, producing about 1.2 mln tonnes of cement per year, while its technology has remained the same for 63 years. VCW is the largest industrial enterprise in Cyprus, and half of everything our island has was built on its products.
But besides cement itself, the plant produces something else — something none of us likes, especially those who live not far from the facility. That something is dust. Cyprus has repeatedly been reprimanded by Brussels for the deplorable state of dust emissions, and the matter is in court over fines for poor air quality. Yes, we can tell fairy tales about sandstorms from Africa or the Arabian Peninsula while shamefully keeping silent about the dust we ourselves create on our own shore.
Cement kiln dust is the flip side of cement production technology — during the firing of clinker, the raw material for cement, the potassium and chlorine it contains evaporate at ~1,000 °C. These chemical elements then condense in the preheater and circulate in the kiln until ring buildups stop it. To combat this, the kiln design includes a special diversion — the so-called bypass — through which the accumulated dust is removed. This dust is loaded not only with potassium and chlorine but also with lead, cadmium and thallium. The entire mass is collected and hauled to a landfill. And this is no small matter — a full 15,000 tonnes of dust per year. No, this is not the dust we are talking about. These wastes are collected and removed. But what the plant’s filters cannot capture — namely the fine aerosol of potassium chloride — that escapes through the stack as invisible particles, so small they penetrate deep into the lungs and enter the bloodstream. We no longer even understand what makes us ill. We blame “the environment,” although we used to believe the air in Cyprus was clean — no industry and the sea all around. But no. All this toxic aerosol is released into the air as a barely perceptible dust plume that settles on our cities — part of it lands on our furniture, which we have long despaired of wiping every day, but the same dust ends its journey in our lungs.
Air quality measurements in Limassol recorded 133 µg/m³ of suspended particulates, while the European limit is 50 µg/m³ — nearly 3 times less. That is what Cyprus is being fined for. In May 2025 the Cyprus case was referred to the EU Court for violations of air pollution directives, threatening us with fines of tens of millions of €. A separate infringement proceeding on air quality is open under Directive 2008/50/EC — just 1 step remains before the Court’s fine. These millions will not come from the pockets of ministers who do nothing, but from the pockets of taxpayers — that is, us.
Who gets the dust
The plant sits on the coast, 28 km east of Limassol. Between it and the city lies the Amathus resort strip: Four Seasons, Parklane, Amathus Beach Hotel, GrandResort, St Raphael. When the wind blows from the east, cement dust blankets villas, hotels and beaches. Tourism is the 2nd sector of the Cypriot economy. The conflict between industry and a resort coastline on the same shoreline is not some abstract ecology — it is a real problem.
But shutting the plant is not an option. Without cement you cannot build a house or a road. Buying cement means imports and dependence all over again. The answer — stop hiding behind excuses and empty TV talk, and start solving the problem. Especially since Cypriot scientists have already developed Zero Waste Discharge technology, which treats waste not as a punishment but as a raw material for producing useful marketable products.
Let’s go back to what lies in this dust
Cyprus is an island with nearly 100,000 hectares of arable land. Every year the country imports 7,000–8,000 tonnes of potassium chloride — potash fertiliser. Without it there will be no harvests. The entire volume of fertilisers is 100% imported. Not a single domestic deposit or production facility. Every tonne arrives by sea. When the Strait of Hormuz closed in February 2026, the price of urea jumped from $400 to $850, and potassium chloride — the main potash fertiliser on the world market — rose by 12%. An island economy with total dependence on fertiliser imports is in the zone of maximum risk. When you see bread or meat prices in 2027 at Skalinidis or Alphamega nearly 2 times higher — don’t be surprised. It is not farmers’ greed, it is not a conspiracy — it is the increased cost of fertilisers passed through to the final product.
At the same time, in that very same hazardous cement dust from Vassiliko there is up to 6% potassium oxide. Potassium — that is exactly what potash fertilisers are made from. Processing 15,000 tonnes of cement dust per year from the Vassiliko plant, the estimated potassium yield is 3,000 tonnes of potassium chloride plus 1,500 tonnes of potassium sulphate. That already covers ~40% of Cyprus’s potash needs. And that is only from the waste of one plant.
The potassium for which the island pays in foreign currency literally sits in the landfill next to the kiln. Cyprus purchases about 17,000 tonnes of mineral fertilisers annually, of which potash accounts for 7,000 at a cost of €2.3 mln at today’s prices, plus 8,000 tonnes of nitrogen-phosphorus fertilisers at ~€400/t. In total, this costs the country ~€5.5 mln. 40% of that money no longer paid means savings — which means profit. Producing fertilisers on the spot in Vassiliko also eliminates delivery costs, duties, and dependence on suppliers.
The solution exists
The company Global Aqua Norma Ltd (Limassol) together with the American Strategic Research Institute ARBOK (NY) has developed the ARBOK-Scrubber technology: all the dust generated in the kiln bypass duct can be washed with fresh water followed by vacuum separation. The dust is captured by water rather than fabric filters — so the fine aerosol does not escape into the atmosphere. Exactly what was needed. Next — the slurry of dust and water enters a deep-vacuum chamber. No heating, at ambient temperature. The water evaporates and condenses clean, returning to circulation. Its purity — practically 100%. The water is filled once — and that matters for Cyprus. The dissolved solids exit the unit dry and dechlorinated — and return to the kiln as raw material. The same raw material for the cement plant. That means savings, lower costs and lower selling prices. But the dust also contained other chemical elements and their salts. In the same vacuum they crystallise fractionally and exit the unit separated: potassium chloride, potassium sulphate, table salt. The heavy metals also come out separated — lead, cadmium, thallium. None of them fly into the air causing asthma — instead they are obtained as concentrates for which there is enormous demand worldwide. Some of them are needed by Vassiliko itself.
ARBOK units are planned to be manufactured in Limassol. They have no membranes, use no chemical reagents, use no consumables whatsoever. No wastewater, no secondary sludge, no dust, no smoke. 100% clean production. A module is a 20-foot container processing 200 tonnes of water flow per day. Vassiliko would need only 2–3 such containers.
Everyone will think there must be a catch, because it all sounds too good. I’m sorry to disappoint you — there is no catch. The units, not only for desalination brine processing, have passed every kind of test by Cyprus state laboratories — AIK, WDD, the chemical quality laboratories in Aradippou — and confirmed these data, as well as that 1 tonne of water requires just 0.7 kWh of electricity — 3 times less than your kitchen kettle. That is all.
Now count. No landfill costs — €0.9 mln. No kiln downtime — €0.7 mln. Raw material returns to the kiln — €0.1 mln. Closed-loop water, no buying at €1.5 per tonne — €0.2 mln. Potassium chloride for sale — €1.0 mln, potassium sulphate — €0.9 mln. Table salt — €0.04 mln. Thallium, lead and cadmium concentrates — €1.1–1.5 mln: thallium in bypass dust is enriched hundreds of times and costs $9,300 per kilogram. Emission quotas now go to trading — 3–5 mln €/year. Total — €8–10 mln of revenue per year from what yesterday was a loss. And yes, subtract the 50 mln € fine for air pollution. That comes to nearly €60 mln! For our island — an excellent sum!
ARBOK turns what used to be classified as “hazardous waste,” for which the country pays a fine by order of the European Court, into 3 revenue streams: potash fertilisers, cement raw material, metal concentrates. The payback on such equipment — which needs no land allocation, no permits, no design, no walls and roof, no additional power line — is just 5–7 years, which is the accepted standard for industry.
Scale
Globally, cement kiln dust amounts to 700 mln tonnes per year. At 3% K₂O that means ~33 mln tonnes of KCl equivalent — half the world’s potash consumption. In the USA — 12.9 mln tonnes of CKD per year; landfill disposal costs — ~$200 mln/year.
Cyprus is not the only island that imports 100% of its potash. But Cyprus is one of the few where the solution literally stands at arm’s length.
Why here
ARBOK has a subsidiary in Cyprus — GLOBAL AQUA NORMA. The company works with desalination plant brines and is a repeat winner of AIK (Electricity Authority of Cyprus) and WDD (Water Development Department) tenders. Cyprus desalinates 80% of its drinking water — 245,000 m³ per day. Specialists who know local conditions are on the ground.
What is needed is support from business and the authorities. Not subsidies — resolve. So that people in Limassol, Larnaca and Paphos breathe clean air. So that Cypriot farmers get potash from their own waste, not from across the sea. So that 50 mln € in fines remains a threat and not a bill.
The technology is ready. The raw material is right here. All that remains is the decision.
Dr. Michael Vischmidt
Arbok Institute, Director
Also published on: LinkedIn — Michael Vischmidt · Facebook — ARBOK Institute
