Galvanic Sludge and Acid. Part 2. ❌ Status: we already wrote about galvanic waste recovery and got a wave of feedback. Galvanic wastewater treatment is outdated and needs a different approach. Chrome plating, nickel plating, etching…

Galvanic Sludge and Acid. Part 2.

❌ Status: we already wrote about galvanic waste recovery and got a wave of feedback. Galvanic wastewater treatment is outdated and needs a different approach.

Chrome plating, nickel plating, etching and passivation all run on acid and metal-salt solutions. The standard scheme: chemical precipitation binds the metal into a toxic sludge, then buries it. Treatment is formal; the resource is lost in practice.

❌ The plant carries 4 cost lines: reagents, rinse water, hauling and burial of the sludge, and the metal itself — lost instead of returning to the cycle.

❌ Facts: at least 1-3% of nickel and 5-10% of chromium processed ends up in liquid effluent at the hydrometallurgy and etching stage.

→ Worldwide: 40,000-100,000 tons of nickel and 200,000-400,000 tons of chromium compounds a year, dissolved as sulfates and chlorides — much of it toxic Cr(VI).

→ Removing 1 kg of nickel or chromium from wastewater costs $5-20, depending on concentration and regulations.

→ In the US, nickel and chromium losses in industrial effluent are estimated at 25,000-40,000 tons/year.

APPLICATIONS: electroplating, PCB manufacturing, photochemistry, leather tanning, metalworking — same reagent scheme everywhere.

🟢 ARBOK solved this problem too.

ARBOK-GALVANIX — vacuum-driven physical separation of the effluent at ambient temperature. No reagents, no filters, no membranes. Only up to 1 kWh/m³ of electricity.

🟢 How it works:

Galvanic effluent is fed under vacuum:

→ water evaporates at ambient temperature, returns to production clean, to spec

→ dissolved metals and salts settle in density layers — nickel separately, chromium separately — as a dry, non-toxic concentrate

→ no reagent needed — the metal separates from water physically, not chemically, and becomes a product, not trash.

Wastewater discharge — 0%. Process-water use drops 85-90%.

🟢 Economics.

Before: reagents + rinse water + hauling and burial + the lost metal, bought back on the market as scarce raw material.

After: $0 reagents, water returns to the loop, dry separated non-toxic concentrates instead of toxic sludge, no disposal, no fines.

→ US: at 25,000-40,000 tons/year of Ni and Cr losses and a removal cost of $5-20/kg — $125-800 mln/year goes to treatment and burial instead of returning the metal to the cycle.

→ World: 40,000-100,000 tons of nickel and 200,000-400,000 tons of chromium compounds a year on the same logic — $1.2-10 bln/year.

🟢 Arbok’s business model

Off-take/BOOM on the water and metal concentrates — module installs into the treatment circuit without stopping the line, paid per volume of effluent, payback 5-7 years.

🟢 Bottom line: galvanic sludge with Arbok is not shop waste — it’s marketable nickel and chromium turning a plant’s losses into revenue. Zero Waste Discharge in action.