Green concrete, electroconcrete, graphene-like materials, and two complementary space-energy systems
The Moon is covered in regolith — abrasive dust with 60–80 μm particles, lying in layers from meters to tens of meters deep. Its composition is basalt and anorthosite: Si, Al, Ca, Mg, and 15–18% FeO. There’s no water and no atmosphere, and the temperature swing between the lit and dark sides reaches 290 °C. Under the surface there are lava tubes up to hundreds of meters in diameter, with a stable ≈−20 °C inside and no radiation or micrometeorites. At the poles, in permanently shadowed craters, there’s water ice — hundreds of millions of tons, some of it carrying tritium and light isotopes from the solar wind.
💸 Delivery from Earth costs about a million dollars per kilogram to the lunar surface. The working material is only one: whatever lies under your feet.
🏗️ The global trend is single: sintering regolith at 1100–1200 °C with layer-by-layer 3D printing. NASA and ESA run such programs. China is preparing an experimental sintered brick for the Chang’e-8 mission in 2028. Singapore is working on a chitin-regolith composite in the lab. SpaceX isn’t involved in lunar construction. The whole market is moving in one direction — melting regolith into ceramics.
⚠️ This approach has two weak spots:
Energy. 1.5–2 GJ of heat per cubic meter of sintered regolith — that’s 20–25 kW of concentrated solar flux running continuously for an hour per cubic meter. Properties: 20–40 MPa in compression, nearly zero in tension. Brittle ceramic.
Environment. Lunar cycle: 14 days plus, 14 minus, 290 °C swing and no atmosphere to buffer it. Ceramics crack, and for a pressurized volume any crack is a leak.
🧱 ARBOK offers an alternative on the same regolith. Alkali-activated aluminosilicate binders: a silicate powder is treated with alkali and becomes a stone-like material — no clinker, no high temperatures. The technology has been known for over 70 years as ‘geopolymer’; ARBOK’s Green Concrete formulation is a validated prototype at a high readiness level.
Compressive strength up to 90 MPa (vibro-cast), 60 MPa (vibro-pressed). Tensile strength 4–8 MPa — which sintered regolith essentially lacks, and which is exactly what allows building pressurized volumes under internal pressure.
Frost resistance 75–100+ cycles, shrinkage 0.5–0.7 mm/m, adhesion 0.65 MPa. Curing at ambient temperature, no heating or autoclave. Energy use 0.05–0.1 GJ/m³ versus 1.5–2 GJ/m³ for sintering — an order of magnitude less.
A base for 20 people — 500–700 m³ of capital structures. Alkali path: 30–70 GJ. Sintering: 750–1400 GJ, roughly a thousand GJ per base.
⚡ A thousand GJ per year equals 32 kW of continuous power. On the lunar equator, day lasts 14 Earth days and night another 14, so this level needs 60–80 kW peak panels and 10–11 MWh of batteries — tens of tons of cells. The alkali path frees up those 30–40 kW for life support, communications, and science.
Mare regolith is close to terrestrial basalt in composition — silicon, aluminum, calcium, and iron (FeO 15–18% matters separately for radiation shielding, more on that below). For the alkali reaction what matters isn’t the exact composition but the Si/Al ratio and the fraction of amorphous glass phase. In regolith this phase is elevated by billions of years of impact metamorphism, and reactivity may even exceed that of terrestrial basalt. Under verification on serial simulants.
The activator is harder. Sodium content in regolith is only 0.3–0.5%; alkali must either be shipped from Earth or extracted from KREEP rocks. ARBOK’s working activator concentration is 3–5% of binder mass versus 8–12% in global practice — 2–3× less, thanks to proprietary formulation and process know-how. In numbers: at 2390 kg/m³ density and 20% binder fraction, that’s about 19 kg of activator per m³. Everything else is local regolith.
💧 Water is tougher. Wet formulations need about 150 liters per cubic meter. Polar extraction yields roughly 10 tons of water per day, and only 10–20% of that makes it to construction — the rest goes to life support, oxygen, and rocket fuel. So the main lunar route isn’t wet concrete but contact-condensation compositions from the same school: a silicate dispersion under press pressure condenses into water-resistant stone. 30+ MPa strength is reached within a few hours after pressing. The key lunar adaptation is a sealed pressing cycle under vacuum, because residual feedstock moisture is critical. Formulation adapts to basaltic regolith; the school is proven on terrestrial slags.
Vibropress plus minimal heating — and you have a finished block. Water goes only into the surface sealing layer formulation, 20–30 L/m³.
🔌 Electroconcrete — an ARBOK development, a conductive composite on the same matrix. A 0.5–2% carbon additive (ARBOK’s graphene-like powders), once past percolation, turns the material into a resistive heater and a distributed sensor. Operating temperature 40–60 °C, peaks 80–90 °C. It covers heating (floors and walls without pipes or coolant), monitoring (microcracks, water ingress, deformation — via resistance change), and anti-icing on external hatches. Thermal losses 5–10% versus 20–30% for pipe systems. On Earth — $60–100k per year per 10,000 m²; on the Moon — kilowatts you don’t have to ship.
☀️ Thermally Expanded Graphite Arbok (TEGA) is another ARBOK carbon material, and the corporation produces it at industrial scale — up to 1 ton per hour on a single line. Not lab-scale grams, but an industrial flow that doesn’t exist anywhere else on the market. On this material, ABBS is built — a full-spectrum absorption system close to an ideal black body. TEGA’s vermicular porous structure traps photons via multiple internal reflections: 99% absorption across UV–visible–IR versus 20–30% for silicon. The IR part of the solar flux in space is 49–52% — silicon doesn’t use it, TEGA takes it in full.
The second part of ABBS is ARBOK’s heat exchanger, which pulls flux from TEGA’s volume without local overheating; losses at this step are ≈10%. Of the 1366 W/m² at the input, about 1190 W/m² of usable thermal flux remains after absorption and heat transfer. Total ABBS yield — 900–1100+ W/m²: electricity plus process heat (life support, water regeneration, regolith pre-heat). Electric share: 5–30% depending on converter (thermoelectrics at the low end, Stirling at the top), i.e., 45–330 W/m². The key advantage is 99% absorption and full utilization of thermal flux. Silicon, out of 1366 W/m², produces 250–300 W/m² of electricity and dumps the remaining 1000+ W/m² into a radiator; ABBS uses it. This isn’t ‘3–4× more’ — it’s full utilization versus partial. Mass 1–3 kg/m² versus 10–20 for silicon, lifetime 25–50+ years versus 5–10. For an orbital complex with a 30,000 kg solar system, the TEGA equivalent is 500–1000 kg, saving $58–290 million on launch at $2,000–10,000/kg. Material cost ~$50/kg, output 5,000–8,000 m² per day from a single line.
Any direct solar absorption system — ABBS, PV panels, collectors — shares one limit: it works only while the Sun is visible. On the lunar equator, night lasts 14 days and every photo-system goes silent at the same time. The classic answer — batteries for 336 hours — runs into tens of tons of cells. The ceiling of ‘one technology for everything’ is a time-averaged efficiency no higher than 40–45% with charge-discharge losses.
📡 Another ARBOK solution — Arbok Radio-Voltaic (RV). Energy is harvested not from the light spectrum but from the radio-frequency spectrum of solar emission, plus the radio background of solar wind and the galaxy. Radio waves bypass obstacles and arrive from multiple directions, so RV is insensitive to Sun orientation, dust cover, and local shadows. On the Moon’s lit side and in any orbit with line-of-sight to the Sun — steady harvest. During the 14-day night the direct solar radio flux is gone, and RV runs at reduced output on galactic background. For a full cycle — a buffer or polar siting.
The construction is a film. A photo-printed array of microstrip resonators is deposited on a polymer substrate, each resonator tuned to its own radio band. Parallel layered assembly scales power by area and by layers.
An RV panel of hundreds of m² weighs tens to hundreds of grams against 10–20 kg/m² for space silicon — thousands of times less. Experimentally on Earth, ARBOK has confirmed 5% efficiency on a 15×15 cm element; a single circuit costs less than a cent, and form factor is arbitrary — from unrolled film to rolls. Thanks to independence from orientation and dust, the daily harvest on the lit side is comparable to an equivalent-area silicon panel once its downtime is counted. In a roll configuration (a cylinder about 1×1 m) the film delivers around 1.5 kWh at very low weight. The technology was designed for space: no atmospheric or weather losses, no ionospheric filtering, no Doppler distortion — target figures are several times higher than on Earth and will be refined through orbital validation. The film needs no glass, is insensitive to dust, and has no aging degradation.
ABBS and RV are a pair, not alternatives. ABBS takes up to 1000 W/m² of daytime flux; RV picks up the radio-frequency range at ultra-light mass and without dependence on orientation or dust. The architecture needs neither megawatt solar wings with drives nor batteries comparable in mass to the module itself. During the 14-day night both run at reduced output: ABBS from the thermal reserve stored in the wall mass, RV from residual radio background. Full coverage — a buffer or polar siting. Both systems are ARBOK know-how.
🛡️ Radiation shielding comes as a side effect of the chemistry — no lead required. The main threat on the Moon is galactic cosmic rays (GCR, protons 0.1–10 GeV) and solar energetic particles (SEP). What matters for them is the wall’s mass thickness in g/cm² and the content of light elements (oxygen, silicon) that slow primary protons. The iron in regolith (15–18% FeO) quenches secondary X-rays inside the wall. Independent studies show that geopolymer blocks on iron-rich volcanic material outperform ordinary concrete in secondary interception; regolith on a basaltic base falls into the same zone. Plus ARBOK’s foamed borosilicates — a lightweight refractory filler with boron that suppresses secondary neutrons. The value of geopolymer is that shielding and load-bearing function sit in the same material — something lead cannot do.
🎯 ARBOK’s integrated position differs from the market at the level of the stack. Sintering proponents put one material under structural load; everything else — heating, sensors, energy, radiation shielding, thermal insulation — is a separate subsystem, and each one ships from Earth. ARBOK’s portfolio covers five functions through recipe variations:
binder for load-bearing structures;
conductive layer (electroconcrete) for heating and monitoring;
foamed filler for thermal insulation and neutron shielding;
TEGA absorber (ABBS) for peak daytime energy harvest;
Radio-Voltaic film for broadband radio-frequency harvest.
Input — a single process loop. Output — five functional solutions. On total lunar-base mass, that’s an order-of-magnitude saving.
📋 Where’s the catch? ARBOK has no NASA-scale budgets, no thermal-vacuum test ranges, and no real regolith samples — and the corporation does not claim that status. What it does have is a set of concept-level solutions on a shared platform, partially realized as prototypes with measured parameters: Green Concrete applies serially on Earth, electroconcrete additives are validated, TEGA is produced at industrial scale, and RV is confirmed on a proof-of-concept built from ordinary radio components. Lunar numbers, until they are tested on regolith simulants in a thermal vacuum, are calculated estimates — and that is stated openly. To move the package into lunar readiness takes the resources of a single serious R&D program, not a national space effort.
Thermal-vacuum behavior at −170 to +120 °C and 10⁻⁶ mbar is measured separately: terrestrial 100-cycle frost resistance doesn’t automatically translate to the lunar environment. Curing at polar −40 °C requires formulation adjustment. Electroconcrete and the external ABBS loop degrade along the geopolymer matrix above 60–80 °C, so external thermal cycling needs either sub-surface placement or a ceramic shell. Work is ongoing.
💡 There is an open niche in the global portfolio of lunar construction technologies — alkali-activated binders as a main track, not a backup. It’s a class with a half-century scientific record, proven terrestrial formulations, and confirmed radiation shielding. Regolith fits this mechanism. The contact-condensation variant bypasses the water-and-vacuum problem. Electroconcrete covers heating and monitoring; foamed borosilicates take care of secondary radiation. Energy is carried by the ABBS + RV pair: ABBS fully utilizes the daytime flux where silicon only works in a narrow window; RV captures the radio-frequency range at thousands of times less mass, unaffected by orientation or dust. Coverage of the 14-day night — a buffer or a polar site. All of this sits on a single ARBOK platform.
⏳ The Artemis and ILRS program window closes by the early 2030s; the decision on permanent lunar infrastructure is due in the next 2–4 years. After that, market entry will cost an order of magnitude more. ARBOK is open to joint R&D, technology partnerships, and licensing — m.vischmidt@arbok.tech.
===
ARBOK always takes a different path 🚀 This is not positioning. It is a working philosophy. Competing with established, traditional solutions is a dead end. They already exist, they are optimized for their own logic, and entering that field means playing by чужим правилам. ARBOK does not play that game.
Humanity has already occupied the planet 🌍. Land is mapped. Resources are divided. Growth is constrained. Two domains remain structurally open: the underwater world and space 🌌. In space, the first practical target is the Moon 🌕. The Artemis II flight was not symbolic. It is reconnaissance. The task is simple: locate accessible water deposits that cannot be delivered from Earth at any realistic cost.
Water on the Moon is not just water 💧. It is infrastructure. It is mass. It is shielding. It is chemistry. Classical logic says: split water → get hydrogen → use it as fuel. This is the standard approach. It is widely accepted. It is also inefficient in a closed system where every kWh and every kilogram matters. ARBOK takes a different position ⚙️. Water is not a consumable. It is a structural element in a broader system where energy, materials, and environment are treated as a single loop.
What works on Earth does not transfer directly to space 🛰️. Gravity is different. Heat transfer behaves differently. Vacuum is not a constraint — it is a resource. Logistics dominate everything. Systems that look efficient on Earth become heavy, fragile, or energy-wasteful in orbit or on the lunar surface. That is where most current proposals fail: they scale Earth logic into an environment where it breaks.
The ARBOK team approaches this from another angle 🔬. The foundation was built decades ago, including work done during the Soviet era, when engineering was forced to solve problems under constraints, not comfort. That mindset remains: fewer assumptions, more physics. As a result, the approach is not a single technology. It is a system stack. At least 5 core technologies operate together, each replacing an entire class of conventional solutions. Not upgrades. Substitutions.
This creates a problem for presentation 📄. There is no simple narrative. The current article compresses multiple independent systems into one structure, which makes it dense and, in places, abrupt. That is the cost of describing a platform instead of a device. Still, for those who work in space construction, off-Earth resource utilization, or energy generation in extreme environments, the material is directly applicable.
The key point is simple. The future of lunar infrastructure will not be built by copying Earth ❌. It will be built by abandoning assumptions that only exist because Earth allows them. ARBOK is structured around that principle.
If you have practical proposals, engineering input, or deployment interest — engagement is open 🤝
Also published on: LinkedIn — Michael Vischmidt