In North Carolina, a planned 20 billion dollar AI data center has been cancelled after residents refused to back down and the county began debating a moratorium on such construction. It is one of the largest projects ever stopped by community opposition. And it is not an isolated case: in just three months of 2026, projects worth 130 billion dollars were blocked or delayed across 49 states, with longer-period estimates running to 170 billion. In North Carolina alone, more than 30 municipalities have paused new data centers over power, water and noise.
This is not technophobia and not a fight against progress. People simply calculated how much electricity and water the construction next door would take, and said no. For the first time, the industry has hit a wall that is neither technological nor financial. It has hit the limit of local consent.
The conclusion is simple: the next generation of computing machines will be defined not by performance, but by how much of a locality it consumes. ARBOK is developing a computing vertical built around exactly that condition.
⚠️ Why data centers became unacceptable
A modern data center is a building in which two thirds of the engineering complexity has nothing to do with computing. It draws megawatts, so it needs its own substation. It turns almost all consumed electricity into heat, so it needs cooling towers, chillers and water — thousands of cubic metres a day. It needs power, water and the neighbours’ permission. The first two are increasingly unavailable; the third is increasingly denied.
The cause runs deeper than cooling engineering. The carrier of logic in a processor is the electron moving through a silicon lattice. Joule heating is not a design flaw — it is the price of moving charge. Everything else (fans, chillers, cooling towers, water, the substation) is derivative of that single fact. As long as charge carries the logic, a data center remains a heat engine with a computer bolted to the side.
💡 Changing the carrier
The concept starts by changing the carrier of logic: compute with light, not with charge. The Institute is developing a fully optical digital computer based on light interference — with patented circuit design, working logic gates and functioning prototypes of its parts. The principle is called PCP, Photon Controls Photon. This is not optical transport layered on top of electronic processing; it is fully optical processing, where both transmission and computation are carried by light.
Parameters against silicon:
🚀 signal speed — 300 000 km/s versus under 6 000 km/s in electronics;
⏱️ switching delay for 1/0 — 0.0000001 ns versus 1 ns for a transistor;
📡 clock frequency — about 100 THz versus single-digit GHz;
❄️ heat output — below 0.0001 %, operating temperature about 0.1 °C instead of 100–200 °C;
💰 heat removal — 7 cents a day versus 7 dollars per rack;
🧱 no skin effect and no limit on layer count: 3D structures scale without bound.
The architectural core is the Digital Light Transistor: computation runs on phase, polarization and wavelength. Energy per switching event is on the order of 10⁻¹⁸ J against 10⁻¹² to 10⁻¹⁵ J for current silicon logic — an energy-efficiency gain of up to 10 000 times per logical operation. Switching time is 0.1–1 ps. Thermal output is zero. The logic is not only binary but multivalued.
For the permitting question, one point matters above all: a machine that warms by 0.1 °C needs no cooling towers, no chillers and no water for evaporative cooling. Nor does it need dedicated energy infrastructure — it runs off a standard industrial supply. What disappears is not a part of data center engineering but the larger half of it, together with both of the reasons projects are being stopped.
The material platform is silicon photonics on mature 120–180 nm process nodes. This is not a race for the most expensive lithography on the planet, nor a queue at a handful of fabs: lines of that class exist and are underloaded.
⚡ Its own power, not someone else’s substation
The first constraint is removed not by economy but by owning generation. LONG BATTERY is an autonomous power platform running on water: cold hydrolysis splits water into hydrogen and oxygen with no combustion and no external fuel, the gases pass through cartridges in magnetic fields, and electromagnetic induction produces current; about 60 % of the hydrogen returns to fuel cells and adds output.
One 20-ft container occupying 15 m² delivers about 450 kW continuously — 250 kW from the base unit and 200 kW from the fuel cells, or 3.9 GWh per year. Cost of electricity is about 0.02 dollars per kWh against 0.20–0.30 euro per kWh from the grid. Noise is below 40 dB. The fuel is water of any quality — fresh, saline or reclaimed — at 0.5 m³ per MWh, three orders of magnitude less than the evaporative cooling of a conventional data center. By-products are roughly 71 000 kg of hydrogen and 570 000 kg of oxygen per unit per year. Service life exceeds 20 years with no cycle degradation. TRL 7: prototypes are built and running at pilot sites, delivered under a 15–20 year agreement in which the Institute finances, installs and maintains the plant while the customer pays per kilowatt-hour.
Scaling is linear: site capacity is built from the number of containers, not from the size of the grid connection. The site stops depending on whether the utility will grant a peak allocation.
🔋 Power is not energy
Even with generation of its own, peaks remain a question: computing load is uneven, and the peak sizes the entire power train.
This is where the EXTRACAPACITOR supercapacitor works. A battery stores energy; a supercapacitor holds power. These are different quantities and different devices. The construction is built on thermally expanded graphite Arbok of our own production: it conducts current better than copper on a specific basis, so the device contains no aluminium foil current collector — which in a classical supercapacitor accounts for 30–40 % of mass and stores no charge at all. Every gram of the construction stores energy.
Against a classical supercapacitor: specific capacitance 180–250 F/g versus 80–120 F/g, specific energy 30–40 Wh/kg versus 10–15 Wh/kg, self-discharge 5–8 % per day versus 20–25 %, cycle life 500 000 versus 100 000–300 000, batch consistency ±1–2 % versus ±10–15 %, so modules assemble without matching or balancing.
The effect is clearest on charging infrastructure: a buffer lets a 150 kW connection deliver a 400–500 kW peak. For a computing site the logic is identical — the buffer absorbs peaks and covers backup power, for which diesels and battery halls are kept today.
The raw material makes all of it possible. The Institute produces thermally expanded graphite Arbok at 99.98 % purity for 50 dollars per kg, against a market price of 10 000–15 000 dollars per kg for graphene-like powders of industrial purity. One line yields 7 200 t per year — twice the entire world graphene output from all producers in 2023.
📶 Less data, less energy
The fourth layer relieves the channel rather than the site. SuperCodec compresses any binary data losslessly — bit for bit, with instant restoration of the original, independently of the operating system. On a range of data the ratio is 2 times and above, and it grows because already-compressed data can be compressed again.
The algorithm is built not on searching for redundancy, as classical archivers are, but on replacing the data alphabet with a more compact one. File type and prior packing are therefore irrelevant: video, audio, encrypted containers, cryptographic keys and random data all compress. The benchmark file of one million random digits, traditionally considered incompressible in principle, has been compressed as well; the data before and after are identical.
For a data center this is direct savings: a significant share of energy goes not into computing but into moving and storing data. Fewer bits mean fewer cycles, less traffic, fewer disks. The same move removes the need to build new network generations for the sake of throughput.
🛡️ Security with no cloud and no added latency
The fifth layer is TrapSwitch, an autonomous hardware module the size of a credit card, installed inline between the network and the protected node with an ordinary Ethernet cable. It has no operating system, no drivers, no agents and no cloud dependency: its own processor, an integrated battery, firmware updated only with physical access. A fully compromised operating system on the protected node has no effect on it, and it cannot be switched off over the network. Against distributed attacks it uses not traffic filtering but dynamic change of the node’s digital identity, so the node becomes invisible to the botnet while legitimate traffic is rerouted. A passive full-logging mode is available for forensics.
This is the most mature layer of the concept: TRL 8–9, ready for deployment.
🎯 What this gives on site
Taken together, five layers describe a computing object of a different class. It needs no cooling towers and consumes no water for cooling. It needs no dedicated substation and is under no obligation to ask the utility for capacity at all: power comes from container-class water generation of its own, and peaks are held by the supercapacitor buffer. It runs on fibre already in the ground: time-division multiplexing at a clock of about 100 THz packs thousands of logical channels into a single fibre, up to 100 Tbit/s, and thousands of Tbit/s combined with wavelength multiplexing. It is manufactured on mature 120–180 nm photonic lines. And it is protected by a device that cannot be disabled remotely.
This changes the subject of the conversation with the territory. Today an argument about a data center is an argument about megawatts, cubic metres and the noise of cooling towers. An object that asks for none of the three drops out of that argument entirely — along with the moratoria, the hearings and the cancelled billions.
🔬 Next stage
The honest maturity map reads as follows. TrapSwitch — TRL 8–9, ready for deployment. LONG BATTERY — TRL 7, prototypes running, with operational data accumulation and independent verification ahead. SuperCodec — TRL 5–6, core working. Optical computer and Digital Light Transistor — TRL 4–5, first industrial prototype expected within 6–12 months. EXTRACAPACITOR — early series, with field testing under cold, heat, vibration and accelerated degradation still running for another 18–24 months.
The Institute is a research organization, not a factory, so the immediate task for every layer is the same: a serial manufacturing partner and a first reference site.
The industry today is solving the problem of where to find more energy and more water. We believe the problem is stated wrongly. The correct formulation is how to build a machine that needs neither.
Also published on: LinkedIn — Michael Vischmidt