24 MW FROM WASTE: THE ECONOMICS OF BARBARISM

A city of approximately 700,000 people generates around 1,000 tonnes of municipal solid waste every day. Direct incineration produces about 22 MW, pyrolysis produces around 15 MW, and hydrothermal carbonisation theoretically raises output to 24 MW.…

A city of approximately 700,000 people generates around 1,000 tonnes of municipal solid waste every day. Direct incineration produces about 22 MW, pyrolysis produces around 15 MW, and hydrothermal carbonisation theoretically raises output to 24 MW.

The same city consumes approximately 470 MW continuously. Burning all its waste therefore covers only around 5% of its electricity demand.

To obtain this 5%, the city destroys 365,000 tonnes of materials every year.

🗑️ WASTE IS NOT A MATERIAL

A waste container does not hold a single useless substance. It contains polymers, glass, ferrous and non-ferrous metals, paper, cardboard, batteries, electronics, rubber, textiles, wood, organic matter and minerals.

Mixing them does not make them worthless. It only makes separation more expensive.

In a civilised system, separation begins at home. Where households do not separate waste, robotic sorting lines must do it. Machine vision, spectral sensors, magnets and eddy-current separators can identify and recover valuable fractions from mixed waste.

Failure to organise sorting is not a technical justification for building a furnace.

The world generated around 2.5 billion tonnes of municipal waste in 2022. This may approach 4 billion tonnes by 2050. We are producing more waste while consuming the same finite materials from which it is made. In the XX century, mass burning looked convenient because resources appeared abundant and waste volumes were much lower. In the XXI century, destroying materials after a single use is no longer convenience. It is industrial wastefulness.

🔥 WHAT ACTUALLY BURNS?

Wet organic matter, glass and metals do not sustain combustion. The furnace temperature is maintained primarily by polymers, paper, textiles, wood and rubber. Polymers effectively become the fuel used to burn everything else.

In a representative 1,000-tonne daily waste stream, annual quantities may include approximately:

60,000 tonnes of polymers;

45,000 tonnes of paper and cardboard;

80,000 tonnes of food waste;

60,000 tonnes of rubber, leather and textiles;

120,000 tonnes of other materials.

The furnace consumes all 365,000 tonnes and produces around 22 MW, equivalent to approximately 190 GWh per year.

This is called “waste recovery.” In reality, it is resource destruction.

Polymers are manufactured from oil and gas. We spend energy extracting hydrocarbons, transporting them, refining them and manufacturing products. After a short period of use, those products are burned to recover only part of the energy already spent making them.

After incineration, the polymer cannot be recovered. What remains is flue gas, ash and the permanent cost of controlling pollutants.

Burning polymers to dispose of the rest of the waste is like heating a house by burning its furniture because separating wood, metal, glass and fabric requires effort.

♨️ HTC DOES NOT CREATE ENERGY

HTC means Hydrothermal Carbonisation. Wet material is processed in water at approximately 180–300°C and 2–10 MPa, producing hydrochar with higher energy density.

HTC does not create energy. It transfers part of the feedstock’s chemical energy into a solid carbon-rich product while also producing gaseous and contaminated aqueous phases.

The theoretical 24 MW output assumes around 325 tonnes of hydrochar per day, a calorific value of 20 MJ/kg and electrical efficiency of approximately 32%.

But 24 MW is the gross output from subsequently burning the hydrochar. It does not deduct reactor heating, pressurisation, pumps, product separation, dewatering, process-water treatment, pelletisation, storage or fuel handling.

HTC therefore appears to outperform direct incineration by only about 2 MW before its own energy consumption is deducted.

Integration with a coal-fired power station is not a simple fuel substitution. Hydrochar must be tested for grindability, feeding stability, ash composition, chlorine, sulphur, alkali metals and heavy metals. Corrosion, slagging, fouling and changed emissions may require new storage, feeding and environmental-control systems.

After all this processing, the final product still goes into a furnace.

⚙️ PYROLYSIS CHANGES THE FURNACE, NOT THE LOGIC

Pyrolysis produces approximately 165 tonnes of biochar per day and around 15 MW, or about 130 GWh annually.

This comparison remains incomplete because pyrolysis also produces gas and liquid fractions containing energy. Pyrolysis can make sense for specific separated materials with defined products and markets. Sending mixed municipal waste into it without first recovering metals, glass, batteries, electronics and recyclable polymers merely replaces one form of destruction with another.

Neither pyrolysis nor HTC removes the need for sorting. Both technologies work better with controlled feedstock. If the waste must be sorted anyway, burning the recovered polymers, paper, rubber and textiles becomes even harder to justify. Once separated, these fractions are no longer an anonymous fuel mixture. They are identifiable industrial materials with markets and alternative uses.

🤖 SORT FIRST. RECOVER EVERYTHING POSSIBLE.

Metals and glass must return to industry. Polymers should be separated by type and directed to mechanical or chemical recycling. Paper and cardboard should be recovered where fibre quality permits. Rubber can be shredded for surfaces, composites and construction materials. Batteries and electronics require dedicated metal-recovery chains.

Organic matter is also a resource. ARBOK-ZWD dewaters it without heating and produces clean water and dry organic chips, or DOC, with a calorific value of 14–22 MJ/kg.

DOC is comparable to lignite or commercial wood pellets. It can be stored, packaged and sold to households, boiler operators and thermal plants for around $250 per tonne.

Instead of paying to destroy organic waste, the city receives water and a marketable reserve fuel.

This creates several economic streams from the same 1,000 tonnes: metals, glass, recovered polymers, paper, rubber fractions, electronic materials, clean water and DOC. Their exact value depends on sorting quality and local prices, but the economic direction is clear. Incineration reduces these streams to electricity, ash and flue gas. Sorting converts one disposal expense into several inventories of saleable materials.

But if the city stops burning waste, where will it obtain the missing 5% of electricity?

💧 ELECTRICITY FROM WATER

ARBOK-LONGBATTERY, or ALB, separates electricity generation from waste destruction.

ALB is a modular continuous generator using water as its feedstock. It produces electricity, heat and oxygen without requiring waste, polymers, coal, gas, fuel oil, wind or sunlight.

One 20-foot ALB module provides approximately 1.5–2 MW continuously. Replacing a 22 MW incineration plant requires around 10–15 modules. Matching the theoretical 24 MW HTC output requires around 15–20 modules.

The complete installation occupies a small parking area rather than an industrial incineration site of up to 5 hectares.

Producing approximately 190 GWh requires around 100,000 m³ of water annually, or about 300 m³ per day. At $1 per m³, water costs around $100,000 per year: only $0.0005 per kWh.

ALB is also modular. A city does not need to build the entire capacity as one giant plant. Modules can be installed as demand grows, distributed near consumers and serviced individually. If one module stops, the remaining units continue operating. A large incinerator concentrates boilers, turbines, waste reception, combustion and flue-gas treatment into one industrial site. A serious outage can remove the entire 22 MW and interrupt waste reception at the same time.

🏭 THE HIDDEN ECONOMICS OF INCINERATION

The furnace is only the visible centre of a much larger system. Waste must be collected, transported, weighed, stored, mixed and continuously supplied. Combustion air, auxiliary burners, water treatment, emission-control chemicals, activated carbon and maintenance are required. Ash must be cooled, handled, tested, transported and finally stored or processed.

Incineration does not make 1,000 tonnes disappear. A substantial mineral residue remains after combustion. Therefore the city pays for waste collection, pays to construct the furnace, pays to operate it and then continues paying to handle what remains.

The plant also needs a guaranteed waste supply for decades to repay its investment. That creates a direct conflict with recycling. The more efficiently the city separates polymers, paper, rubber and other combustible materials, the less calorific fuel remains for the furnace. A waste-to-energy plant therefore depends economically on the continued production of the very waste the city officially claims it wants to reduce.

ALB has no such conflict. Recycling can increase, waste volumes can fall and material recovery can improve without reducing electricity generation.

💰 SAME POWER. DIFFERENT ECONOMICS.

The correct comparison is not “waste versus water.” It is 22 MW against the same 22 MW.

A 1,000-tonne-per-day waste-to-energy plant requires approximately $180 million in capital. An equivalent ALB installation represents around $55 million.

ALB therefore requires approximately $125 million less capital — a reduction of around 70%.

Under the ARBOK BOOM/PPA model, ARBOK finances, installs, operates and services ALB. The city’s initial investment is $0. The customer pays only for delivered electricity.

At equal output, ALB can reduce annual operating expenditure by approximately $10–25 million.

Over 25 years, both systems produce around 5 TWh. The incinerator consumes more than 9 million tonnes of mixed materials. ALB consumes around 2.5 million m³ of water.

Electricity from incineration costs approximately $570–800 million over this period. Equivalent ALB production costs around $240–570 million. The difference can reach approximately $550 million.

This comparison still excludes the value of recovered metals, glass, polymers, paper, rubber and electronics. It excludes revenue from DOC. It also excludes the value of heat and oxygen produced by ALB.

It also excludes the strategic difference between the systems. The incinerator converts resources into irreversible losses. ALB preserves the possibility of selling, recycling or storing those resources. One system closes economic options. The other multiplies them.

⚖️ THE VERDICT

Incineration produces around 22 MW by destroying 365,000 tonnes of resources every year.

HTC theoretically raises output to 24 MW but requires another industrial process and still ends in combustion.

Pyrolysis produces around 15 MW and still requires sorting before treatment.

ARBOK uses a different architecture: robotic systems separate waste, industry recovers the materials, ARBOK-ZWD converts organics into water and DOC, and ALB provides continuous electricity.

🔥 Incineration requires around $180 million before operation begins.

💧 ALB requires $0 from the customer under BOOM/PPA.

🔥 Incineration spends up to $27 million annually to destroy resources.

💧 ALB preserves those resources and can reduce annual operating costs by up to $25 million.

🔥 Incineration requires a permanent supply of combustible waste.

💧 ALB continues producing electricity even when recycling succeeds and waste volumes decline.

Burning polymers, paper, rubber and organics to provide only 5% of a city’s electricity is not an energy strategy. It is an admission that the city failed to organise modern sorting and recovery.

The old system forces a choice between 365,000 tonnes of resources and 22 MW.

ARBOK eliminates that choice: materials remain materials, and energy is produced separately.