Post

Perovskite Will Hit Pollucite, Not Instability

The world is busy counting efficiency. What it should be counting is cesium. Perovskite solar cells are sold as a new era in solar energy. But not everything new is good. The acidic self-assembled monolayers that…

The world is busy counting efficiency. What it should be counting is cesium.

Perovskite solar cells are sold as a new era in solar energy. But not everything new is good. The acidic self-assembled monolayers that spent years corroding adjacent layers have been replaced with neutral alkali-metal salts — and the winner was potassium. The interface stopped being aggressive, the layer became water-soluble, the tandem delivered more than 29%, and one of the world’s largest chemical companies has already geared up for commercialization.

This is good work. And it brings the industry’s bottleneck closer, not further away.

Because the stability of perovskite rests on cesium. And there is no cesium in the world.

📊 The arithmetic that does not appear in press releases

At 30% module efficiency, one terawatt of annual production is 3.33 billion m² of modules.

One GW of all-perovskite tandem requires:

cesium — 280 kg

indium for transparent electrodes — 4,419 kg

indium for interconnection layers — 288 kg

lead — 4,911 kg

iodine — 10,974 kg

silver — 3,496 kg

tin for FTO — 10,036 kg

For perovskite/silicon tandems: cesium 75 kg/GW, indium 1,875 kg/GW.

The world market for cesium products is around 2,200 t per year; primary production of cesium metal is 25–50 t per year. The fifty-fold spread is a diagnosis in itself: the industry does not know how much cesium there is, because there is too little of it.

The explanation: cesium formate drilling fluids are leased and returned for reprocessing, not consumed, so turnover exceeds primary production many times over. But perovskite needs new cesium — the kind that goes into a module and leaves circulation for 25 years. At terawatt scale the fleet would lock up 24,200 t: 12.1% of world reserves. Where do we get it? From Mars?

At 20% cesium in the A-site, the entire world primary production is consumed by roughly 90 GW of modules per year — against a global photovoltaic market of about 706 GW in 2025. Perovskite only has to take 13% of the market to zero out the world’s cesium supply. For indium the threshold is 219 GW against world production of 968 t.

🧪 Why cesium cannot simply be removed

The industry’s standard answer is cesium-free compositions. It fails for the reason cesium got there in the first place: with its small ionic radius and no organic component, cesium holds the lattice against heat and humidity. It is the very stability resource the KTU work was written for. Remove it and the problem just solved comes back.

The sensitivity analysis is blunt: even at 1% cesium, terawatt-scale demand is 58% of world primary production. Not 1%. 58%. Cutting the concentration twenty-fold postpones the problem, it does not remove it.

🔒 A shortage that nature did not create

Cesium is rare, but not so rare that there should not be enough. Crustal abundance is 3 ppm, comparable to tin. But it is a large-ion lithophile element: it crystallizes in only a few minerals and stays dispersed in the rest. Industrial cesium comes from pollucite, a mineral of rare granitic pegmatites — a handful of deposits worldwide.

About 85% of world reserves of cesium and rubidium sit in Canada, Zimbabwe and China, and more than 70% of supply is controlled by Sinomine, which owns Canada’s Tanco and Zimbabwe’s Bikita. Even North American raw material is in fact Chinese; the US has been 100% import-dependent since 2019. An industry building the West’s energy independence intends to build it on a metal distributed worse than the rare earths.

💧 Where the cesium actually lies

It is dissolved in the waters already being pumped for a different metal. The geothermal brine of the Salton Sea in California holds about 20 mg/L of cesium (up to 170 mg/L in places) and about 110 mg/L of rubidium — roughly 340,000 t of cesium and 1.88 million t of rubidium for that field alone. A full-scale deposit, already raised to the surface. The second category is the oilfield brines of the Smackover Formation in Arkansas and East Texas, already developed for lithium and bromine.

And here is the absurdity. These brines are pumped right now for lithium, and direct lithium extraction targets one ion. The lithium is taken; the depleted brine with its cesium and rubidium goes back into the formation. The cheapest component comes out, the ones worth many times more go back underground — the ones the US cannot get anywhere except China.

One cubic meter of Salton Sea brine yields about $12 of lithium, $180 of rubidium and $60 of cesium: rubidium and cesium together are 15–20 times the value of the lithium in the same water.

📉 Indium: same plot, different metal

Indium mines do not exist. About 95% of refined indium is a byproduct of zinc, so supply is inelastic by definition. China refines about 70%, export licensing came in February 2025, the US produces none, and by 2026 the price hit roughly $1,000/kg — a decade high.

Meanwhile indium is dissolved in the acid mine waters of US ore districts at 6–29 µg/L, 10,000 times the river background. And in standard neutralization, at pH above 8, more than 99% of it precipitates and goes to burial with the sludge. The country pays to treat the effluent and thereby loses the metal it imports.

⚙️ What does ARBOK have to do with it?

Sorption, osmosis and extraction work inside the water: reagents, membranes and filters for a narrow group of ions, the rest returned as brine.

ARBOK ZWD works differently — with the stream as a whole. In a single pass the water is purified and the salts separated from it. The dry residue is then split by density, which differs noticeably between lithium, rubidium, cesium and sodium. The same for indium: its compounds differ sharply in density from the iron, zinc, aluminium and sulfates of the bulk effluent.

Applying ZWD to the geothermal brines of California and the oilfield brines of Arkansas and East Texas would supply the perovskite project with both cesium and indium at very moderate prices — enough to make it considerably more attractive economically.

From the ARBOK base: up to 99.9% of the water returned clean, 85–90% of dissolved substances recovered, 0.72 kWh/m³ as the only cost item, deep vacuum of about 1 kPa at 6–40 °C, container-class hardware, 15–20 years of service, zero liquid discharge.

Sorption and osmosis reach only dissolved ions. Indium is capricious: in acid effluent it is dissolved, but as the pH rises it goes almost entirely into suspension. ARBOK concentrates the whole stream, so the form of the metal is irrelevant.

And the economics: cesium and indium cost nothing here. The unit is paid for by water and table salt; the critical metal comes along the way, at zero marginal cost.

🏭 The third loop: the perovskite factory itself

Perovskite production is wet by nature: precursor solutions, wash waters, spent solvents, tooling rinses. Organic solvents alone require 7 mL/m² — 23,300 m³ per terawatt — and condensation recovery delivers 71% at best. The rest is a liquid stream in which lead, iodine, indium and cesium are already dissolved.

RoHS limits lead to 0.1% by mass in a homogeneous material; the perovskite layer with its transport layers gives about 0.55% — a fivefold exceedance. WEEE already covers photovoltaic modules: landfill ban, mandatory collection, producer responsibility. The manufacturer must close the lead question regardless of economics; indium and cesium from the same stream pay for it.

At end of life the grades are: indium 121 g/t, iodine 300 g/t, lead 134 g/t, silver 95 g/t for a glass-glass module; indium 1,327 g/t for a flexible module on foil. In sphalerite indium runs 10–100 g/t and is recovered economically as a byproduct. Here it is an order of magnitude higher, in a known composition, with no overburden and no crushing of rock.

🎯 The choice

The industry is competing over tenths of a percent: 35.5% for perovskite/silicon tandems, 30.3% for all-perovskite. Every record brings closer the moment when production runs up not against physics, but against pollucite.

There are two ways to meet it. The first: wait until the price of cesium makes perovskite unprofitable, then explain to investors that the Chinese supplier is to blame.

The second: start taking cesium, rubidium and indium from where they are already dissolved and already at the surface — geothermal brines, acid mine waters, the effluents of your own plants.

The next race for critical metals will be won not by whoever digs deepest. Indium cannot be dug at all. It will be won by whoever stops pouring it into the river.

And of course there is a third option… Abandon perovskite in favour of ARBOK’s TEGA panels, which run 24 hours a day at 80% efficiency. No cesium, no indium — only graphene and a few ideas.

👉 Working with geothermal brines, mine waters or photovoltaic production effluents? Message me — ARBOK runs pilot tracks in 4 countries.

— Dr. Michael W. Vischmidt, Founder & Director, ARBOK Institute

🌐 arbok.tech

SOURCES

Yang et al. Neutralized self-assembled monolayers based on alkali metal phosphonate salts for inverted perovskite solar cells. Nature Communications, 2026. DOI 10.1038/s41467-026-74288-2. Press release of Kaunas University of Technology, 12 August 2026.

Wagner L., Suo J., Yang B., Bogachuk D., Gervais E., Pietzcker R., Gassmann A., Goldschmidt J. C. The Resource Demand of Terawatt-Scale Perovskite Tandem Photovoltaics. arXiv:2306.13375 (published in Joule, 2024) — Tables 1, S1, S6, S7, S12, S13.

ARBOK internal calculation based on the above: conversion of t/TW into kg/GW, threshold production volumes, end-of-life grades in g/t. Assumptions: 3.33 million m² per GW at 30% efficiency; module mass 11 kg/m² for glass-glass and 1 kg/m² for flexible foil.

ITRPV / pv magazine, 2026 — 706 GW of module shipments in 2025. LONGi, July 2026, ESTI-certified 35.5%. NIMTE CAS, 2026 — certified 30.3% all-perovskite tandem. USGS Mineral Commodity Summaries (cesium, indium); USGS critical minerals list.

Directive 2011/65/EU (RoHS); Directive 2012/19/EU (WEEE); EN 50625 series. Assessing the Regulatory Requirements of Lead-Based Perovskite Photovoltaics, Joule, 2020. Circular economy for perovskite solar cells, Energy & Environmental Science, 2023.

ARBOK base: Cesium_Rubidium_EN.docx, Indium_EN.docx, Lithium_Rubidium_Cesium_EN-2.0.docx, ARBOK-Cesium-Rubidium.md, ARBOK preprint DOI 10.5281/zenodo.20958282.


Also published on: LinkedIn — Michael Vischmidt