Why do they remain untouched? Because with conventional technologies, projects like these are simply not economically viable. Moreover come bureaucracy, public procurement procedures, endless documentation, public consultations, and increasingly restrictive regulations kill any initiatives.
All of that is understandable. But the result is obvious: hundreds and thousands of abandoned waste piles around the world that we continue to call “waste” out of habit, even though many of them are valuable mineral resources waiting to be recovered. Just look at gypsum-phosphate “white mountains” like that in Florida – almost 1 BILLION TONS!
This project demonstrates that solving the problem is not the difficult part. The real question is whether we are willing to replace obsolete thinking with better technology.
Take a close look at the numbers.
Read our publications. Consider them a message from the future, showing how materials that 20th-century technologies, such as reverse osmosis, failed to process economically can now be transformed into valuable resources.
I would appreciate a repost. It will not generate advertising revenue, and this is certainly not TikTok. But it may help the right person discover exactly what they have been searching for.
Let’s help each other.
===
Salt Mountain as an Unclaimed Deposit: What Monte Kali Teaches Us
🧂💧 In the German state of Hesse stands a mountain that appears on no geological map. It rises more than 250 m above the plain, its summit 520 m above sea level, and it weighs about 200 million tonnes. Every hour it grows by another 900 tonnes. This is Monte Kali, the largest artificial salt heap in the world; it has been rising beside the town of Heringen since 1976. Locals nicknamed it “Kalimanjaro.” I see it differently: 200 million tonnes of raw material that someone once mistakenly called waste — and keeps calling waste today.
🌱 The mountain is a by-product of potash mining. Potassium is the second pillar of plant nutrition after nitrogen: without it a crop cannot hold water, move sugars, or withstand stress. In an era of acute fertilizer shortage and disrupted imports from Belarus or Russia, local production is independence.
🪨 Raw ore contains only 20–35% potassium; the rest is ballast, above all sodium chloride. Every tonne of useful potassium leaves on average 3–4 tonnes of salt waste.
🏭 The Werra plant of K+S processes about 20 million tonnes of crude salt a year, and around 7.2 million tonnes a year go straight to the heap. 900 tonnes an hour is the rate at which both Kalimanjaro and the Werra river fill with waste.
⚗️ What exactly is mined at Werra? The feedstock is “hard salt,” a mixture of four minerals: halite (NaCl), sylvite (KCl), kieserite (MgSO₄·H₂O) and carnallite (KCl·MgCl₂·6H₂O), with anhydrite and clay. From it they extract what the whole effort is for: potassium chloride as the main fertilizer, potassium sulphate for chloride-free blends, magnesium products such as kieserite and Patentkali. Potassium goes into bags. Sodium and excess magnesium go to waste — solid to the mountain, liquid to a concentrated and therefore toxic brine. The whole economic drama of Heringen is in that split: a small useful fraction, and then two wastes, solid and liquid, which are in fact what industry never learned to sell and keeps burying.
💧 But the real problem of Heringen is not the solid mountain. At least it is visible. The real problem is the liquid. Wet processing of the ore produces a highly mineralized effluent — brine. According to the official document of the Regierungspräsidium Kassel, this is a solution with total mineralization of about 400 g/L, dominated by magnesium chloride: MgCl₂ — 270–310 g/L, plus KCl (25–60 g/L), MgSO₄ (30–50 g/L) and NaCl (20–40 g/L). Magnesium is the main “problem” salt: MgCl₂ is hygroscopic and hard to crystallize, so it stays in the water, not in the mountain. About 5 million m³ of this brine forms each year. Part is discharged into the Werra, part used to be injected underground.
⚠️ The consequences — chloride in the Werra historically reached 40 g/L. Of the 60–100 species of local invertebrates, about 3 remain. Around the heap almost nothing grows except salt-tolerant halophytes; salt seeps into soil and groundwater. For decades local residents have worried about agriculture and drinking water.
🎯 And here begins the most important part — why this case reaches far beyond one German town.
⏳ K+S faces a burning deadline. The permit to discharge effluent into the Werra is valid only until the end of 2027. Storing solid salt is allowed until 2030. The fallback — burying brine in the Springen mine in Thuringia — was rejected by the authorities after years of review. The company gave up underground injection back in late 2021 under public pressure. In other words, one of Europe’s largest potash producers is running out of the right to dispose of its own waste, and has no approved plan B. At stake — about 4,400 jobs at the site itself, another 3,000 at suppliers, and in total around 16,000 people whose livelihood in the region depends on potash.
🔬 Why have existing technologies failed to solve this for half a century? Because they are built on the wrong physics, and unwisely.
📉 Reverse osmosis (RO) and thermal schemes (MVR, MEE) are 1970s–1980s architecture: membranes, high pressure up to 80 atm, chemistry, a great deal of electricity, heat, reagents. All of it expensive. Old systems desalinate poorly. Membranes foul fast, equipment rusts fast, the cost is extremely high. Yes, MVR and MEE do extract clean water from brine, but 70% of the incoming stream comes back as an even more concentrated brine that again has to go somewhere. On brine at 400 g/L a membrane simply stalls: osmotic pressure is too high, membranes scale and fail. Thermal evaporation of such a volume devours energy. So real industry never took that path — it chose the cheapest thing there is: dump the solid on the surface and pour the liquid into the river. Monte Kali is a monument not to engineering genius but to the absence of an alternative. If this were somewhere in Africa, perhaps no one would talk about it — but Hesse is in Germany, and that is not Africa.
✅ In fact an alternative exists. And it can fully solve the task even within the tight deadlines.
♻️ The ARBOK ZWD (Zero Waste Discharge) technology is designed for exactly this kind of task. It has proven itself in treating phosphate waste and red-mud waste from aluminium plants. ZWD is not simple membrane desalination, which is completely unsuitable here. ARBOK is a deep-vacuum phase-separation technology — “cold evaporation.” The process runs under deep vacuum at near-room temperature (6–40 °C), without membranes, without heating, without reagents, without coagulants, without cavitation, anodes or other 20th-century tricks. Specific energy is about 0.7 kWh per m³ of stream, independent of brine density. Heat recovery of the process reaches 98%. Water recovery — up to 99.98%. The water comes out clean and can safely be released into the Werra or used for irrigation.
🔁 The key difference is a closed material balance: zero liquid tails, zero discharge. The system does not separate “useful” water from “harmful” concentrate. It takes the stream apart entirely: clean water separately, salts in dry form separated by fraction, each poured into its own container or big bag. What used to be a poisonous, toxic waste and a useless concentrate requiring harmful burial becomes a list of commercial products.
⚖️ Compare two logics. One architecture pulls out the wanted product, generates solid salts and a liquid salt concentrate — brine — and hauls both to burial; the other separates every component from one another and produces no solid or liquid waste at all.
🛡️ For a plant whose permit is expiring and everything is on fire, this is not just a chance — it is a complete solution to a problem more than 100 years old. No discharge into the river — no permit war, no fines, no reputational risk.
🏔️ But eliminating discharge is only half the story. The other half is utilizing the mountain. Yes, yes. Even if you process all the liquid effluent, something must be done with the solid too. Rain and snow will keep dragging the salt across the whole area, killing it.
🔧 ARBOK units should be integrated into the existing system. Salt from the mountain is dissolved in water; this brine, at a maximum concentration of 35%, is fed into the ARBOK units, and out comes clean water again and separated salts. Clean water no longer has to be taken from the Werra — the separated water becomes recirculated. The negative impact on nature stops completely. ARBOK has no noise, no air emissions, and the energy can even come from renewables, because it needs 10–15 times less than today’s technologies. By 2030 it is possible to stop hauling 5 million tonnes of salt and instead turn it back into useful products that bring profit — profit that can keep developing the process on a self-financing basis.
💰 Economics
💵 Let’s take the Werra brine and count what is dissolved in it. At 270–310 g/L magnesium chloride is now a marketable magnesium stream: about 500,000 tonnes of MgCl₂ a year in the concentrated part of the flow alone. Next — trace components, including copper at 8.6 mg/L. Converted to the annual flow that is about 14.6 tonnes of copper a year, which today is simply poured away. Yes, not much, but it is a plus, not buried underground at monstrous cost.
🧪 Further — the magnesium mother liquors of potash production, especially from carnallite (KCl·MgCl₂·6H₂O), are a classic industrial source of rubidium and caesium. These two alkali metals cost tens of thousands of dollars per kilogram, and more than 70% of world supply is controlled by China.
🌐 The volume of impurities is small, but again — it is both income and a measure of independence. And the direction is clear: a stream the company pays to get rid of potentially contains critical metals that Europe pays China for. Put it all together and you get a rare structure for an industrial project — three independent sources of value under one roof.
First — regulatory: eliminating liquid discharge removes the obligation that after 2027 threatens to limit production.
Second — raw materials: water and salt pay for the plant, copper gives confirmed revenue, magnesium is a marketable stream, and rubidium and caesium — once confirmed by assay — turn the “tail” into a source of strategic metals.
Third — political: recovering Cs and Rb lands squarely in the European agenda of critical-materials independence, which opens access to state support.
🏦 Three different wallets — one project. Tellingly, K+S is already moving this way. Since 2018 the kainite crystallization and flotation plant (KKF) has operated at Hattorf, extracting value from “useless” brines and cutting effluent volume by about 20% a year. The philosophy of “pull value from waste” is already accepted by the plant. The only question is how to achieve it. ARBOK can do it easily and quickly, even with its own funds, on a BOOM business model.
📦 An honest conversation must also name the difficulties. Werra’s volumes are huge: 5 million m³ of brine and 7.2 million tonnes of solid salt a year. These figures do not even count the continuing growth of waste. This is not one unit but a fleet of modular containers, each processing 200 m³ of brine per day.
📊 Let’s count on concrete figures. We take 5 million m³ of brine generated per year at a composition of about 400 g/L of salts (density ≈ 1.30 t/m³ — about 31% salts by mass and 69% water) and ARBOK parameters of 0.7 kWh/m³ at water recovery up to 99.98%.
💧 In these 5 million m³ there are about 1.5 million tonnes of dissolved salts, the rest is water. Volume is conserved during separation: the output is about 5 million m³ of clean recirculated water per year (water yield close to 100%), and fresh water from the Werra is no longer needed.
📦 The daily brine flow is about 13,700 m³ (roughly 570 m³ per hour). At a module capacity of 200 m³ per day, about 70 twenty-foot containers are needed — they fit on a storage platform or parking lot.
🧂 In annual terms the output is dry salts, separated by fraction:
magnesium chloride MgCl₂ — about 1.12 million tonnes;
potassium chloride KCl — about 163,000 tonnes;
magnesium sulphate MgSO₄ — about 154,000 tonnes;
salt NaCl — about 115,000 tonnes.
💎 In total about 1.55 million tonnes of marketable salts. Plus trace valuable components: copper about 33 tonnes, boron about 14 tonnes, zinc about 2 tonnes a year. Rubidium and caesium roughly — rubidium tens of tonnes, caesium a few tonnes a year (requires a direct assay of the mother liquor).
⚡ Energy of the whole fleet is about 2.7 GWh a year, an average power of around 0.31 MW. Thermal evaporation of the same volume of water uses 15–20 times more energy. Potentially such a low load can be covered by renewables — and then the technology becomes a “double Green” one.
💰 On the economics (a guide at world prices): the potassium product KCl alone is about $57 million a year added to what K+S already sells; magnesium sulphate — about $18 million; industrial salt — about $7 million (at $100 per tonne); copper — about $0.3 million. The largest stream by mass, MgCl₂ (1.12 million tonnes), at $100–250 per tonne gives a potential of $110–280 million a year. Thus the “solid” revenue is on the order of $82 million a year against today’s disposal costs (roughly tens of millions of € per year).
📌 A caveat: 400 g/L is an indicative concentration of the concentrated stream; out of the real 5 million m³ the salts may turn out a little less or a little more, but this does not materially affect the meaning of the project.
🔼 The ARBOK platform scales linearly: capacity is built up by adding modules, which reduces the risk of a “big leap.” One can start this very year and then simply ramp up processing volumes.
🥇 The first step is not to build a plant but to take a side stream of the mother liquor, perform recovery of water, salts and metals, and only then ramp up volumes. All product types will be produced at once, but K+S already has a market of buyers for potash fertilizer, and processing the brines increases its output. In addition — production of MgCl₂.
🌍 Monte Kali is not an anomaly of the German provinces. It is a diagnosis of the industry. Potash is mined in Canada, Belarus, Russia, Germany; everywhere the same arithmetic — several tonnes of salt waste per tonne of product. The same magnesium-chloride brines form in any potash basin. The same “dump and forget” logic works in mining, in mine and quarry waters, in oil-and-gas produced waters. Every such stream today counts as a liability. Each of them is a potential deposit of water, salt and metals that we simply have not learned to read. If even half of the world’s potash brines contain copper and alkali metals at comparable concentrations, this is not about local cleanup but about a new class of deposits — distributed, already brought to the surface, and waiting only for the right reading technology. The mountain at Heringen is visible for kilometres.
🎯 I propose to see it not as a heap but as a bill the industry wrote itself — and one long overdue to settle. The super-technology for this exists. It is time to stop calling raw material waste and move to real action. If you work with landfill leachate, mine waters or industrial brines — let’s count your stream too. Let K+S count as well. ARBOK works fast, and the first step is always the same: composition analysis and laboratory tests with a precise determination of what comes out — not in theory. It is done quickly. There is no time, everyone understands this and everyone wants it. Enough polluting; let’s help Nature.
👉 Follow Michael Vischmidt — every day brings an analysis of how waste becomes critical raw material.
Also published on: LinkedIn — Michael Vischmidt