❌ Now it can be recovered not from ore, but from copper effluent.
Molybdenum is the metal of heat-resistant and stainless steels, armor, pipelines and oil-refining catalysts. It has almost no ore of its own: >60% of the world’s molybdenum is a by-product of porphyry copper mines (Chile, Peru, Mexico, USA). Part of the molybdenum is not captured and leaves as the molybdate ion (MoO₄²⁻) in mine waters, leach solutions and tailings. Since 2025 China has imposed export controls on molybdenum — alongside tungsten, bismuth, indium and tellurium. Buying it has become a problem: licenses, delays, refusals. Meanwhile demand is rising — from reactor steels to catalysts — yet no one builds a dedicated molybdenum mine: it always comes “as a bonus” to copper.
❌ Baseline figures:
→ Molybdenum: ~$40/kg (China, 2026), market in deficit.
→ >60% of output is co-produced with copper; a standalone mine barely exists.
→ China controls ~40% of global processing.
→ Uses: heat-resistant and stainless steels, armor, hydrotreating catalysts. No substitute.
🟢 ARBOK’s technology: molybdenum recovery via vacuum separation — the same process that already pulls rhenium from copper-molybdenum waters:
→ deep vacuum (~1 kPa); the technology operates at ambient temperature.
→ 100% water return by volume
→ simultaneous removal of arsenic and uranium
→ concentration of molybdate (and perrhenate) → finishing by ion exchange
→ no furnaces, membranes, chemicals or consumables.
Molybdenum and rhenium come out of a single water stream. The technology works where the water already exists and has to be treated anyway — no new pit, no separate ore processing.
🟢 Economics.
One module (200 m³/day of effluent ≈ 70,000 m³/year) at 0.2 g/L Mo:
→ ~14 t molybdenum/year → ~$0.56M/year (at $40/kg)
→ + rhenium as a co-product: ~$0.01–0.02M/year
→ arsenic and uranium — a problem removed: they go into an immobilized fraction. Savings on fines and hazardous-sludge disposal: ~$30–50K/year [estimate, source needed]. Uranium — a potential product given a license and sufficient concentration
→ + 70,000 m³ of clean water back into circulation, i.e. ~$0.07M/year
TOTAL per unit: ~$0.70M/year
A large copper-molybdenum mine pumps millions of m³ of water per year — that is thousands of tons of molybdenum and tens of $M/year from one site.
🟢 At scale:
→ The copper industry moves ~5 billion m³ of water per year; even a 30% molybdenum recovery is ~18,000 t and ~$0.7B/year.
→ Every ton outside China means bypassing the export quota.
🟢 Where it changes everything:
→ Chile, Peru, USA, Mongolia — copper-molybdenum belts
→ Defense and aerospace — armor, superalloys, rhenium
→ Oil refining — hydrotreating catalysts.
🟢 Bottom line: molybdenum can be recovered on its own. It already flows in copper effluent that has to be cleaned anyway. ARBOK turns treatment into recovery: molybdenum and rhenium instead of losses — independence and +~$700M/year.